Documents Agreement Reached on 830523 Re Confirmatory Structural Analysis of Reactor Shield Wall.Addl Work to Verify Adequacy of Previous Calculations Under Way. Completion of All Work Expected by 840620
ML20091K934
Person / Time
Site: Byron  Constellation icon.png
Issue date: 05/30/1984
From: Tramm T
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
8715N, NUDOCS 8406070249
Download: ML20091K934 (2)


Text

- - _ - _ _ _ - _ _ _ - _ _ - _ _

6 Commonwcalth Edison P

Q One First National Plaza, Chicago Ilknois Address Reply to: Post Othce Box 767 g

Chicago, Illinois 60090 STAFF /

7 DPRP a/RA 3.,

rk

,jgp URSA May 30, 1984 10 3A0

$93 A

SGA l

y[p

_ F\\\\e Mr. James G. Keppler Regional Administrator U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

Byron Generating Station Units 1 and 2 Reactor Shield Wall Structural Analysis NRC Docket Nos. 50-454 and 50-455

Dear Mr. Keppler:

This letter documents the agreement reached on May 23, 1984 regarding confirmatory structural analysis of the reactor shield wall at Byron Station.

This analysis is being performed to address comments made by Mr. Jim Muffet of your office, during an inspection This letter at Sargent & Lundy regarding Byron design activities.

is submitted at the request of Mr. D. W. Hayes.

The exit meeting on May 23, 1984 was held to discuss Mr.

Muffet's review of the reactor shield wall, primary shield wall and fill slab structural design calculations.

Sargent & Lundy agreed to perform the following additional work to verify the adequacy of previous calculations:

1.

Complete work on the primary shield wall final load check model that includes a portion of the fill slab around the primary shield wall.

Account for the non-axisymmetric restraint of the primary 2.

shield wall for thermal loading.

Perform further analysis to verify the methods used to 3.

distribute seismic loads to the primary shield wall.

Clarify the reactor shield wall calculations to show there 4.

is no overstressed condition for design basis loadings.

8406070249 840530 PDR ADOCK 05000454

\\

A PDR

4 o.-

c--

i

-It was. agreed that as portions of this work are. completed,

Mr. Muffet be notified accordingly'to. commence his review.

It is

. anticipated-that all:: work.would be completed and ready for NRC

. review by June-20, 1984.

Please contact this office'if additional information-is required.-

Very truly yours, fho W