.g GPU Nuclear Corporation g gM p
One Upper Pond Road
"~#
WWWE u
Parsippany, New Jersey 07054 201 316 7000 TE LEX 136-482 Wnters Onect Dia! Number May 6, 1991 C000-91-1263 C311-91-2039 U.
S.
Nuclear Regulatory Commission Attn Document Control Desk Washington, DC 20555 Gentlemen
Subject:
Three Mile Island Nuclear Station, Unit No. 1 (TM1-1)
Docket No. 50-289 operating License No. DPR-50 Long Range Planning Program (LRPP)
Update of Integrated Schedule "ABC" Project Listing Pursuant to License DPR-50 Condition No. 2.c.9, CPUN hereby submits the required semi-annual update of projects listed in each category ( A, B, and c) defined by the LAPP integrated schedule. The attachments to this letter provide 1) the ABC project listing; and, 2) a summary of changes since our last update (GPUN Letter No. C311-90-2136 dated November 5, 1990).
The attachments contain details as follows:
1.
Attachment A - A new project listing of Category A, B,
and C projects annotated by an asterisk (*) to identify new projects and by a double asterisk (**) to identify changes in Budget Authorization (B/A) number assignments. Completed projects have been removed from the schedule listing. Remaining projects are ongoing or are scheduled consistent with cycle / year commitments. Any changes in schedule are reflected on Attachments A and B.
J.
Attachment B - A summary listing of Category A and B projects whLch have been completed, deferred, changed in scope, or otherwise changed with explanations, as appropriate.
The listing also contains Category C project completions.
Changes to the Category C scope or schedule do not impact the Category A and B schedules.
l Q
910D150250 910506 04 PDR ADOCK 05000289 R
PDR CMG;c3112039 L
GPU t'uclear Corporabon is a subsidiary of General Public Utdities Corporation
, ' t.
C311-91-2039 Page 2 No additions to the list of Category A projects have been noted in this submittal; however, two (2) additions to the list of Category B projects are noted.
In addition, Attachment B describen one (1) change to the list of Category B projects affecting schedule, and three (3) project identification changes in Category B.
Pureuant to the LRPP for TMI-1, it will be assumed that you are in agreement with the above Category B changes if you do not respond to this submittal within 15 days of receipt.
Sincerely,
/
, ' f, /
n
,?
Y-7
/'
N.-
,V g)4)tf O
R. L. Long g'
Vice President add Director of Corporate Servives RLL/GMG/ pip cca THI-I Project Manager Director Project Directorate I-4 Regional Administrator, Region 1 Senior NRC Resid(nt Inspector THI-1 l
CPG:t3112039
.. _. ~ -.. -. -.....~.._.--....._...~ - --...~ - -. ~.....-.... -...- ~.-.-.......-.-.. -
' 9 ~
e
-- e.
1 J
ATTACIDfENT A TMI-1 PROJECT LIFTING INTEGRATED SCHEDULE SEMI-ANNUAL UPDATE (MAY'4, 1991) i l-4 l
l l
{-
I i
y Nm*-
q reny e.w--&m-ym..
9-c.
.----g-m m3.-9,79-.39 w--,---yp-+ - -w.-.m1-y-.---mm4
~.,-..
e-y.g9-,7
-&-9 g
V
-t'
- s-V--
y p
g J
u T'M I. 1 P LISTING
...___.._____'R O J E C T LEGEND INTEGRA TED SCHEDULE NRC
'NEW PROJECTS BA. NUMBER CHANGE CATEGORY
'A' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF OIMAY91 OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMSER
' YEARS
.'t,
-t.
1 412462 ANTICIPATE TRANSIENT W/O SCRAH(ATWSDRULE 09R NRQ CR RELR CB
'TB MODIFICATIONS TO FULFILL RECUIREMENTS OF 10 CFR 50.62. LAI 88_9260 2 412567 STATION BLACKOUT 094 NCR ENGINEER AND INSTALL RECOWuENDED PLANT MODS IN ACCORDANCE WITH 10CFR50.63, LAI 89-3083 t
B ba 5
B s
W l
6 I
L i
?
i i
h 1
I t
f ))
(
\\v/
\\Am/
TUI-1 PROJECT LIST ING LEGENG N QC IN T EGQ A TED SCHEDULE NEW PROJECTS BA NUUSER CHANGE CATEGORY
- B*
PROJECTS SORT SY CATEGORY / CYCLE 7 4 STATUS AS Or 01mAY91 OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS 3 412551 INSTGUMENT AIR UPGGADES OF ISM INCREASE CAPACITY OF INSTRuwENT AIR SYSTEMS. (SPIE REC.)
REF. C311-88 2092 4
123275 OTSG TUBE PLUGGING 09R NCQ QB PLUG OTSG TUSES AS NECESSARY.
5 126203 OUTAGE 9Q QV ISI 094 NRR RB "J
PERFOC# 10 YEAR CEACTOR VESSEL INSE G VICE INSDECTIONS TO Coup _v WITH 10CFQ50.55 AND T.S.4.2 6 125217 OTSG EDDY CURRENT TESTING 7*Q NwD DB ECT OF SAMPLE INSPECTION Group INSPECT 3% PEQ GTSG PER TECH GPECS PLUG EXAMS.ECT AFTED SLEEVING 7 126219 TMI INSERVICE INSPECTION tOUTAGE 9Q) 09R NCR ALL ASME SECT XI IrtSPECTIONS; AUGCENTED ISI TO COMPLY WITH 10 CFR 50.55.
8 412556 TMI_1 CONTROL ROOM ALARM ENHANCEMENTS 09R ISH CR RELR ADD NEW ALARus. CCMBINE AND ELIMINATE ALAnuS: RECO:4rIGURE OVEDHEAD PANELS.
9 412569 RCS SHUTDOWN LEVEL uONITCRING 092 NO INSTALL LEVEL TDANSUITTER AND PROVIDE CONTROL ROOM WITH INDICATION.
(REF GL 88-17,LAI 89-9041) 10 412602 QuG 22/23 POWEQ FEED UPGQADE 09Q NCQ P2 OVIDE SEPADATE IE POWEQ CIRCUITS FGOu VITAL BUSES VED E VBA TO rug II E 23.
e m
g-"3 (V
\\
J T U!- 1 PROJECT LISTIN G LEGEND N RC IN TEGD A TED SCH EDUL E HEW PROJECTS BA NUMBER CHANGE CATEGORY
- B' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS Or CIMAY91 OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS 11 123ZYX REACTOR BLDG TENDON SURVEILLANCE PRCS 10 NRR PROVIDES FOR VENDOR SERVICES AND PLANT SUPPORT FOR NEXT TENDON SURVEILLANCE 12 123287 MAIN STEAM SYSTEM TEST. IOR 10R NDR 48 i
PERFO iM HYDROST A TIC TEST Or OTSG. 20 AND Fw PIPING.
EQUIRED BY 10 CFR 50.55 13 123289 ILRT _ 102 10R NER RB INTEGRATED LEAK RATE TEST OF CONTAINMENT _ 1993.
1A 123290 OTSG TUBE PLUGGING _ IOR IOR NRQ RB PLUG OTSG TUBES AS NECESSARY.
15 12692E OTSG EDDf CURRENT TESTING 10Q NRR RB ECT OF SAUPLE INSPECTION GROUPS 3% PER OTSG TECH SPEC INSPECTION; PLUG INSPECTIONS 16 12692H TMI INSERVICE INSPECTION 104 NRR ALL AsuE SECT XI INSEECTIONS: AUGuENTED ISI TO COMPLY WITH 10 CFR 50.55.
17 412611 REPLACE EIu MOTOR ACTUATORS 10E MER REPLACE EIM MOTOR ACTUATORS WITH LIMI.
TORQUE MOTOR ACTUATORS FOR SIX VALVES TO PROVIDE TEST CAPABILITIES PER GL 8?_10.
18 123811 OTSG TUBE PLUGGING 114 NRR RB PLUG OTSG TUBES AS NECESSARY.
TMI. 1 PROJECT LIST IN G N RC IN TEGR A T ED SCHEDULE LECEND NEw DROJECTS BA NUMBER CHANGE CATEG3RY
'B' PROJECTS STATUS AS OF OIWAY91 SORT BY C ATEGORY / C YCL E/ B A CYCLE /
CLASSIFICATION CBS BA DESCRIPTION YEARS NUMBER NER 11R 19 126K11 TMI INSERVICE INSPECTION ALL ASME SECTION NI INSPECTIONS: AUGuENTED ISI TO COwPLY WITH 10CF R50. 55 NCR l
88-93 20 128097 SOUG USERS GROUP PROGRAM l
SEISMIC CUALIFICATION UTILITY GROUP PARTICIPATION NRR 89-93 21 128108 TF SEISuIC QUALIFICATION OF ECUIP SCODE.WALKDOWNS AND EVALUATIONS FDD SOUG PROGRAM AS REOGIRED BY s,
NRC GL 87-02 & LAI 87-9084.
s NcR 89-93 22 412596 TuI-1 INDIVIDUAL PLANT EVALUATION INDUSTRY DEGRADED CORE ACTIVITIES
[
& PLANT SPECIFIC NRC SUBuITTAL.
l l
(REF LAI 89-9201)
NRR 90-92 23 128152 MOV PROGRAM DEVELOP & IMPLEMENT MOV PROGRAM TO MEET RECOuuENDATIONS OF NRC GL 89 10 FOR SAFETY RELATED MOV*S IN SFTY REL SYSTEMS NRR 24 419219 SIMULATOR MODIFICATIONS - TMI (1991) 91 UPGRADE SIMULATOR CONSISTENT WITH CONTROL ROOu UODIFICATIONS.
NER 92 SIuutATOR MODIFICATIONS TMI (1992) 25 41992K UPGRADE SIuULATOR CONSISTENT WITH CONTROL ROOM WODIFICATIONS.
NER 92-94 26 412AFU TMI IPE EXTERNAL EVENTS PERFORu THE IPE ANALYSIS FOR EXTERNAL EVENTS - FIRE. SEISMIO. EXTERNAL FLOODS.
w1NDS. TRANSPORTATION /NEAR FACIL ACCIDNT
'l
)[tfL Fl>
lt pt ? I) iIl;'IL 1<i-I,li!-!,
t!':b>E b
!!tii
!:i
.I" i
t rl 8
tiL:
t l
l-1 _
9_
Y _
A M __
1 _
0 __
r __
O_
S_
A S_
U_O
_N T
A
_I T_T S __ A C
_I R
R R
R
_F N
N
_I
_S
_S A
_L
_C E_
G N
L_
u_
I D_
T E __
S
_/
H_
_ES_
I
_ L R __
C_
_CA 3
4 L
_YE_
9 9
S_
_CY T
S D_
T C
C E-
~
E E
J T
O J
R A
P O
=
R=
R
=
B G
P E_
Y R
1 T _
O G
N_
E
)
)
T 3
4 I
I_
A 9
9 C
9 H 9 H U
1 T
1 T
C_
(
I
(
I W
W T
R_
I I
W T M T N_
T N.
T N.
_ TN
- TN SO SO S II S II N
- 2
_ N I OC I OC
_ O T CI T CI
_ I A
F A
r
_ T C RI C RT
_ P I OD I OO
_ I F TO F TO
_ R I AM I
AW
_ C D L D L
_ S O UM O
_ E M MO M
M' M O
_ D _
IO IO R SR R SR O
O A _
T EL T
EL A DO A CO B_
E
/
G E_
L_
M GN M GN I PO I PO C __
A Y
C
/_
ER Y -
JE R-OB O
RM G-PU E _-
T -
N W
A __ R_
P H
D EA N NB C_ABE_
3 4
9 9
E_
Y _ BM _
9 9
G_
B_
U_
1 1
E_*
N_
4 4
L T _
R _
O_S 7
8 S_O B
2 2
@e e
- ,j' il 14+I
- i1I
.iii-!
,i i
- Ii'
.I 4
i, > !i:1!!t
?t
- [j ll[itt!! j
((
f'
[
s[; * [l f
>f)L
):
[
[i
,lIf!F r[r lI' L!'
{!I[L?!
3
^
9 Y
A M
3 0
r O
['
S A
S U N T
O A
I T T S A C
I C
C L
C R
M R
F R
w E
R D
S R
I M
G R
E M
N I
N S
. S
. A L.
C E-G_
L-N_
U_
I_
D_
T._
E_
S
/
H.
LR -
C __
CA -
8 8
8 8
S 9
9 9
L_
YE_
0 0
0 0
O C
0 0
S-CY S
7 _
D_
C T
C_
E-E J
E_
O T
J_
C A -
P O_
Q-R-
C G_
D N
S G
E.
E_
Y R
IS
/
M L
HT I _
T_
O TA wT R
B TH G
NE N
NE O T G
N-E IR E
EE OC F NE DI T
AA H
S PO IA T EN uL I-I-
A S
P. S TS E
C A
G D
O E NU S NN A
ET D0 AE P MRE RLS C-R OO M II R LCI SA9 PR RUN AAT T
A II R
D G O W 2 S X
O
. ETN TI A._
G P U GSP S
AA F
UI U TA N NNF L NV E
O ET NN N
U RV T
RU NOD A AAC V EAL Ar L
.L H IIG O A A
OB E OLE T TT0 S V I
B LTT T T N I
PF L F G C R 4
NA C LL U "
=E A O
. TNW E GNN A
R AN I EOE G IER CLR OD T SIB M IAA V PD E LI R CLG A
OEE H RVI L PE N N E L E U
C PB B AL R
TP T U W O S
I ISD C AL N
_ EN N
R LIE O ES I
P. I E O NN MN N YCC O
CA A
EU G PDL T B L W P_
I N
NO H IAL T
O FL E N I REA LNA C VI. S SI AFG N R A
P I -RC.
T AD L
CM L UW
- LNS K KLY G TD E UTC U
N NN D
AM I EO A VUV C C T D EAL CNI I
T R
LA O NRB 1
L A AFI L RLB G EAM C
V NT A T A
- PR IGT
- 2EV R ROC B UP N SLE S
R
,AN M NE H EEG E B V
b A
C E I DH E
E G
.E BIT GRO B RET
- TD2 u LDP
.BOET T E C D
S N N LIAA L D.R U UVS W IM E ENA BIRCA H HN E IGO A
MI E I P L TOA C MET U UEC R PNI G TIE R DNP N D
U RT BE u R. I F F U
AD I AH A
PLLIM O LE FBBSL E EA E
N B EE T NE L EMT B
LOTO IBLM H
AL N C E C ESU NHKDG BNEM V
E
/
TAFAC TTAR TFTMA I AWN A VT OFCIA LTGTR O1e INE 1_
D G
B LET L ONH S AVR N
L A ACD D ST E EDS R PN P MIT I ROO D SIT I PIG A
C L C/N D NN P PON U E O E EOI O ERT D EAN M MUN P SGA A II S SRI T RAT R CJW P RPS A DMI T ITI SH Y
TC C
C
/
ER Y
JE R
OB O
RM G
PU E
N T
R W
A '
3 1
0 8
3 6
7 6
D EA C
E.
0 4
8 6
5 7
7 6
N NB A B._
3 5
5 5
7 0
5 7
E-Y BM 3
2 2
2 8
2 2
8 G-B U.
2 1
1 1
1 1
1 1
E-N.
1 4
4 4
4 4
4 4
L*
- T R
O S 9
0 1
2 3
4 5
6 S B 2
3 3
3 3
3 3
3 O
^
go9 j;
,li]
,i1j:i ij!
i' a
+d I
j-l 4jI j
I
TcI_1 PROJECT LISTING i
LEGEND N RC IN TEGRA TED SCHEDULE F
NEW PROJECTS
--..-.._.---------------..--. -_----- =-= =-
BA NUMBER CHANGE CATEGORY
'C' PROJECTS SORT BY CATEGORY /CfCLE/BA STATUS AS Or 01MAy91 i
.]
OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS i
37 422020 TMI 2 PDMS ALARM MONITORING BY TMI_1 09 NRR 1
ENGINEER, PROCURE AND INSTALL THE EQJIP.
NECESSARY TO MONITOR TWI-2 ALARMS BY UNIT 1 r
38 123FFF OTHER OUTAGE RELATED ACTIVITIES 09R ALL ALL OUTAGE RELATED ACTIVITIES SUCH AS INSPECTIONS. REPAIRS. SURVEILLANCES.
ITINOR MODIFICATIONS, MOD SUPPORT, ETC.
t 39 123278 9R REACTOR REFUELING 09R WRC sa RB i
76 NEW FUEL ASSEMBLIES. FULL CORE l
OFFLOAD.
i I
40 1232.99 RX BUILDING PRESERVATION 09R WRC l
RB l
PRESERVATION OF THE REACTOR BUILDING L
i I
l 41 123309 DEPL CRDW FLANGE GASAETS & BORON REM _9R 09R WRC INSPECT FOR BORON AND REPLACE LEAKING C.RDW FLANGE GASKETS (18-20).
REMOVE
)
E:ORON DEPOSITS FROM HEAD.
I f
42 123312 STAIN CONDENSER INTERIOR COATING REPAIR 09R URC i
TB DETAILED INSPECTION AND REPAIR OF MAIN CONDENSER COATING t
t 1
43 126218 STEAM EROSION INSPECTION 09R NRR ALL A.UGMENTED INSPECTIONS TO DETECT l
EROSION / DEGRADATION OF TMI SYSTEMS.
44 128128 OTSG CHEM CLEANING SYSTEM 094 MRC RB CHEMICAL CLEANING OF BOTH OTSG'S l
USING EPRI/SGOG PROCESS l
\\
r TUI_ 1 PROJECT LISTING i
I LEGEND NRC IN TEGRA TED SCHEDULE NEW PROJECTS BA NUMBER CHANGE CATEGOQY
'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 01MAY91 l
OBS BA DESCRIPTION CYCLE /
CLASSIFICATION s
NUMBER YEARS
[
i I
45 412075 REPLACE CONTROL ROOS 09R IDE RB
[
REPLACE 8 CONTROu RODS.
46 412512 TMI-UPGRADE RCP LUBE OIL SYSTEu 09R ISM l
i, REPL ACE LOCAL FILL PIPING ON LOWER CIL RES. OF 4 RCP. TIE INTO REM FILL LINES i
STARTED IN BR SEE 412512ME 47 4125'3 REPLACE BAILEY TRANSMITTERS. 9R 09R WRC RELQ RB REPLACE 10 BAILEY BY TRANSMIT. INSTAL i
NEW POWER SUPPLY MODULES. WIRING
[
00 CHANGES IN ICS/NNI l
s 48 412578 RCP'E US LINE HANGAR PLATFORMS 09R ISu l
t RB DESIGN, PROCURE & INSTALL PERMANANT
+
PLATFORMS IN RB TO SERVICE RCP_IA/D LOWER MOTOR E COUPLNG E MS LINE. HANGERS
-[
49 412590 BIRO T/C CABLE REPLACEMENT 094 NRR RB CHANGE CABLING FOR 16 EO INCORE DETECTORS. MODIFY PENETRATION
[
I E
50 412597 OTSG TUBE SLEEVILG 094 REL i
l RB j
SLEEVE APPROxIMATELY 125 OTSG TUBES PER i
OTSG IN THE LANE WEDGE AREA l
MODIFY RB PENETRATIONS 51 412598 UPGRADE SOURCE RANGE NUCLEAR INSTR (NI) 092 MRC CB REPLACE THE INDICATION, ALARM, AND CON.
TROL FUNCTIONS OF NI-1,2 WITH NI_11,12.
9 EXISTING NI-1,2 BACKUP NI-11,12 FOR CYO9 r
52 412603 FOxBORO TRANSMITTER REPLACEMENT 09R MRC i
I RB REPLACE 8 FOxBORO PRESSURE & DIFF PDESS TRANSMITTERS. ASSOCIATED WITH OTSG LEVEL
[
INDICATION AND CONTROL I
i l
i i
r
a
("
f
\\
l TUI-1 PROJECT LISTING I
LEGEND i
NRC Ih TEGRA T ED SCHEDULE l
NEw PROJECTS t
BA HUMBER CHANGE L
CATEGORY
'C' PROJECTS I
SORT BY CATEGORY / CYCLE /BA STATUS AS OF 01MAY91
[
OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS 53 418705 INCORE DETECTOR REPLACEMENT 09E' NRR RB REPLACE 52 INCORE DETECTORS.
i i
i i
i 54 422020 TMI-2 PDMS ALARM MONITORING BY TMI-I 09R NRR i
ENGINEER, PROCURE AND INSTALL THE EQUIP.
i l
NECESSARY TO MONITOR TMI.2 ALARMS BT UNIT 1 l
55 123DDD OTHER OUTAGE RELATED ACTIVITIES 10R ALL i
ALL l
OUTAGE RELATED ACTIVITIES SUCH AS l
INSPECTIONS. REPAIRS. SURVEILLANCES.
t u3 WINOR MODIFICATIONS, MOD SUPPORT, ETC.
l 8
56 123194 RX REFUELING - 10R 10R MRC RB 68 NEW FUEL ASSEMBLIES, LOAD FOR f
585 EFPD 57 123299 RX BLDG PRESERVATION-PROGRAM IOR MRC l
PRESERVATION IN THE REACTOR BUILDING j
i 58 123309 CEPL'CRDM FLANGE GASKETS / BORON REM IcQ Ice uRC INSPECT FOR BORON AND REPLACC REMAINING I
CRDM FLANGE GASKETS (35-37 EST).
RE-WOVE BORON DEPOSITS FROM HEAD AS REO'D.
59-123312 WAIN CONDENSER INTERIOR COATING REPAIR IOR MRC
[
TB L
EETAILED INSPECTION AND REPAIR OF MAIN i
CONOENSER COATING 4
i 60 12692F STEAM EROSION INSPECTION 10R NDR I
I ALL AUGMENTED INSPECTIONS'TO DETECT j
EROSION / DEGRADATION OF TUI SYSTEMS.
i
i'
- [,
t t
t
[;?[;![l
!![!i fI [t[
,F!'
i!
>(;j,.I E
t(,!rI?iL(iIh 1 -
9 -
Y _
A _
M -
1 0_
F_
C_
3 _
A -
S-U_N T
O A
_I
_T T
S_C A
.I L
C L
L M
R C
C E
R E
E S
E R
D
_F R
M R
R I
N M
M
_I
_S
_S
_A
_L
_C E-G L-N U-I D-T E_
S
_/ -
H-
_ES.
I
_LR 4
R R
R A
R R
R C-
_CA 0
0 C
C 0
0 0
0 L
YE.
1 1
I I
1 1
1 1
S-CY T
- D-T S
C C
E_
E E
J T -
O J
R A -
P O
R-R C'
G-P E-T G
R E
L T D_
S R
FN E R N
)
S8 H
A N
1 T -
O GEI C OH S
T T
E AN I
S E
G NDD A
CT D
S M O
N DL RD N-E I L L /IN I
N N E S
(
I M D I C
R/
AN A
T G SOU E O I N
E N A
Ew R
- N F
I I-A C
D EFB R RSS E
G T
A M L M T
2, H FSL A
U L T ETO L
S S
R P RS S
IEO C-E SR N NR O
T Y
S E E OR N
1C T O R T
TYO O OER S.
O S T P R FE I
N HT R UST I TNO A
SM I2 E &TN R-O SC S OC S
R N
U R NR R
N1 M
IO Q.T N-T EAA O EP/
E E
O N E AO A
E EWC C R E R LMN D
F I
ME M RF E
M1 C R A
ULR R BOO O
T FEU R TS L
O1 A UCD E CE O ICI IS S
A OTQ O N
C R L SON R OUE C T S DE E
N SE F XA U FI P
SSA RFH / PHO R
B I NYS S UR N
R OSB N AT S
R RAC N
O T
O SIE NT T
O I U A E RR P I
_O F DCN R UW IA L TES R
) X G OO R
_I NEI E S O DE G 5 H
AT T 2U N TF E ORN
_T T AP ET DF N 2N C LI (AS A C T RAI
_P N
SS T
SC A
I 1O LRY Y
R R ES T O
_I E NND S MAE E
V I
S AOL R GWE TR I B3L
_R M GIO Y
ELC YC E
.G U-TLE A NEG E EE M
X E
P I R S TPN S BN E XE O - SHV I INN C DB S O ;V
_. C I SO SEE E A
L OR E NCI L T A R
M N FSE
_S U ETL R YRT D SN S R S IOT L S)H UB3AE' A RL
_E
_D Q D E E S S A PE PE A
PC I I2C OR HL R 1E E
.T U T
DI R ST E PG G TYE X
X(
S FCB T 1TG NF A ENS G HN B AD NHP U E P B A TS T PE W TAE P I
U E
E E S A LA E NC O' EIT A _
U OME
/BA R U YA TBEW C NME ELT DBEO RBCUO B __
E
/
LPV MTUN FW RV A AUR -
1_
OTE R OST B LNH VA ACVIE ORAS G
E_
L EII A
LOE S I
G EE L UI N
L E VUT E AIR P DD S EN P QDS I
MSN G MSU X
PAT A
C_
U EQC T
VSO S O N.
T LA E EOY M ENI P EIO O ERI sH Y
F DEE S EOH H H4 U GL 1 dss T
RIL U RFR F RTw TC C_
C
/
ER Y _
JE R.
OB O __
RM PU G_
E_
N T
W A. R -
G Y
C N
0 5
8 3
D EA E-E E
F F
7 9
9 0
N NB C_AB_
A A-A A
5 5
5 6
E-Y _BM.
2 2
2 2
2 2
2 2
G-B_
U.
1 1
1 1
1 1
1 1
N.
E-4 4
4 4
4 4
4 4
L-
- T R _.
O_S 1
2 3
4 5
6 7
8 S B 6
6 6
6 5
6 6
6
_O e
l u
.i:
i:l 1
4 tl 2
.',i
L5!:1:
l' i?l
.! f,I I,t[;
.I
[i.
I f
tf' i'[i[>!,fIj!
,!ii!f;
[ti
- i' 1 _
3_
Y A _
M _
^
1 _
G _
F _
O_
S_
A S_MU_O T
A _I
_T T
S_C A
_I L
L C
R R
C U
R
_F E
L R
R R
R S
R
_I R
A u
N N
u I
E
_S
_S
_A
_L
_C E_
G __
L_
N_
U _-
I_
D_
T_
E_
S_
1 4
5 1
_/
H __
_ES_
9_
9 9
9_
_LR I_
R R
R R
C_
_CA 0
1 1
1 8
3 5
9 L_
S_
_CY
_TE_
1 1
1 1
8 8
8 8
T __
S C __
D_
T C
E_
E J
E __
T _
O J_
R A _
C O_
R_
C' R_
G_
P_
E_
Y W
S R
W A
K N
1 _
T _
O E
R N NO G
)
T C
G A OL N_
E S
S
.T G
O T IL T
C Y
SE N
R E
TA I_
I_
A T
NS E
I S
P H
E AG C
D I SC.
D u
9 4
OT G L O_
(
AL ANT L
E 8
Y 0
T A
L0 C_
MO S
AR I
TT
/
T 4
H R
A0 T_
M R
E HLO U
CS 8 G I
NT O T0 R_
E FT I CLP B
EY 8
O L K OI T
S4 T
ON T UIP TS 9
W I S IW S N N_
S O
I SEU R
E 1
B B A T
IE Y
NC V
VS O
DI A
T AM D
N S O I SR T
M u E I
O T R T E R M GSM O ADN
.M O RT A T I
E I
F G
R G E IYE R NA R OI I
T R T
SO O N S
T FST G SAT
_N T
PG D VS. A C N R I R
S N S P K
_O N
I E IRS V
E E ON P
O I Y
OIY E NNE O CD T
T R
S CNS D AOG
_I T
C I A CAO E T S TI P O A
P N
N TLA
_P NH L API S N CT U I R E L M/L U LR E OT E
O ESO RAO
_I N RI R DRA R O PD R A N R R TCR F UGT
_R I TW E C P N SE G P E O T SIT O O S
_C
_S B C E T
.I N
O NR I
G F N
Y N
F0 R EC G ASF G O I IG S C O SEO T 0O
_E U LH A
LNI N I S
E I
M G C
HC N F0N
_D T EE T
T A
N AT E O0U U RIG D A
R E/
E R E I D
D M 1O A _
L EE OL Tu L V ELTN N
A T
D E PEE E L R A CN LEC IBR LNO W P S N C OCC C AEG B_
E
/
T AI RAGER URE MAEI O
U N LAN A
VNR G
E_
I LB E
APO B S A
MS N
I F_
A ELA L OOE N
L_
G PR H TSN E
E GO W U R
V VPV P M D A
O._
I EU T
UNI X
R T
UR P
P O D EED E EFN SH Y
D RT O OIL R P S AE B G E C A DRA R ROU TC C_
C
/
ER Y _
JE R _
OB O_
RM G __
PU E_
N T
W A _ R _
9 G
9 1
2 4
6 6
D_EA C_AB_
E _
0 G
9 1
2 1
3 8
E_NB N
6 G
2 J
1 1
5 6
/
_BM_
Y 2
3 3
6 8
8 2
9 G-U_
B_
1 2
2 2
2 2
1 1
E_*
N_
4 1
1 1
1 1
4 4
L T _
R_
O_S 9
0 1
2 3
4 5
6 S __ B 6
7 7
7 7
7 7
}
O
.N g
e i.
'l 4i' lll1!IIll'!
I I
g 6
TUI. 1 PROJECT LIS T ING 5
t i
LEGEND NRC INTEGRA T ED SCHEDULE NEW PROJECTS Y
BA NUMBER CHANGE i
I' CATEGORY
- C' PROJECTS
~
l SORT BY CATEGORY / CYCLE /BA STATUS AS OF 01MAY91 OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS
.___.... _______________. __________.. ____..______..___._________.__.....____~._______.___..______.._._____________........__
1 77 418750 SERVICE BUILDING ADDITION E9 92 FAC CONSTRUCT AN ADDITION TO THE NORTN SIDE OF THE SERVICE BUILDING 78 419633 UPGRADE DOuCSTIC WATER SYSTEM 89-92 FAC l
SURVEY EXISTING DOuCSTIC WATER SYSTEM 2 1
REPLACE /UDGRADr. AS NECESSARY.
l I-79 419689 ROOF REPLACEMENTS 89-93 FAC e
REPLACE ROOFS ON BLDG 36 WARENOUSE 1.
j R$
WARENOUSE 3,
ANO DEwEY NOUSE.
i 80 123262 RELIABILITY CENTERED WAINTENANCE PROG 8?-94 WRC RCM EVALUATION OF PLANT SYSTEMS TO DEFINE'MAINT. ACTIVITIES THAT IMPROVE RELIABILITY.
81 126207.
OPERATOR TRAINING ANALYSIS 89/92 NRR I
CONDUCT ANALYSIS OF AO.CRO.%F/SS' POSITIONS s
j
REFERENCE:
NUREG 1122 82 128150 CouMERCIAL GRADC DEDICATION 90/91 NRR PREPARE AND IMPLEMENT A COMMERCIAL GRADE DEICATION PROGRAM INCLUDING DOCUMENT CONTROL AND TRAINING.
83 419665 CONSTRUCT TRAINING LABS 90/92 FAC PROVIDE FOR TRAINING LABS
~
IN EXIETING STRUCTURES.
84 412591 1991 CONFIGURATION MANAGEMENT _ DBR 91 IDE DESIGN BASIS RECONSTITUTION 1991 BEYCND 1991
s s
g
%,/
~
TUI-1 PROJECT LISTING LEGEND NRC IN TEGR A TED S C si EDULE,
NEW PROJECTS BA NUuBER CHANGE l
CATEGORY
'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 01MAv91 OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS 85 418755 RC P SEAL CARTRIDGE TEST EQPT.
91 REL l
PURCHASE CARTRIDGE SEAL TESTER j
MODS
'O REDUCE IRON TRANSPODT TO OTSG 91-93 URC 86 412608 REVIEW SECONDARY SYSTEM CHEu HISTORY S. INDUSTRY PRACTICES AND RECOMMEND I
STRATEGY FOR CCRRECTIVE ACTIONS 87 126223 TMI APPENDIX VIII QUALIFICATION 91 94 NRR
{
i TO PAY FOR UDGRADED TRAINING & TESTING
'd PROGRAMS DEVEL BY CONTRACTOR FOR OuAL &
[
s CERT OF UT NDE INSPECTORS PER APP VIII 88 126220 EVALUATION OF WAREHOUSE STOCK - TMI 91/92 IOE I
PERF EVAL CONCERN MIX SAFET( CLASS. NO CLASS ON OLD QA TAGS & MAT *S INVENT.
{
SCREENS. TO SUPP. COMM GRADE DED.
j 89 126222 NGCLEAR ASSUR OUTAGE SUPPORT _9R 91/92 NRR PROVIDE NUCLEAR ASSURANOE SUPPORT DURING THE TMI 9R OUTAGE I
90 128151 CAVITY DOSIMETRY ANALYSIS 91/92 NQD SHIP' IRRADIATED CAVITY DOSIMETRY REMOVED IN 9R AND ANALALVIE 91 128ACP ORAWING ENHANCEMENTS TMI 92 uRC
- 1. ENHANCE THE LEGIBILITY OF APPR 500 DWGS.
- 2. REDRAW FLOW DIAG. IN CAD FORM AT
[
3.
REDRAW GEN ARRANG IN CAD FORMAT i
92 128ACS Gt!IDELINES FOR ABNOpMAL TRANSIENT PROC 92 IDE
[
DEVELOP PLANT SPEC GUIDE (PSG) FOR tut _1 p
ATP PROVIDING TECH BASES FOR ATP'S TO BE p
USED IN TRAINING, EVAL PROC CHANGES.ETC.
- s
~
g TUI-1 P R O J E.C T LISTING LEGEND N RC IN T EGRA TED SCH EDULE 4
NEW PROJECTS BA NUMBER CHANGE CATEGORY
- C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS Or 01MAY91 OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS 93 128ACU 1992 TMI-I CONFIG. MANAGMNT - SSFI 92 ISM PERFORM ONE (1) SA~ETY SYSTEM FUNCTIONAL INSPECTION (SSFI). PREP DRAFT DESIGN BASIS DOCUMENT (IF REQUIRED).
94 419710 UNIT 2 ADMIN BLOG 92 FAC ENGINEERING STUDY. VENTILATION AND HVAC MODIFICATIONS 95 126101 PLANT LIFE ASSURANCE / EXTENSION 92-94 REL SUPPORT OF STUDIES BY GPUN & BwOG FOR FEASIBILITY OF EXTENDING OPERATING e
LIFE.
96 128ABT B&W OWNER'S GROUP PROGQAM - 1992/93 92_94 NGR PARTICIPATION IN 844 OwaERS PROGRAM 97 412592 1992 CONFIGURATION MANAGEML.1 _ DBR 92-94 ICE DESIGN BASIS RECONST..JTION 1992 BEYOND 1992 98 419669 TMI ROADS UPGRADE 92/93 FAC NORTH BRIDGE PAVING. LIBERTY LANE i
UPGRADE.RESTRIPING. UNIT 2 RX HATCH l
IMPROVEMENT 99 411AFF CORE MONITORING SYSTEM UPGRADE 92/94 ISM i
DESIGN AND INSTALL A CORE MONITORING i
.R I
SYS(CMS) TO REPLACE THE EXISTING t' APPLIC SOFTWARE SYS.
[
ALL j
MODIFY ANCHORAGES / SUPPORTS. REPLACE PROTECTIVE RELAYS TO COMPLY WITH SEISMIC QUALIFICATIONS. SCOPE NOT DEFINED.
t I
)
I
i a
i TUI-1 PROJECT LISTING LEGEND 1
l NRC IN TEGR A TED SCNEDGLE NEW PROJECTS-i BA NUMBER CHANGE
'i
[
CATEGORY
- C' PROJECTS I
j SORT BY CATEGORY / CYCLE /BA
. STATUS AS OF 01MAY91 i
OBS BA DESCRIPTION C'.CLE/
CLASSIFICATION i
YEARS j-NUMBER i
?
i 3
101 12693A EVAL 07.TMI ALERT & NOTIFICATION SYSTEM 94 NRR l
i EVALUATE SYSTEM SIRENS USING LATEST l
DEMOGRAPHIC E TOPOGRAPHIC INFO TO INSURE i
STILL MEETING FEMA REQMNTS l
i 102 12694C MAINTENANCE TRAINING ANALYSIS 94 NRQ r
DEVELOP TASK ANALYSIS FOR IEC. ELECTRICAL' AND MECHANICAL INPO ACCREDITED PROG L
1 i
I I
i be f
f f
1 P
f I
l 4
i I
4 t
t l
i i
t t
i i
l 1
4 l
t t
_t
..m ATTACHME!JT D CHAT 10ES TO THI-1 NUCLEAR Gr!Jr. RATING STAT 1014 IliTFCRATED SCllEDULE t
SEMI A!J!JUAL UPDATE (MAY 4, 1991) i i
CAIM01<Y A PROJErld
.Additione 14one Ccoplotions:
None j
t l
Deletions:
None Schedule changes
!Jone I
t i
f t
I t
1 l
5 f
i l
[
i t
l l
r i
l i
t l
I h
ATTActtMr!47 H (continued) 4 ChlE@lW.B 1102.ECIA Additions:
As denoted by
- next to the project title in Attachment A Completions:
126209 ISI Update 412523 Replicato simulator certification Upgrado 419213 Plant-Referenced Simulator certification i
Deletiones fione Schodale Changoca 128152 MOV Program - This project achedule has been revised to be completed in 1992.(was 1994) l Other Changesi DS.A2et Act iv_it v - (PALL [umtsr_fJjAp_gyn i
The f ollowing BA nun. born have been changed.
There la no change in scope or schedule associated wit h theco changes.
i DAs which have had their numbers changed are indicated by a 1
- in Attachment A i
QPR ECS11SSLJ12Litu! Iter 11ew I%
10 412AFD RMG 22/23 Power Food 418602 23 120ACR MOV Program 128152 24 419910 Simulator Modifications 419229 i
1 l
1 f
i t
~>wer--www--we.wm--meeeww-er-sw--.,.w.,,..~._
THI-1 Integrated Schedule ATTAci!ME!JT B (continued) fM T90 elf _1192FCTs Additione Ao denoted by ' next to the ptolect title in Att achn ent A-Con plet. ions :
128146 THI-I NDCT Inopect and Pepair 412569 Modification to Enhance DC-V2/65 control 128139 post 1989 Config. Mgmt.
412581 post 1989 Config. Mgat.
418058 Security Accous Cont rol Con puter Enhance.
419744 Turbine Building South Addition 419477 Emergency Connonicat ions Syu. Upgrade Deletionn 419b93 1993 Contig. Mgmt. DUB on Hold 126104 Tech spec It:provements 41970B Turbine Duilding Tool !ihop 412AEA Additional Multiplexere Cancelled:
128ACV 1993 TMI-I Config. Mgmt. - SSFI DA llutnber Changes:
OM trrritu t_NL!Nrhtt litM.JM 52/6B 412 AEQ f oxboro Trant;mitter Boplace 412603 69 412AEU Digital Turbino Control Syn 412609 63 412597 Tube Sleoving 412AF14 86 412AEV Optionn to Reduce Iron Trana.412000 87 12591G TM1 Appendix VII Qual 126223 88 12091A Eval, of Warehouse Stock 126220
........ -