ML20090K724

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Dec 1991 for North Anna 1
ML20090K724
Person / Time
Site: North Anna Dominion icon.png
Issue date: 12/31/1991
From: Mladen C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML20090K594 List:
References
NUDOCS 9203190258
Download: ML20090K724 (2)


Text

...

. ~

OPERATING DATA REPORT k

DOCKET Wo.:

50 338 DATE: Jersaary 2,1991 COMPLETED ST:

C. MI6 den ONRATING STATU$

1.

Uni t N ame s................................ North Arne 1

2. - Report i ng Per i od s.........................Decostwr 1991
3. ' Licensed Thorinet Power (IWt).............

2,893 4 Nameplete Rating (Gross MWe)t.............

947 5.- Design Electrical notine (het NWe):.......

907 6.

Nexteur. Depeedsble Capacity (Gross MWe)..

959 7.

Mediaue Deperdable Capacity (het HWe)g....

911

+8.

If changes occur in Cerecity Ratings (itsee No. 3 thru 7) since lost report, give reasons:

N/6 9.

Power level to which restricted, if erry (Net MWe):

N/A

10. teosons for restrictions, if e v

_N/A This Month bt0 C.unuletin

~

1. nours in Rererting Period................................

744. 0 8,760,D -

118,572.0-

12. Nweer of. Noves aeoctor ises cri ticat.....................

549.8 6,697.6 86,688.5

- 13. Reac t or R es erve Shutdown Hours........................... 9.5 118.1 6, 721.7

14. Hours Genera t or 0n L i ne.................................

549.0 6,551.5 83,771.5

15. unit leserve Shutdown Wours.....,........................

0.0 0.0 0.0

16. Gross Thernet Energy Generated (MWM)..................... 1,580,202.8 17,966,536.4 222,952,772.4 17, cross Electrical Energy Generated (MWn)..................

521,079.0-5,916,509.0

/ 73,257,847.0

18. Net Electrical Energy Generated (NWM)....................

497,338.0 5, 625,865.0 69,354,617.0

39. Unit Service Factor.......................~..............

73.8%

74.8%

70.7%

20. Unit Aveltability Factor.................................

73.8%

74.8%

70.7%

121. Unit Capacity' Factor (using ICC Net).......

73.4%

70.5%

65.3%

22. Uni t Capac i ty f act or ( us ir.g dea Net ).....................

73.7%

70.8%

64.5%

'23. Forced outage Rate.......................................

0.01 9.2E 12.3%

24. Shutdowns $chedutM Over Next 6 Months (Type, Date, ard Duration of Each),,,, Steam Gerwrotor Inspection Outage ecneanced 12/23/9t to test erproxiestely 60 day
25. If Shutdown at eed of Report Period, estimated time of stsettet,

03/01/92

23. Units in Test Status (Prior to Consmercist Operation):

i-Forecast Achiet1sd 1NITIAL CRITICALITY L

INITIAL ELECTRICITY l

-COMMERCIAL OPERATICH t -

L l

9203190258 920316 PDR ADOCK 05000330 R

PDR

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET HO.:

50-338 i

UNIT NAME:

NA-1 DATE:

January 2, 1992 REPORT MONTH: December 1991 COMPLETED BY:

C. Mladen i

PHONE:

(703) 894-2774 l

l l

l 1

1 2

3 4

5 l

No.

Date Type Duration Reason Method of Licensee System Co=ponent Cause & Corrective l

(hrs)

Shutting Event Code Code Action to I

Down Reactor Report #

Prevent Recurrance i

l 91-10 911223 S

195.0 A

1 91-022 SB SG Unit shutdown required by T.S.

3.0.3 due to declaring all three steam gen rators inoperable (refer to LER).

~~~

1: Type 2: Reason 3: Method 4:

F= Forced A= Equipment failure (czplain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparatiots of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-Ol61)

F= Administrative 9=Other G= Operational Error 5:

H=Other (explain)

Exhibit h - Same Source l

es

_t I

~