OPERATING DATA REPORT k
DOCKET Wo.:
50 338 DATE: Jersaary 2,1991 COMPLETED ST:
C. MI6 den ONRATING STATU$
1.
Uni t N ame s................................ North Arne 1
- 2. - Report i ng Per i od s.........................Decostwr 1991
- 3. ' Licensed Thorinet Power (IWt).............
2,893 4 Nameplete Rating (Gross MWe)t.............
947 5.- Design Electrical notine (het NWe):.......
907 6.
Nexteur. Depeedsble Capacity (Gross MWe)..
959 7.
Mediaue Deperdable Capacity (het HWe)g....
911
+8.
If changes occur in Cerecity Ratings (itsee No. 3 thru 7) since lost report, give reasons:
N/6 9.
Power level to which restricted, if erry (Net MWe):
N/A
- 10. teosons for restrictions, if e v
_N/A This Month bt0 C.unuletin
~
- 1. nours in Rererting Period................................
744. 0 8,760,D -
118,572.0-
- 12. Nweer of. Noves aeoctor ises cri ticat.....................
549.8 6,697.6 86,688.5
- 13. Reac t or R es erve Shutdown Hours........................... 9.5 118.1 6, 721.7
- 14. Hours Genera t or 0n L i ne.................................
549.0 6,551.5 83,771.5
- 15. unit leserve Shutdown Wours.....,........................
0.0 0.0 0.0
- 16. Gross Thernet Energy Generated (MWM)..................... 1,580,202.8 17,966,536.4 222,952,772.4 17, cross Electrical Energy Generated (MWn)..................
521,079.0-5,916,509.0
/ 73,257,847.0
- 18. Net Electrical Energy Generated (NWM)....................
497,338.0 5, 625,865.0 69,354,617.0
- 39. Unit Service Factor.......................~..............
73.8%
74.8%
70.7%
- 20. Unit Aveltability Factor.................................
73.8%
74.8%
70.7%
121. Unit Capacity' Factor (using ICC Net).......
73.4%
70.5%
65.3%
- 22. Uni t Capac i ty f act or ( us ir.g dea Net ).....................
73.7%
70.8%
64.5%
'23. Forced outage Rate.......................................
0.01 9.2E 12.3%
- 24. Shutdowns $chedutM Over Next 6 Months (Type, Date, ard Duration of Each),,,, Steam Gerwrotor Inspection Outage ecneanced 12/23/9t to test erproxiestely 60 day
- 25. If Shutdown at eed of Report Period, estimated time of stsettet,
03/01/92
- 23. Units in Test Status (Prior to Consmercist Operation):
i-Forecast Achiet1sd 1NITIAL CRITICALITY L
INITIAL ELECTRICITY l
-COMMERCIAL OPERATICH t -
L l
9203190258 920316 PDR ADOCK 05000330 R
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET HO.:
50-338 i
UNIT NAME:
NA-1 DATE:
January 2, 1992 REPORT MONTH: December 1991 COMPLETED BY:
C. Mladen i
PHONE:
(703) 894-2774 l
l l
l 1
1 2
3 4
5 l
No.
Date Type Duration Reason Method of Licensee System Co=ponent Cause & Corrective l
(hrs)
Shutting Event Code Code Action to I
Down Reactor Report #
Prevent Recurrance i
l 91-10 911223 S
195.0 A
1 91-022 SB SG Unit shutdown required by T.S.
3.0.3 due to declaring all three steam gen rators inoperable (refer to LER).
~~~
1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment failure (czplain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparatiots of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-Ol61)
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain)