Forwards Response to Followup Items from Pump & Valve Operability Review Team Audit on 840313-16.Valve 1/NF/234A Qualified for Operation at -10 F
ML20088A873
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 04/11/1984
From: Tucker H
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8404130250
Download: ML20088A873 (2)


Text

o DUKE POWER GOMRtNY P.O. Itox 33180 CIIAltLOTTE, N.C. 28242 HALH. TUCKER TELEPHONE wwm emessnewr (704) 373-4531 April 11, 1984 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: Catawba Nuclear Station Docket Nos. 50-413 and 50-414

Dear Mr. Denton:

On March 13-16, 1984 the NRC Staff and their consultants performed a Pump and Valve Operability Review Team (PVORT) at the Catawba Nuclear Station.

Attached is a response to the follow-up items from the audit.

Very truly yours, db/

Hal B. Tucker ROS/php Attachment cc: Mr. James P. O'Reilly Palmetto Alliance Regional Administrator 21351 Devine Street U. S. Nuclear Regulatory Commission Columbia, South Carolina 29205 Region II 101 Marietta Street, NW, Suite 2900 Mr. Jesse L. Riley Atlanta, Georgia 30303 Carolina Environmental Study Group NRC Resident Inspector 854 Henley Place Catawba Nuclear Station

-Charlotte, North Carolina 28207 Mr. Robert Guild, Esq.

Attorney-at-Law P. O. Box 12097 Charleston, South Carolina 29412 el

'll 8404130250 840411 PDR ADOCK 05000413 A

PDR_,

i PVORT AUDIT RESPONSES Catawba Nuclear Station Unit 1

Subject:

Open Items from 3/13,-16/84 PVORT Audit conducted by Jerry Jackson - NRC Duke Response - Generic Items:

A.

Direct comparison of as-built piping loads to the allowable equipment nozzle loads assures that all Catawba safety-related equipment will have acceptable loading during performance of safety functions.

B.

Operability qualification of safety-related equipment at Catawba is complete and all design requirements have been met.

Duke Response - Specific Equipment Item:

A.

Catawba valve 1/NF/234A is qualified for operation at -10 F.

An analysis providing verification has been inserted into the valve seismic report CNM-1205.00-1020 for permanent record.

- - -