PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHI A PA.19101 SHIELDS L. D A LTROFF
.uW.'f//$5E April 2, 1984 Docket Nos. 50-277 50-278 Mr. Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555
SUBJECT:
1983 Annual Report on Safety-Relief Valve Challenges at Peach Bottom Atomic Power Station
Dear Mr. Eisenhut:
This letter represents the 1983 annual report on safety-relief valve challenges for the Peach Bottom Atomic Power Station as required by the TMI Action Plan, NUREG-0737, Item II.K.3.3.
The definition of challenges considered in this report is the automatic opening of the primary coolant system safety or relief valves in response to nigh reactor pressure.
During 1983, there were no challenges to the primary coolant system and relief valves on Peach Bottom Units 2 and 3.
Should you have any questions regarding this matter, please do not hesitate to contact us.
Very truly yours, y/
)
j,/l
//
l' jh
/N cc: A. R. Blough, Site Inspector 8404090339 840402 h