Text
+
- .7 *.
SOUTH CAROLINA ELECTRIC & GAS COMPANY POST OPPICE 764 Cotuus A, SOUTH CAROLINA 29218 O. W. DixON. JR.
' y g $ang ;380 984 1
vien e...N, NucLean Op. RATIONS Mr. J.
P.'.O'Reilly, Regional Administrator U.
S. Nuclear Regulatory Commission Region II,1 Suite 2900 101 Marietta Street, N.W.
~
Atlanta, GA 30303
~
Subject:
Virgil C.
Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Special Report (SPR 84-001)
Supplement 1
Dear Mr. O'Reilly:
Please find-attached Supplement No. 1 to Special Report (SPR)84-001 which was submitted by the Licensee on Februry 9, 1984.
This_ Report is required by Technical Specification 6.9.2 as a result of entry into Action Statement (a) of Technical Specification 3.7.10, " Fire Rated Assemblies," on January 10, 1984.
Should there be any questions, please call us at your convenience.
Very truly y m,
O. W.
D'xon r.
RBJ':OWD/dwf
Attachment:
cc:
V.
C.
Summer C.
L. Ligon (NSRC)
T. C..Nichols, Jr./O. W.
Dixon, Jr.
K..E.
Nodlan E.
H.-Crews, Jr.
R.
A.
Stough E.
C. Roberts G.
Percival W.!A. Williams, Jr.
C.
W. Hehl D. A. Nauman J.
B.
Knotts, Jr.
Group Managers I&E Washington O. S. Bradham-Document Mangement Branch C. JL. ' Price INPO Records Center
'D.
A.
Lavigne NPCF J.-F. Heilman File 8404050023 040330 i.
.gDRADOCK 05000395 OFFICIAL COPY PDR 7
\\
1 i
fi
,g+'
~
c
.f Mr. James P.1-O'Reilly-fSPRE84-001,. Supplement:No._l.
Page Two
~ March:30,.1984 T
~
- EVENT DESCRIPTION
~
fAs~a result of a modification'to the Chilled Water Pumps in which appropriate analytical 1 documentation had not been completed prior.
toLimplementation of the modification,tthe Licensee voluntarily p
entered?into Action Statement'(a) of Technical Specification 3~.7.10, " Fire RatedfAssemblies," by opening-the fire doors to the
_ Chilled Water Pump;Roomsfon. January _10, 1984.
Special Report (SPR)J 84-0011was submitted - February 9,1984,. documenting the Licensee's action and commitments.
l nalytical work involving the Chilled Water Pump environment has Abeen completed to; the extent where, lar review of the existing -
- equipment qualification, the Licensee issabletto demonstrate a
. qualified life of : eight- ( 8) years under design conditions.
On ethis' basis,othe interim mitigating action described-in SPR 84-001 hasLbeen terminated,'i.e., the. fire doors to the Chilled Water
~
- Pump, Rooms have-been closed, and the' fire watch discontinued.
Nuclear? Engineering.is continuing-to review this condition in order'to=resolvefthe questions of 40. year equipment qualification
'and substantial safety. hazard determination per 10 CFR 21.
To supplement;the1 analysis, in-plant testing will be conducted.
It l's expected that analysis and testing can be completed by May 30,
~*
~1984.
1 ACTION /TO BE TAKEN A supplementary _ report will be submitted addressing the 40 year qualification and-the substantial ~ safety. hazard determination issuestbyfJune 15,.1984.
1 4
t J
._.y'
.*