Concludes That DG Facility,Due to Const & Site Topography, Will Survive Blast from Twice Current Design Basis Explosive Device,Per Review of Matl Provided by FPC Personnel During 950801 Visit to Crystal Energy Complex
ML20087K553
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/15/1995
From: Nebuda D
ARMY, DEPT. OF, CORPS OF ENGINEERS
To: Young F
NRC
References
NUDOCS 9508230377
Download: ML20087K553 (1)


Text

N L

-A y

DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, OMAHA DISTRICT N

215 NORTH 17TH STREET 50' OMAHA, NEBRASKA 68102-4978 y

August 15, 1995 Special Projects Branch Mr. Francis (Skip) Young U.S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Mail Stop 09D24 Rockville, Maryland 20852

Dear Mr. Young:

I have completed a review of the material provided by Florida Power Corporation personnel during our site visit to the Crystal Energy Complex on August 1, 1995, related to their diesel generator facility.

My conclusion is that the diesel generator facility, due to construction and site topography, will survive a blast from twice the current design basis explosive device.

I am maintaining a file of the material provided by Florida Power Corporation.

If you have any questions regarding my review please contact me at (402) 221-4914.

Sincerely, 0

n Dale Nebuda, P.E.

Structural Engineer Copy Furnished:

Mr. C. A. Longhouser, Jr., Florida Power. Corporation, MAC NA2E,15760 W.

Power Line St., Crystal River, FL 34428-6708 f