Requests Withdrawal of GE NEDC-32215P, Giraffe Passive Heat Removal Testing Program Draft & Final Repts & Nonproprietary Version of Paul Scherrer Inst Rept Panda Steady-State Tests S1-S6..., in Response to NRC
ML20087K432
Person / Time
Site: 05200004
Issue date: 08/18/1995
From: Quinn J
GENERAL ELECTRIC CO.
To: Quay T
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
MFN-160-95, NUDOCS 9508230284
Download: ML20087K432 (2)


Text

g

)

_Y GENuclearEnergy

~

$165 San Jose, CA 95125-1014 LR B

75 u von 408 925-1005 (phone) 408 925-3991 (facsimile)

August 18,1995 MFN 160-95 Docket STN 52-004 Document Control Desk U. S. Nuclear Regulatory Commission Washington DC 20555 Attention: Theodore E. Quay, Director, Standardization Project Directorate

Subject:

SBWR - Withdrawal of General Electric (GE) NEDC-327,15P, " GIRAFFE Passive Heat Removal Testing Program" Draft and Final Reports, and Non-proprietary Version of the PSPs " PANDA Steady-State rests S1 Through S6 PCC Performance Apparent Test Results" Report

Reference:

1.

Letter from Dino C. Scaletti (NRC) to James E. Quinn (GE), REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE, GENERAL ELECTRIC (GE) NEDC-32215P, " GIRAFFE PASSIVE HEAT REMOVAL TESTING PROGRAM" DRAFT AND FINAL REPORTS, dated August 1,1995.

2.

Ietter from Son Q. Ninh (NRC) to James E. Quinn (GE), SIMPLIFIED BOILING WATER REACTOR (SBWR) - PANDA STEADY-STATE TESTS S1 THROUGH S6 PCC PERFORMANCE APPARENT TEST RESULTS, dated August 9,1995.

i In response to Reference 1, GE hereby formally requests the withdrawal of the subject documents and their associated affidavits from the July 1,1993 and October 19,1993 GE to NRC letters. Please return these documents to GE.

Reference 2 requests that GE submit a non-proprietary version of the Paul Scherrer Institut (PSI) Report " PANDA Steady-State Tests S1 Through S6 PCC Performance Apparent Test Results". GE will request a non-proprietary version from PSI, but obtaining this version will require more time than is allotted in Reference 2. Therefore, please allow an additional 90 days (to Dec. 9,1995) for GE to obtain and submit the non-proprietary version of the report, and continue to maintain the existing version as proprietary.

1/D I

O 9508230284 950818 i

PDR ADOCK 05200004 A

PDR J

. _,; ~..

GENuclearEnergy o

l MFN 160-95 If you have any questions, please contact John Imatherman, (408) 925-2023.

f Sincerely, Jay (E. Quinn, JFroject Manager l

cc:

P. A. Boehnert (NRC/ACRS) (2 paper copies plus E-Mail)

I. Catton (ACRS)

(1 paper copy plus E-Mail)

S. Q. Ninh (NRC)

(2 paper copies plus E-Mail)

J. II. Wilson (NRC)

(1 paper copy. plus E-Mail)

D. C. Scaletti (NRC)

(1 paper copy. plus E-Mail) j i

_i) tJ

_