Text
l s
+g,~ :s i 1
I I
l RA Tenressee Valley Adhority Post Office Box 2'100 SodicDatsy Tennessee 37379 April 28, 1995 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen In the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 SEQUOYAH NUCLEAR PLANT (SQN) - FIRE PROTECTION IMPROVEMENT PLAN PERIODIC STATUS REPORT A working meeting between TVA and NRC was held at SQN on August 19, 1991, to discuss the self-identified problems in SQN's Fire Protection Program and the improvement plan efforts initiated by TVA.
As a result of this meeting, TVA agreed to submit periodic status reports to inform NRC on the progress of efforts made in conjunction with the improvement plan.
The most recent status report identifying progress achieved and areas needing further action is included in the enclosure.
The SQN commitment date to complete the four phases of the Fire Protection Improvement Plan is December 1, 1995.
If you have any questions concerning this submittal, please telephone Steve D.
Gilley at (615) 843-7427.
Sincerely, 4Nh R.
H.
Shell Manager SQN Site Licensing Enclosure cc:
See page 2 4
1 9505050093 950428 PDR ADOCK 05000327 l)i F
PDft T
1
g-
[}
w
."S pires e a
E t
'l 1
r
- l 7
U.S.. Nuclear Regulatory Commission l
Page 2 April 28, 1995 I
cc (Enclosure):
Mr. D. E. LaBarge,-Project Manager i
'U.S. Nuclear Regulatory Commission
'l One White Flint, North
- j 11555 Rockville' Pike i
Rockville, Maryland 20852-2739 j
1 NRC Resident Inspector L
Sequoyah Nuclear Plant l
2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator
- j U.S. Nuclear Regulatory Commission j
i ^
Region II 101 Mari'etta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711
+
I
.1 i
i a
h 1
J
.i i
'I 4
a
m-
- 9.. =, ; w ~{
r ENCLOSURE q-FIRE PROTECTION IMPROVEMENT PLAN - STATUS FOR PERIOD ENDING MAY 1, 1995 Phase I - Phase I is Comolete Phase II - Phase II is comolete Phase III - Phase III is comolete Phase IV - Tarceted comoletion Date December 1, 1995 4-1 Perform an independent fire protection assessment to ensure that the actions taken in Phase III are properly Lmplemented and effective. This item is complete.
4-2 Complete an evaluation of the mechanical and electrical fire barrier penetration seals in accordance with the guidelines in Information Notice No. 88-04.
This item was rescheduled and completed during Phase III as Item 3-8.
4 Issue the remaining updated design documentation to support the final compilation into the SQN Fire Prot 6ction Report and establish a process to maintain the documentation current.'
Status: Work required for the submittal of the Fire Protection Report is approximately 10 percent complete. The Fire Protection Report is expected to be submitted by December 1995.
4-4 Issue a design package for Project Control No. (PCN) 607.
Status: The design for this item is approximately 80 percent complete, and vendors have been selected for the major components.
It is anticipated that the final design for this project will be complete by June 30, 1995.
4-5 Perform a life-cycle analysis on high-pressure fire protection components and provide replacement recom-Sndations.
Status: This item will be accomplished in conjunction with the upgrade to the fire protection system within the scope of PCN 607.
This item should be considered an integral part of Item 4-4.