.i Ent:rgy Cper-tion,Inc.
' = ENTERGY eo oox 7sc Ptet Gt,sca MS 39150 Tel 601437 2600 C. R. Hutchinson vce Presaw August 11, 1995 SL"U uw swm U.S. Nuclear Regulatory Commission Mail Station P1-37 Washington, D.C.
20555 Attention:
Document Control Desk
Subject:
Grand Gulf Nuclear Station Docket No. 50-416 License No. NPF-29 Fitness For Duty (FFD) Six-Month Report GNRO-95/00095 Gentlemen:
Attached is the Grand Gulf Nuclear Station (GGNS) Fitness for Duty Program performance Six-Month Report.
This report is being submitted in accordance with 10CFR Part 26 for the reporting period January 1, 1995 through June 30, 1995.
The information contained in the attached is based on statistical data and trend analysis compiled by means of the GGNS Fitness q
for Duty Program.
Should you require additional information, please contact Mr. H.
F. Cooper at (601) 368-5820.
Yours truly,
/
r H/ SJ/mtc attachment:
GGNS Fitness For Duty Six-Month Report cc:
(See Next Page) n<
J U C l. u U 9508150177 950811
%1f I l
G9508081 1
PDR ADOCK 05000416
$Ua 1i F
PDR j
1
x 7
av 1
duust11,1995 G
O-95/ 00095 LPage 2 of_3 l
l cc:
Mr. J. E. Tedrow (w/o)
Mr.
H..W. Keiser (w/o).
l Mr. R. B. McGehee (w/o) j Mr. N. S. Reynolds (w/o)
Mr.1H. L. Thomas (w/o)
Mr. Stewart D. Ebneter.(w/a) r Regional Administrator l
U.S. Nuclear Regulatory Commission
.i Region II Ge rg k' b bb At a a
Mr.
P. W. O'Connor, Project Manager (w/2)
Office of Nuclear Reactor Regulation
.U.S.
Nuclear Regulatory Commission Mail Stop 13H3
~
. Washington, D.C.
20555 t
i f
i
.^
G9508081 j
1
+
-e 7
l l
i 1
FITNESS FOR DUTY SIX-MONTH REPORT 1
JANUARY 1, 1995 THROUGH JUNE 30, 1995 l
(RF07 began on April 15, 1995 through June 20, 1995)
Manacement Actio.n:
None Fitness for Duty Initiatives Taken:
A new computer software program "Heidi" was implemented in February of 1995.
This new database has to be updated to correct problems on day to day use.
Overall it meets our requirements.
The annual Fitness for Duty audit was conducted from June 5, 1995 through June 30, 1995.
Yne overall audit results indicated that the Fitness for Duty department met all applicable requirements and is being effectively implemented.
Random testing rate during this period was 24.9%.
Our random drug testing is now 50% yearly.
Effectiveness Evaluation:
The Fitness for Duty section continues to update and revise Fitness for Duty procedures and instructions for any changes, audits, and new information obtained to improve our daily drug free operation; therefore, maintaining NRC regulations and guidelines to our fullest capacity.
Sionifisant Events:
During RF07 in April one For Cause test resulted positive for alcohol.
HRC Reportable Events Pursuant to 10CFR26.73:
During April empty alcoholic containers were found in the protected area.
The incident was investigated with the finding that the containers were not in the possession of anyone at the time of discovery.
G9508081
\\
y, I -
Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 i -
1 --
2 ENTERGY OPERATIONS.INC.
N/A' Company 6 Months Ending 3
L:
I GRAND GULF NUCLEAR STATION Location 4
5 DONNA WILLIAMS (601) 437-2481 Contact Name Phone (include area code) 5-A Random Testing Rate 50%
6 Cutoffs: Screen / Confirmation (ng/ml)
[
].
Appendix A to 10CFR 26 Marijuana 50!!5 Amphetamine 1000/500 N/A Cocaine 300/150 Phencyclidine 25/25 N/A
/
Opiates 300/300 Alcohol (%BAC) 0.04 N/A
/
l Testing Results Licensee Employees long-Term Contractor Short-Term Contractor Personnel Personnel
- 7. Average Number with
- 1619 N/A unescorted Access
'I'E
'I
Tested Pos tive Te ted Pos tive Tested Pos tive Pre-Access 66 0
0 0
1606 30 s#
' FOR CAUSE*--P
~, [P5 (kNidesit]; ",
0 0
0 0
0 0
, [dlibMd $lehah}$r) 2 0
0 0
0 1
e Random 205 0
13 0
66 0
Follow-up 8
0 0
0 0
0 Other 1
0 0
0 0
0 Total 282.
0 13 0
1672 31 FFD-44
- His number includes Entergy employees short and long term contractors with unescorted acess I
05/20/94 a
.q
.~
~'
~
1
. BREAKDOWN OF CONFIRMED POSITIVE TESTS FOR SPECIFIC SUBSTANCES Marijuana Cocaine Opiates Phencyclidine Amphetamines Alcohol Refusal to Test 1
2 3
4 5-50-100 100-up Licensee Employees 0
0 0
0 0
0 0
0 N/A N/A N/A N/A N/A teng-Term Contractors 0
0 0
0 0
0 0
.0 N/A N/A N/A N/A N/A Sho1-Term Contractors 21 0
6 0
0 0
4
.O N/A N/A N/A N/A N/A A
Total 21 0
6 0
0 0
4 0
N/A N/A N/A N/A N/A 31 FFD-45 05/20/94 i
l l