Text
.-
y___.
Germed R. Rainey Vica Pr*sident
. Pesch Bottom Atomic Power Station s
l OEN RGY reco e e,av co-a v RD 1, Box 208 Delta, PA 17314-9739 717 456 7014 1
August 7,1995 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278
.l Gentlemen:
Enclosed are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of July 1995 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.
Sincerely,
./
/.
(
eral c Rainey Vice President, Peach Bottom Atomic Power Station GR
/T
/J H:wjj enclosures cc:
RA Burricelli, Public Service Electric & Gas W.P. Dornsife, Commonwealth of Pennsylvania R.I. McLean, State of Maryland T.T. Martin, Administrator, Region I, USNRC W.L. Schmidt, USNRC, Senior Resident inspector H.C. Schwemm, Atlantic Electric A.F. Kirby, Ill, Delmarva Power & Light INPO Records Center l
f 2 U ' I ' *,
ccn 95-14070 t/o 9508150144 950731-PDR ADDCK 05000277 i
R PDR
I i
bcci-J. A.,Bemstein -
63C-7 -Chesterbrook
J. Lewis SMB3-7 aeach Bottom
- ' Commitment Coordinator 62A Chesterbrook Correspondence Control Program 618 Chesterbrook j
D. B. Fetters -
638 Chesterbrook E. J. Cullen S23 Main Office -
G. D. Edwards A41S - Peach Bottom
^
A. A. Fulvio SMB4-5 -Peach Bottom G. A. Hunger-62A Chesterbrook M. C. Kray 52A Chesterbrook P
Krippner ANI S.
Maingi PA DER.
C. J. McDermott S13 Main Office G. R. Rainey SMB 4-9-Peach Bottom T. N. Mitchell SMB 3-2-Peach Bottom M. J. Kelly SMB 4-5-Peach Bottom W. H. Smith,Ill 62C Chesterbrook R. A. Kankus 62C Chesterbrook D. M. Smith 63C Chesterbrook A. J. Wasong A4-1S - Peach Bottom File A2 i
i l
~
PEACH 10TTOM ATOMIC POWER STATION NRC MONTHLY OPERATIONS
SUMMARY
JULY 1995 UNIT 2 Unit 2 began the month of July at 100% nominal power and operated at that power level for the remainder of the month.
UNIT 3 Unit 3 began the month of July in the end of fuel cycle coastdown mode at approximately 78%
. power. On July 30th the unit was shutdown by an automatic reactor scram caused by an unplanned feedwater transient.
I
i i
Attachment to w
Monthly Operating Report for July 1995 t
UNIT 2 REFUELING INFORMATION i
1.
Name of facility:
Peach Bottom Unit 2 2.
Scheduled date for next refueling shutdown:
Reload 11 scheduled for September 20,1996.
t-3.
Scheduled date for restart following refueling:
Restart following refueling forecast for November 2,1996.
4.
Will refueling or resumption of operation therefore require a technical specification change or other license amendment?
N/A If answer is yes, what, in general, will these be?
i 5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
N/A 6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
N/A 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) Core - 764 Fuel Assemblies (b) Fuel Pool - 2436 Fuel Assemblies,59 Fuel Rods
Docic3 No. 50-277 Attachment to Monthly Operating Report for July 1995 j
Page 2 UNIT 2 REFUEUNG INFORMATION (Continued)
' 8.
The present licensed spent fuel poo: storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
f 9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:
September 2004 without full core offload capability.
September 1998 with full core offload capability.
E I
F L
1
Docket No. 50-278 Attachment to Monthly Operating Report for July 1995 UNIT 3 REFUELING INFORMATION 1.
Name of facility:
Peach Bottom Unit 3 2.
Scheduled date for next refueling shutdown:
Reload 10 scheduled for September 16,1995 3.
Scheduled date for restart following refueling Restart following refueling scheduled for October 20,1995 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Yes if answer is yes, what, in general, will these be?
03 12 Power Uprate 93-18 SRM/lRM improvements 5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
93-12 Submitted 6/23/93 93-18 Submitted 1/17/95 6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes In fuel design, new operating procedures:
N/A 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) Core - 764 Fuel Assemblies (b) Fuel Pool - 2201 Fuel Assemblies,6 Fuel Rods
Dock 3 N2. 50-278 Attachment to Monthly Operating Report for July 1995 Page 2 UNIT 3 REFUELING INFORMATION (Continued) 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:
September 2003 without full core offload capability.
September 1999 with full core offload capability.
4 i
l
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 277 UNIT PEACM BOTTOM UNIT 2 DATE AUGUST 4,1995 COMPANY PECO ENERGY COMPANY W. J. JEFFREY PERFDRMANCE AND RELIABILITY SITE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 4027 MONTH JULY 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 1104 17 1092 2
1102 18 1091 3
1104 19 1088 4
1112 20 1088 5
1103 21 1092 6
1112 22 1088 7
1104 23 1088 8
1104 24 1087 9
1112 25 1083 10 1095 26 1087 11 1108 27 1083 12 1D95 28 1D91 13 1095 29 1083 14 1D99 30 1D98 15 1098 31 1D61 16 1092 r
l L
~-.
4 a
e k
AVERAGE DAILY UNIT POWER' LEVEL l
DOCKET No. 50 - 278 UNIT PEACH BOTTOM UNIT 3..
DATE AUGUST 4,1995 COMPANY PECO ENERGY COMPANY W. J. JEFFREY PERFORMANCE AND RELIABILITY
$1TE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456 7014 EXT. 4027 MONTH JULY 1995 i
b DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE NET)
(MWE-NET) 1 765 17 700 2
763 18 691 3
756 19 692 4
760 20 663
{
5 752 21 632
.[
6 752
'22 678 7
744 23 674 I
8 740 24 669 9
743 25 665
..i to 724 26
-665
{
11 733 27.
656 12 724 28 660-13 720 29 652 14 716 30 164 15 711 31 0
16 705
=
m
=
ym,
q 9
i J
OPERATING DATA REPORT 4
DOCKET No. 50 - 277 DATE AUGUST 4,1995 COMPLETED BY PECO ENERGY COMPANY e
W. J. JEFFREY i
PERFORMANCE AND RELIABILITY SITE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 4027 OPERATING STATUS l
- 1. UNIT NAME: PEACH BOTTOM UNIT 2 NOTES:
- 2. REPORTING PERIDO:
JULY, 1995
- 3. LICENSED THERMAL POWER (MWT):
3458
- i
- 4. NAMEPLATE RATING (GROSS MWE):
1221
- 5. DESIGN ELECTRICAL RATING (NET MWE):
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1159
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
1D93 j
- 8. IF CHANGES DCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
THE NEW RERATED VALUE FOR ITEM #5 HAS NOT YET BEEN DETERMINED.
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
~
- 10. REASONS FOR RESTRICTIONS, IF ANY:
THIS MONTH YR*TO-DATE CUMULATIVE I
- 11. HOURS IN REPORTING PERIOD T44 5,087 184,727
- 12. NUMBER OF HOURS REACTOR WAS CRIT!tAL 744.0 5,087.0 119,050.1
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR DN LINE 744.0 5,087.0 115,G;0.2 i
r
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,571,545 17,393,803 345,714,686
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 844,500 5,775,600 113,654,990
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 814,431 5,605,967 109,048,423 PAGE 1 0F 2 4
i
i l
,m l
OPERATING DATA REPORT (CONTINUED)
DOCKET NO. 50 - 277 I
DATE AUGUST 4,1995 t
THIS MONTH YR-TO-DATE CUMULA?!VE i
- 19. UNIT SERVICE FACTOR 100.0 1D0.0 62.3
- 20. UNIT AVAILABILITY FACTOR 100.0 1D0.0 62.3
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 100.2 100.8 56.0
- 22. UNIT CAPACITY FACTOR (USING DER NET)
DER RATING TBD
_j
- 23. UNIT FORCED OUTAGE RATE 0.0
.........'0.0-12.6 j
- 24. SHUTDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)
?
t i
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE Of STARTUP: N/A l
r i
r
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERAT!0N):
FORECAST ACHIEVED INITIAL CRITICALITT 09/16/73 INITIAL ELECTRICITY 02/18/74~
COMMERCIAL OPERATION 07/05/74 h
i e
r 1
l PAGE 2 0F 2 I
I i
j l
1 4
~
I t
l i
OPERATING DATA REPORT-f DOCKET NO. 50 - 278 DATE AUGUST 4,1995 COMPLETED BY PECO ENERGY COMPANY W. J. JEFFREY PERFORMANCE AND RELIABILITY SITE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 4027 OPERATING STATUS
- 1. UNIT NAME: PEACH BOTTOM UNIT 3 NOTES:
- 2. REPORTING PERIOD:
JULY, 1995 a
- 3. LICENSED THERMAL POWER (MWT):
3293
- 4. NAMEPLATE RATING (GROSS MWE):
1152
- 5. DESIGN ELECTRICAL RATING (NET MWE):
1065
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1D98
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 1035 t
- 8. IF CHANGES DCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
+
- 9. POWER LEVEL TO WV.. RESTRICTED, IF ANY (NET MWE):
- 10. REASONS FOR RES1NICTIONS, IF ANY:
[
l
?
THIS MONTH YR-TO-DATE CUMULATIVE f
t
- 11. HOURS IN REPORTING PERIOD 744 5,087 180,623 i
- 12. NUMBER OF HOU9S REACTOR WAS CRITICAL 703.0 4,976.5 118,235.9 l
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GT.NERATOR DN LINE 703.0 4,962.0 114,841.2
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 7
I
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,690,294 14,955,879 341,529,822
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 526,900 4,846,300
'111,992,332
_i
- 18. NET ELECTRICAL ENERGY GENERATED (MWM) 497,410 4,655,263 107,496,622 l
PAGE 10F 2 i
i
?
t f
J l
.I OPERATING DATA REPORT (CONTINUED)
DOCKET No. 50 - 278 i
DATE AUGUST 4,1995 t
THIS MONTH YR TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 94.5 97.5 63.6
- 20. UNIT AVAILABILITY FACTOR 94.5 97.5 63.6 l
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 64.6 88.4 57.5'
- 22. UNIT CAPACITY FACTOR (USING DER NET) 62.8 85.9 55.9
- 23. UNIT FORCED OUTAGE RATE 5.5 2.5 11.2
- 24. SNUTDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 10/20/95
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED i
INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY-D9/01/74 COMMERCIAL OPERATION 12/23/74 b
i b
h I
l l
i
?
PAGE 2 0F 2 1
l t
l t
i I
L l
I 1
)
i l
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET No. 50 277 UNIT NAME PEACH BOTTOM UNIT 2 I
DATE AUGUST 4,1995 REPORT MONTH JULY, 1995 COMPLETED BY PECO ENERGY COMPANY W. J. JEFFREY f
PERFORMANCE AND RELIABILITY
$1TE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 4027 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO 4
NO.
DATE (1) ' (HOURS)
(2)
REACTOR (3)
REPORT #
(4)
(5)
PREVENT RECURRENCE I
10 950713 F
6.0 N
4 3C VALVEX CIV CLOSURE. REACTOR NOT SHUTDOWN E
t r
6.0 i
i (1)
(2)
(3)
(4).
F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS
$ - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
FILE (NUREG-0161)
?
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H -. OTHER(EXPLAIN)
EXHIBIT I - SAME SOURCE i
f i
4 1
l
h f
e
+
,i i
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET No. 50 - 278 UNIT NAME PEACH BOTTOM UNIT 3 DATE AUGUST 4,1995
- REPORT MONTH JULY, 1995 COMPLETED BY PECO ENERGY COMPANY W. J. JEFFREY PERFORMANCE AND RELIABILITY SITE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456 7014 EXT. 4027 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.
DATE (1)
(HOURS)
(2)
REACTOR (3)
REPORT #
(4)
(5)
PREVENT RECURRENCE 10 950701 S
703.0 M
4 RC FUELXX FUEL COASTDOWN. REACTOR NOT SHUTDOWN
'11 950730 F
41.0 A
3 HC VALVEX FEEDWATER TRANSIENT. HIGH REACTOR LEVEL SCRAM i
744.0 (1)
(2)
.(3)
(4)
F - FORCED REASON METHOD EXHIBli G - INSTRUCTIONS 6
S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 + MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 AUTOMATIC SCRAM.
EVENT REPORT (LER) s D REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN)
EXXIBli ! - SAME SOURCE a
--