OPER&TI;G DATA REPIRT DOCKET so. 50 - 277 D&TE FEBRU&BT 15, 1984
=.--
COBPLETED ST PHIL&DELP911 ELECTRIC C05 PANT -
.=____=
5.R.&LDE5 E N GIE EE R-IN -CR& R GE LICEBSIBG SECTION GENERATION DITISION-80 CLEAR TELEPHOut (215) 841-5022 OPER ATING ST&TUS
......==
- 1. OEIT BASE: PEACE BOTT05 051T 2 i BOTES: UNIT 2 EXPERIENCED ONE FORCED l l
g
- 2. REPORTING PERIOD:
J450&RY, 1984 1
OUTAGE DUE TO & LE1K IB THE I
l 1
- 3. LICENSED THERBAL POWER (BRT) :
3293 i
BCIC TESTABLE CHECK T ALTE, I
1 l
4 51!EPL&TE RATING (GROSS BEE) :
1152 i
SEDTD0su 315 EXTENDED DDE TO I g
g
- 5. EESIGN ELECTRICAL 31T153 (EET BEE):
1065 i
EICESSITE LEAKAGE THROUGB l
l g
- 6. RAIIBUS DEPENDABLE C APACITY (GROSS EWE): 1098 1
DRTWELL AIRLOCK DURING START. I I
i
- 7. s&IISUS FTPENDABLE C&PACITY (EET SWE) :
1051 l
DP PRES 5URIZATION TEST.
I
- 8. IF CH&BGES OCCUR IN CAPACITT RATINGS (ITEns sun 8ER 3 THROUGH 7) SIECE 1157 REPORT, GITE REAS055
- 9. POWER LITEL TO SEICE RESTRICTED, IF 137 (NET BEE):
- 10. RF130NS FOR RESTRICTICES, IF ABI:
TBIS BONTH T R-To-D AT E CDsOL& TITE
- 11. ROURS IB REPORTIEG PERIOD 744 744 83,952
- 12. 3U5322 0F 503a5 RE&CTCR sts CRITICAL 692.8 692.8 60,391.7
- 13. REACTOR RESERTE $RUTDOWN B0085 0,0 0.0 0.0
- 14. BOURS GEEERATOR 05-LINE 669.3 669.3 58,68 $
- 15. UNIT RESERTE SSUTDOBB HOURS 0.0 0.0 0.0
- 16. GROSS TBERS&L EEERGY GENERATED (M B R) 2,144,482 2,144,482 17,*s699,092
- 17. GROSS ELECTRICAL EsERGY GEsER&TED (asE) 716,340 716,340 56,887,430
- 18. NET ELECTRICAL ENERGY GENERATED (HERI 695,327 695,327 56,531,757
- 19. UNIT SERTICE FACTOR 90.0 90.0 69.9
- 20. UNIT AV AILABILITT FACT 01 90.0 90.0 69.9
- 21. UNIT C&*1 CITY FACTOR (USI5G BDC BET) 88.9 88.9 61.8
- 22. UNIT C&PACITT FACTOR (USING DER BET) 87.8 87.8 61.0
=
- 23. UFIT FORCED OUT&GE RATE 10.0 10.0 12.8 24 SF3T30W55 SCREDULED OVER NEIT 6 803753 (TTFE, DATE, ABD DURATION OF EACR):
- 1. SHUTDOWN FOR CONTAISMEET ISOLATION T<ES LOC &L LEAR R ATE TE* TING BEGINIING 2/17/84 ABD L&STIEG UNTIL 2/29/64.
- 2. SHUTDOWN FOR REFUELIBG AED PIPE REPLACEMENT FOR RETIE *DLA-TIos AND RESIDUAL BEPT REMOT&L (RHR) 5157E83 REGINNING 5/01/84 &ND LASTIEG APPRDIIB&TELY 32-36 UEEKS.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIB&TED D&TE OF STattuP: 2/02/84
- 26. CBITS IN TEST ST&TES (PRIOR TO CORBERCIAL OPER&TIOE):
FOREC&ST ACRIETED IBITIAL CRITIC &LITT
==
151*Ji&L ELECTRICITY CORREBCIAL OPERATION 8402170143 840131 PDR ADOCK 05000277 R
PENT L
1
_ m.
OPERATIE3 DATA REF RT DOCKET NO. 50 - 278
- L-DATE FERRCARY 15, 1984 C05PLETED ET PHIL&DELPHI& ELECTRIC CDEP&KY B.B. A LD EN 1
. E N GIBEER-IN -CB &R GB-LICENSING SECTION GENER ATION DITISICB-50 CLEAR TELEPHONE (215) 841-5022 OPER&TIEG STATUS
3
- 2. REPORTIBG PERIOD JANUART, 1984 1
00TAGE DUE TO FLOODING IN TRt l g
g
- 3. LICENSED THERRAL POWER (PET) :
3293 CC 9EES&TE PURP 3005, REQUIR-l g
g 4 345EPLATE R&TIBG (GROSS RWE) :
1152 l
ING SEUTD0NN &BD REP &IR OF l
g 3
- 5. DESIGs ELECTRICAL R&TIuG (NET asE):
1065 l
CONDEBS&TE FORPS.
l g
- 6. BAEIBUR DEPEED&BLE CAPACITI (GRJS3 PfE): 1098 l
l g
l
1035 l
l E. IF CHLEGES OCCUR II C&P&CITT RATINGS (ITEMS BusBER 3 THROUGH 7) SINCE L&ST REPORT, GITE REASONS
- 9. POWER LETEL TO WHICS RESTRICTED, IF Aff (WET BEE):
- 10. REASONS FOR RESTRICTICES, IF ABY:
THIS B0575 TR-TO-DATE CUEULATIVE
- 11. ECURS 25 REPORTIEG PERIOD 744 744 19,848
- 12. BUMBER OF BOURS REACTOR 513 TRITICAL 459.9 459.9 57,259.7
- 13. RE4; TOR RESERTE S5UTDOBE EDURS 0.0 0.0 0.0 14 ROURS GEBE&& TOR OB-LINE 444.1 444.1 55,760.3
- 15. UNIT RESERTE SHUIDCV E BOURS 0.0 0.0 0.0
- 16. GROSS THERS&L EEERGT GENER&TED (R B M) 1,390,336 1,380,336 162,418,641
- 17. GROSS ELECTRICAL ENERGY GESERATED (suh) 454,270 454,270 53,269,390
- 16. NET ELECTRICAL ENERGT GENERATED (Eva) 440,256 440,296 51,104,081
- 19. UNIT SERTICE FACTOR 59.7 59.7 69.8
- 20. UNIT AT&ILASILITY FACTOR 59.7 59.7 69.8
- 21. UNIT CAPACITY FACTOR (USING ELC EET) 57.2 57.2 61.8
- 22. UNIT C4P&OITY FACTOR [USIEG DER RET) 55.6 55.6 60.1
- 23. UNIT FORCED OUTAGE RATE 40.3 40.3 7.7
- 24. SHUTDOWNS SCHEDULED OTER BEIT 6 MONTHS (TTPE, ATE, ABD DURATIO5 OF EAOR):
- 25. IF SHUTDOWN AT EED OF REPORT PERIOD, ESTIR&TED DATE OF STARTUP
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL 0P2517105):
FORECAST ACHIETED IRITIAL CRITICALITT IIITIAL ELECTRICITT CORRE101&L OPER& Tion s h-r
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 277 UNIT PEACH BOTTOM UNIT 2 DATE FEBRUARY 15, 1984 COMPANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN j
ENGINEER-IN-CHARGE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH JANUARY 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 959 17 1043 2
1064 18 1039 3
1076 19 1038 4
1075 20 1037 5
1076 21 1033 6
1074 22 1028 7
1075 23 1003 8
1075 24 1026 9
1074 25 1020 10 1069 26 1012 11 1065 27 1017 12 1063 28 746 13 1059~
29 0
14 1G53 30 0
15 1050 31 0
16 1046
-~
AVERAGE DAILY UNIT POWER LEVEL
+
DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 DATE FEBRUARY 15, 1984 COMPANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE s
LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH JANUARY 1984 LAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (M W E-N ET)
(MWL-NET) 1 1078 17 0
2 1077 18 0
3 1078 19 0
4 1079 20 0
S 1080 21 0
6 1079 22 0
7 1079 23 0
8 1081 24 0
9 1079 25 0
10 1076 26 0
11 1077 27 195 12 1080 28 638 13 1069 29 794 14 709 30 999 15 0
31 1064 16 0
UNIT SHUTDOPNS AND POWER REDUCTIONS DOCKET NO. 50 - 277 UNIT' WAME PEACH BOTTOM UNIT 2 DATE FEBRUARY 15, 1984 REPORT MONTH JANUARY, 1984 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY b.M.ALDEN ENGINEEN-IN-CHARGE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHON E (215) 841-5022
---.__.-_==
...=
=--
l l-l l
l METHOD OF l LICENSEE l SYSTEM l COMPONENT l CAUSE AND CORRECTIVE l
l TYPE l DURATION l REASON l SHUTTING DOWNl EVENT l CODE l CODE l ACTION TO NO.l DATE l (1) l (HOURS)l (2) l REACTOR (3) l REPORT 8 l (4) l (5) l PRETENT RECURRENCE l
l l
I l
l l
l l
1l 840128 l Fl 074.7 'l A l 2
l WA l SA l VESSEL l LEAK IN RCIC TESTABL' CHECK TALTE.
l
.l l
l l
l l
l l SHUTDONN NAS EITENDED DUE TO EI-l l
l l
l l
l l
l CESSITE LEAKAGE THROUGH DRYNELL l
l l
l l
l l
l l AIBLOCK DURING STARTUP PRESSURIZA-l l
l l
l l
l l
l TION TEST.
I l
l ----- l l
l l
1 l
1 l
l 7N 7 l l
l l
l l
l l
l l
(2)
(3)
(4)
(1) i F - FORCED REASON METHOD EINIBIT G - INSTRUCTIONS l
'S - SCHEDULED A - EQUIPMENT FAILURE (EIPLAIN) 1 - MANUAL FOR PREPARATION OF DATA y
B - MAINTENANCE OR TEST 2 - MANUAL SCRAN.
ENTRY SHEETS FOR LICENSEE l
C - REFUELING 3 - AUTOM4 TIC SCRAM.
EVENT REPORT (LER) l D - REGULATORY RESTRICTION 4 - OTHER (EIPLAIN)
FILE (N U R EG-0161) y E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G.0PERATIONAL ERROR (EIPLAIN)
D H - OTHER (EIPLAIN)
EIMIBIT I - SAME SOURCE w
0 n
(
UNIT SHUTDONNS AND POWER REDUCTIONS DOCKET NO. 50 - 278 UNIT NAME PEACH DOTTOM UNIT 3 DATR FEBRUA4I 15, 1984 REPORT MONTH JANUARY, 1984 COMPLETED BY PHILADELPHIA ELECTRIC
....................... COMPANY N.M.LLDEN ENGINTER-IN-CHARGE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 I
I 1
I I METHOD OF l LICENSEE I
ITYPEIDURATIONtREASONISHUTTING DONNI (SYSTEMICOMPONENTI CAUSE AND CORRECTI#E NO.I DATE
.__- =-
I (1) l (HOURS) I (1) I REACTOR (3) l REPORT e I (4) l (5) l PREVENT RECURRENCE EVENT l CODE I CODE I ACTION TO I
I I
I I
I I
I i
1 1 840114 i F l 299.9 I A I 2
I WA I HH I PUMPII I l
I i
j i
l i
i i
I I
I ----- 1 I
i i
I i
CONDENSATE PUMP ROOM FLOODED, 3EQUIBING I
[
t 299.9 l
l l
1 I
I SHUTDONN AND REPAIR OF CONDENSATE PUMPS.
(1)
(2)
(3)
- FORCED REASON (4)
- SCHEDULED A - EQUIPMENT FAILURE METHOD (EIPLAIN)
B - MAINTENANCE OR TEST 1 - MANUAL EIHIBI" G - INSTRUCFIONS C - REFUELING 2 - MANUAL SCRAM.
FOR PREPARATION OF DATA D - REGULATORY RESTRICTION 3 - AUTOMATIC SCRAM.
ENTRY SHEETS FOR LICENSEE E - OPERATOR TRAINING +
4 - OTHER (EIPLAIN)
FILE (NUREG-0161)
EVENT REPORT (LER)
F - ADMINISTR ATIFE LICENSE EIAMINATION G - OPERATIONAL ERROR (EIPLAIN)
H - OTHER (EIPLAIN)
(5)
EIHlBIT I - SAME SOURCE, s
Dockst No. 50-277 Attcchm:nt to Monthly Oparcting Report f' r J anuary,.19 84 -
o REFUELING INFORMATION 1.
Name of facility:
Peach Bottom Unit 2 2.
Scheduled date for next refueling shutdown:
May 1, 1984 3.
Scheduled date for restart following refueling:
December 12, 1984 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Yes If answer is yes, what, in general, will these bei Technical Specifications to accommodate reload fuel.
Modifications to reactor core operating limits.
Technical specification changes associated with snubter reduction program.
5.
Scheduled date (s) for submitting proposed licensing action and supporting information:
September 12, 1984 for reload fuel 6.
Important lic,ensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
None expected.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a)
Core - 764 Fuel Assemblies (b)
Fuel Pool - 1170 Fuel ?.esemblies, 58 Fuel Rods 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has Paen requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 2816 fuel assenblies.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.
September, 1990 (March,1986, with reserve full core discharge)
Docket No. 50-278 Attachment to Monthly Operating Report for January,1984 REFUELING INFORMATION 1.
Name of f acility:
Peach Bottom Unit 3 2.
Scheduled date for next refueling shutdown:
March 30, 1985.
3.
Scheduled date for restart following refueling:
September 21, 1985..
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Yes.
If answer is yes, what, in general, will these be?
Technical Specifications to accommodate reload fuel.
Modifications to reactor core operating limits.
Technical specification changes associated with snubber reductic program.
5.
Scheduled date (s) for submitting proposed licensing action and supporting information:
June 21,1985 for reload fuel 6.
Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, now operating procedures:
None expected.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a)
Core - 764 Fuel Assemblies (b)
Fuel Pool - 1212 Fuel Assemblies, 6 Fuel Rods 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licenseu storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 1816 fuel assemblies.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.
September,-1991 (March,1987, with reserve for full core discharge)
Dockst Nos. 50-277
~
50-278
?
Attachment to Monthly Operating Report for January, 1984 PEACH BOTTOM ATOMIC POWER STATION NARRATIVE
SUMMARY
OF OPERATING EXPERIENCES January, 1984 l
Unit 2 The unit operated at full power from January 1 thru January 23..
On Canuary 23, the main stack radiation monitoring system was unable to obtain sample flow due to frozen sample lines.
An unusual event was declared and a controlled shutdown was initiated.
The unit was at-884 power, that same day, when the unusual event was terminated and the sample flow line was re-established.
The unit was restored to full power and continued to operate at full power until January 28.
On January 28, a controlled shutdown was initiated to repair a leak on the RCIC testable check valve.
The unit remained shutdown for-the rest of the month.
On January 11, the E-3 diesel generator was declared inoperable due to a ground caused by a damaged. conduit containing an output cable for the generator.
On January 13, the. diesel generator-was returned to service with a temporary modification allowing the diesel generator to operate without.this damaged cable.
UNIT 3 i
The unit began the operating period at full power.
On January 6, i
the HPCI turbine exhaust inner rupture disc failed during a j
surveillance test.
The HPCI was taken out of service and repairs j
completed the same day.
]
On January 14, the unit-was removed from service due to flooding i
of the condensate pump pit which was caused by an open' vent valve on a main condenser water box.
The flooding of the condensate pump room resulted in damage to the condensate pump thrust i
bearings.
Daring th3 manual scram on January 14, control rod-j (34-27) failed to insert within the prescribed time due to sticking of a scram pilot solenoid valve.
This. failure has led
}
to an extensive investigation for possible causes and generic implications.
The Nuclear Review Board' examined'the results of 2
the corrective actions taken and the protective = actions to be.
l implemented and approved startup of the unit.
The unit was
~
)
returned to power on' January 27.-
Full power was' attained'at 7:22 L
- p.m. on January 30, and operated at. full power for the remainder j
of the month.
a A
c-
,,.,_M,y,,,,.g.
_.,.,m,,,m e.
,%,,,,,m
___f.,_,,,,,.,,,%gwm,r.,y,,._mm,,,.,
,..,,.y.m,-r,...
PHILADELPHIA ELECTRIC COMPANY 2301 MARKET GTREET P.O. BOX 8699 PHILADELPHIA. PA.19101 E2:51 e41-4ooo February 10, 1984 Docket Nos. 50-277 50-278 Director Office of Inspection & Enforcement US Nuclear Regulatory Commission Washington, DC 20555 Attention:
Document Control Desk
SUBJECT:
Peach Bottom Atomic Power Station Monthly Operating Report Gentlemen:
Attached are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of January, 1984 forwarded pursuant to Technical Specification 6.9.1.C under the guidance of Regulatory Guide 10.1, Revision 4.
Very truly yours, N ?W W. T. Ullrich Superintendent tha: lear Generation Division Attachment cc:
Dr. T. E. Murley, NRC Mr. A. R. Blough, NRC Site Inspector Mr. Stan P. Mangi, Dept. of Envir. Resources Mr. P. A. Ross, NRC INPO Records Center 4