ML20086L637
| ML20086L637 | |
| Person / Time | |
|---|---|
| Site: | 05200004 |
| Issue date: | 07/20/1995 |
| From: | Quinn J GENERAL ELECTRIC CO. |
| To: | Quay T NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation |
| References | |
| MJN-099-95, MJN-99-95, NUDOCS 9507210280 | |
| Download: ML20086L637 (1) | |
Text
.
k T
j
('
GENuclearEnergy
~
.a J. E' buinn, Projects Maneger GeneralDoctric Company l
LMR and SBWH Programs 17S Curtner Avenue, AMC 165 San Jose, CA 95125-1014 406 925-1005 (phone) 406 925-3991 (facsimile)
July 20,1995 MFN 099-95 Docket STN 52-004 Document Control Desk U. S. Nuclear Regulatory Commission j
Washington DC 20555 l
Attention: Theodore E. Quay, Director Standardization Project Directorate
Subject:
SBWR -. Withdrawal of GE GIRAFFE Audit Report & Associated Affidavit
Reference:
1.
Letter from Dino Scaletti (NRC) to Mr. J. E. Quinn (GE), Request For Withholding Information From Public Disclosure, General Electric (GE) " Audit Report ARP 95-1 Quality Assurance Audit of Simphped Boiling Water Reactor (SBWR) GIRAFFE Test Program by Service and Proircts Quality January 24 through 26", dated July 6, 1995.
2.
Letter MFN 036-95 from J. E. Quinn (GE) to R. W. Borchardt (NRC), GE l
GIRAFFE Audit Report, dated March 1,1995.
i In response to the NRC's Reference I letter, GE formally requests the withdrawal of the proprietary version of the GIRAFFE Audit Report and its associated affidavit. This material was transmitted to the -
NRC in Reference 2 Please return these documents to GE.
The proprietary version of the GIRAFFE Audit Report will be available for NRC review in GE's San Jose California offices.
I Sincerely, k
ulnD
' j cc:
P. A. Boehnert (NRC/ACRS)
(2 paper copies plus E-Mail) 1 I. Catton (ACRS)
(1 paper copy plus E-Mail)
S. Q. Ninh (NRC)
(2 paper copies plus E-Mail)
J. II. Wilson (NRC)
(1 paper copy. plus E-Mail)
D. Scaletti (NRC)
(1 paper copy. plus E-Mail)
- N P m n m gg,.
V PDR
)