Telecopy AO 74-15A & 15B:on 740324,setpoint Shift Found on Switches dPIS-2-2-129B & TS-2-12-99.Caused by Instrument Drift.Switches Recalibr,Tested & Returned to Svc
ML20086L256
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 03/25/1974
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086L252 List:
References
AO-74-15A, AO-74-15B, NUDOCS 8402080024
Download: ML20086L256 (2)


Text

.

A4A. s.u.,4.A a u a...;.u & 11v v v. ;,,, t y

j f

t Peach Potton Atomic ro.:er Station 2

3 Delta, Penncylvnnia

~

17314' di Ihrch 25,1974 g

-2 Mr. J m.ec P. O'Reilly, Director a

Unit <. : Ct t ec Atc~i c Ener; y Co.niccion I

DirNtcr"te of Eeculatory Operations t.71 Pa r': Ave: 2e

/ing of Fruccia, Pennsylvania 19406

-5 S :b ice + : Ab-or,1 Ocevre.,en 2h-IIc :r I:ctifiention 3

J Confircin; ty convencation with Mr. R. A. Feil, A.E.C. Region I l

Eegulatory Operationc Office on March 25, 1974.

1 JE

Reference:

Licence I! umber DPR 44, Amendment I! umber 1

-i A.

Technical Specification Table 3 2.3 j

B.

Technical Specification Table 3 2.A Report I!o. :

50-277-74-15A and 15B i

Repert Date:

March 25, 1974 4

Occurrence Date: '.rch 24,1974

.i Facili t;, :

icach Ecttom Atomic Pc.ter Station R. D.1, Delta, Pen:.cylvania 17314 3

-m Identification of Occurrence:

k A.

Setpoint chift on dPIS-2-2-1293.

2 B.

Setpoint shift on TS-2-12-99 ni d.

Conditienc Pridr to Occurrence:

'2 Plant shutdown.

m

=iw Deccription of Occurrence:

A.

During inctrument curveillance testing, dPIS-2-2-1293 tripped at 0.45 paid inctcad of within the Tech Spec limits of 0 5 to 15 pcid.

B.

During inctrument curveillance testing, TS-2-12-99 tripped at g

approximately 142 F instead of within the Tech. Spec limit of 1 140 F.

h Decignation of App rent Cauce of Occurrence:

_i

.tnability of culte.n to hold precice cetpoints. This type of W

h.

switch is precently under ctudy as to proper ap^olication.

B.

Obvious cetroint drift.

y Ana,yc1c of Occurrcnce:

A.

The setpoint chift of dPIS-2-2-129; would not have defeated the logic to produce the required correct loop celection. The j

remaining cultenes in thic logic were t ithin specifications and it would have produced the proper action.

B.

The cetroint chift of TS-2-12-99 was minor and would not have teacurnb}y affected plant or public safety.

1 1

s I

8402080024 740403 p Hq 1

ot?y 7]

05000277 P,DR ADOCK m

x

-4

s 6

o J Cfr

" r. i v e /.c t i on :

Ea t;. c.;; tel c - re reculibrated, tecte:1 n:ul r, turned to cervice.

3 9r u11;,+._iti;l -::.tchen ar. alreaci.'t part of the Group being n.

4.<.,.-... a,.

2.,

B.

Tho.

t <.

turo rcitch will be invcrtic,ted becauce there is inelication of previouc cetroint drif t.

Fail: e P-ta:

A.

The pIrticular c.: itch 1;,0 no previouc hictory of failure, but thic t:~e of r.: itch + :n failed ceven timec previoucly in variouc rervicec.

B.

The tcrporature c.zitch h c been found outcide of crecc previoucly,,but that failure,:ac found to be due to cet ting the c.: itch tea cloca to the decired limit.

See Abnormal Occurrence Ecport dated October 1, 1973 f'

,/ c'. s /.~,.,,,/*

R. G. Fleiccir.,nn, II Peach Ecttom Atomic Power Station l

l