Forwards Draft Changes to FSAR Section 9.1.5.5.5 & Table 9.1-12,per 840328 Telcon Re Reactor Crane Performance Testing.Info Will Be Incorporated Into June 1984 Rev to FSAR
ML20084Q511
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 05/16/1984
From: Bradley E
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Schwencer A
Office of Nuclear Reactor Regulation
References
NUDOCS 8405210318
Download: ML20084Q511 (5)


Text

_

e o

PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101

' "* ^ ", [;," ^ " ' " ' ' "'

E2:51 e4 s-4ooo A.......A..s..

EUG ENE J. BR ADLEY assoctATs esseenAL counsak DON ALD BLANNEN RUDOLPH A. CHlLLEMI E. C. MIR M H A LL T. H. M AH ER CORNELL PAUL AUERBACH AssesTANT.ENER AL CoWNsEL EDW ARD J. CULLEN, J R.

THOM AS H. MILLER. J R.

8 1REME A. McMEN N A AssesTANT CoWNsEb Mr. A.

Schwencer, Chief Docket Nos.:

50-352 Licensing Branch No. 2 50-353 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Limerick Generating Station, Units 1&2 Information for Auxiliary Systems Branch (ASB) Concerning Reactor Enclosure Crane

References:

Telecon between M.

K. Caldwell and J. H. Arhar (PECO), and J.

Ridgely (NRC/ASB; on 3/28/84.

File:

GOVT 1-1 (NRC)

Dear Mr. Schwencer:

Attached are draft changes to FSAR 3ection 9.1.5.5.5 and Table 9.1-12 which were discussed in the referenced p

telecon concerning reactor enclosure crane performance testing.

The information contained on these draft FSAR changes will be incorporated into the FSAR, exactly as it appears on the attachments, in the reviaion scheduled for June, 1984.

Sincerely, Eug.e J B a ley JHA/gra/050984850 Attachment cc:

See Attached Service List 8405}h 0 k

PDB A

L

[

?

cc: Judge Lawrence Brenner (w/o enclosure)

Judge Richard F. Cole (w/o enclosure) i Troy B. Conner, Jr., Esq.

(w/o enclosure)

Ann P. Hodgdon, Esq.

(w/o enclosure)

Mr. Frank R. -Ranano (w/o enclosure)

L Mr. Robert L. Anthony (w/o enclosure) r Charles W. Elliot, Esq.

(w/o enclosure)

[

Zori G. Ferkin, Esq.

(w/o enclosure)

. [;,.,.

Mr. 'Ihamas Gerusky (w/o enclosure)

Director, Penna. Emergency (w/o enclosure)

Management Agency Angus R. Love, Esq.

(w/o enclosure)

David Wersan, Esq.

(w/o enclosure) i Robert J. Sugarman, Esq.

(w/o enclosure)

Spence W. Perry, Esq.

(w/o enclosure).

l Jay M. Gutierrez, Esq.

(w/o enclosure)

Atanic Safety & Licensing (w/o enclosure)

Appeal Board Atomic Safety & Licensing (w/o enclosure)

Board Panel Docket & Service Section (w/o enclosure)

Martha W. Bush, Esq.

(w/o enclosure) i

~Mr. James Wiggins (w/o enclosure)

Mr. Timcthy R. S. Canpbell' (w/o enclosure) g Ms. Phyllis Zitzer (w/o enclosure)

Judge Peter A. Morris (w/o enclosure) r l

e 9

0 e

i

~

a l

  • 1 g

b

[

l LGS FSAR j

O the following procedure:

A dimensional check of the hook is

(

i performed and the dimensions recorded.

The hook is then proof-tested at 200% of its rated capacity.

After the test, the hook is given a magnetic particle examination, and its dimensions are rechecked and recorded.

The hook is accepted.if no cracks, t

permanent deformation, or other defects are produced by the testing.

l l

9.1.5.5.4 Ropes-Samples.are taken from,each wire rope to,be used in the crane and are subjected to.. destructive breaking strength tests to verify l

that the rope exceeds the manufacturer's published value for

. breaking strength.

At least two'such tests are performed on each j

3 rope.

9.1.5.5.5 ' Performance and Acceptance Tests l

Af ter erection of the crane in the reactor enclosure, extensive j

. performance and acceptance testing is carried out, including:

3 a.

Detailed checking of all mechanical and electrical components of the crane to verify proper assembly and j

operation j

b.

Running-in tests at no load.

This test includes all

(

speeds and motions for which the crane is designed plus t

verification of the proper operation of all limit

'e switches.

i c.

Load testing at 125% of the rated capacity.

This test l

includes the full range of movement for hoist raising and lowering and bridge and trolley travel.

l l

)

d.

Performance testing at 100% of the rated capacity.

This test includes all speeds and motions f'or which the crane t

is designed, plus verification of the.oroper operation of all, limit switches.[&rbrbc.e. tesSn3 a+ len h 1007 Icf l

rnH emomWy wig. ;. a ca.doeJed en '4 fw*d more<-

l Mi/ swiT/eb 4;phlo c:arkdof A // mb*'*m' *vos % 4m.,t N r A ' % o.,e k i/e b,

f.aJ M /,mra' ne: % / /i; :/ saa % kr

  • 'or/ wereof #ss 6x sak.e/ AG. Anhy H, 4t[y?$.Mb/s9./~rs, h

~

x1Rev.-10, 09/82 9.1-82

--- = C-3-,4ew w- *=e c ar m h.'

.-.r.,

-ww+~-

\\

I f.

7 L J g

D-LGS FdAR TABLE 9.1-12 (Cont'd)

(Page 3 of 6)

NON-REGULATORY POSITION CONFORMANCE CONFORMANCE NOTES

p. Trolley and bridge X

motors

q. Cab located controls X
r. Safety devices, limit X

devices

s. Operating manuals - MWL
  • X
t. Change f'om constr.

X r

to operating

u. Installation instructions X

C.4 Mechanical Check, Testing and Preventive Maintenance

a. Mechanical check X
b. 125% static test (2-block) i.

125% static test X

(IO 11.

100% full per-X formances test

{

J iii. 2-block X

(15)

c. Preventive maintenance X
d. Cold proof test X

(16) l C.5 Quality Assurance X

(17)

(1)

Position C.1.a.

The load lifts during construction were riot greater than those for plant' operation, therefore no separate specifications were prepared.

(2)

Position C.1.b(1).

Box girders are not of a closed design.

i (3)

Position C.1.b(3).

The. crane manufacturer did not perform impact testing on any structural members.

(*)

Position C.1.b(4).

Not applicable - no ASTM A 514 is used.

L

s er

.Q L J D

g LGS FSAR y_

TABLE 9.1-12 (Cont'd)

(Page 6 of 6)

L component failures.

Fu r t.h ermo re, such testing violates t.he ANSI Standard B30.2 and Title 29 CFR, Part 1910.179(k).

A non-destructive examination (NDE) following the cold proof test is performed on-10% of each critical weld.

Cold proof testing every 40 months, followed by NDE, will not be performed since the crane operating temperature will not be less than 600F.

(27) According to the implementation Section D.2 of the guide, the quality assurance discussion of Paragraph C.5 is not applied to cranes ordered before September, 1976.

Although the Limerick crane was ordered in August, 1973, a quality assurance program was required of the vendor.

However, this program could not and did not address the recommendations of Paragraphs C.1 - C.4 as suggested in D q aph C.S.b of the guide.

s

09) Q 75s SeArvd y Akr//.swih4 we'// h hrkd L3'Af r
  • Vo l

foad to dearen.s/r4 /e ?& Ad'py a/ /C. 44W dcJ'N.

N 7ks 3enerd v,,oper 4hr}/.:rsui/e4 si orr/y dep s.<ofe d u,>me

=

de druns pas}r%r M no/ A com A&.

O*b 7kt-pho/c ce//.s 74*f Abrif nuvwf ovex &.ype / Az/pec/

n wl// L krkd' Winf A. o 9l /ond yb o' ma,.r,%k

,L, e

Aaj3 a f aL. Ak,;f aw;44e.r. L pi,chce/Ar e mfy y

i

& ee c(s. d e p.e sh. par /Khr c/ /As. 2.kp'. nsd hvde,.g.,d.nof

//u cru /od c.) 7s,. p m / ja,y s o y,s,_,

,,, g,, s,;

,. g,,,,,.,g,.

P'*"d "reve me r/- to ?Mc.et&c~c ord' c4 4 4<;d e mo' y

/ro//e.y snn't u d// A e h r k d s a! 9 4 o */o hdsbdees.sfek k

ed' /de. /iarif s wi

. 7he h s e / A hri f deviA 4r.t u ent dep'so/ r%. cm /od.

y udJ er n A-es. 6cWy a A,//

o e rr pslrdh of v4. briofyr.

o' h//ey sera

~-

Rev. 9, 08/02 e

a