ML20084P532
| ML20084P532 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 05/11/1984 |
| From: | Schnell D UNION ELECTRIC CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| U-78, ULNRC-818, NUDOCS 8405180253 | |
| Download: ML20084P532 (1) | |
Text
s -
~
~Tf($
UNION ELECTRIC COM PANY 1908 GRATIOT STREET ST. LOUIS, MISSOURI MA4 LING ADDRESS:
DON ALD F. SCHNELL P.O. BOX 149 May 11, 1984
r wu'=. = '= =au a' = = i=
v.c.......
Mr. James G.
Keppler Regional Administrator U.S. Nuclear Regulatory Commission
' Region III 799 Roosevelt Road Glen Ellyn, IL 60317
Dear Mr. Keppler:
ULNRC-818 FINAL 10CFR50.55 (e) REPORT U-78 HALON FIRE PROTECTION SYSTEM CHEMETRON CHECK VALVE FAILURE CALLAWAY PLANT
REFERENCE:
ULNRC-793 dated April 10, 1984 The referenced letter provided an interim report regarding a significant deficiency involving failure of a spring seat for a Chemetron No. 1-061-0732 check valve during discharge testing of a Halon Fire Protection System.
As reported, parts from the fractured spring seat became lodged in a selector valve which may have adversely affected subse-quent discharges.
The vendor has performed the evaluation of the failure and concluded by successful testing that an upgraded
- material for the spring seat is all'that is required.
Union Electric has installed the reworked check valves with the upgraded spring seat in all Halon systems.
In order to retain the UL listing of the original check valve the vendor has submitted the documentation for the upgraded check valve to UL for their final approval.
This letter serves as our final report on this subject.
Very truly yours, Donald F.
Schnell PBD/jm cc:
W. L. Forney, Region III Richard DeYoung, Director I&E' NRC Resident Inspectors, Callaway Plant (2)
Missouri Public Service Commission gg4 g% 1 8405180253 840511 nG I d PDR ADOCK 05000483 g G, v i
S PDR yv m