Informs of Insp Completion Re safety-related Hydraulic Pipe Restraints Accessible During Power Operation on 741121.Two of 20 Restraints Located on RHR Pump 3A Indicated Hydraulic Fluid Levels Below Min Allowable Level & Replaced
ML20084D761
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/04/1974
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Anthony Giambusso
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20084D695 List:
References
NUDOCS 8304120321
Download: ML20084D761 (1)


Text

.

FLORIDA POWER & UGHT COMPANY December 4, 1974 i.,

3

%lh

'l Mr. Angelo Giambusso D.

Deputy Director for Reactor Projects

- {

l Directorate of Licensing Y.

- /

i Office of Regulation

',/

Jr

,/

U. S. Atomic Energy Cossnission Washington, D. C.

20545 7 fi. & 's, Dear Mr. Giambusso TURKEY POINT UNIT NO. 3 DOCKET NO. 50-250 4

SAFETY RELATED HYDRAULIC PIPE RESTRAINTS ACCESSIBLE DURING POWER OPERATION The inspection of the subject restraints in accordance with the continuing requirements of the Directorate of Licensing letter i

of November 8, 1973, was completed on November 21, 1974.

Two of the twenty restraints inspected had indicated hydraulic fluid levels below the minimum allowable level and were replaced with spare units.

These restraints were located on the 3A Residual l

Heat Removal Pump.

Very truly yours, l

):) be ')wlLp RobertE.p,hrig U

REU/HNP/cpc i

cca Mr. Norman C. Moseley Jack R. Newman, Esquire d

'n I

ib' l

Mp 0304120321 751217 DR ADOCK 050002y COPY SENT REGION,