Submits Revised Schedule for Submittal of Tech Specs Re Snubber Surveillance.Unit 1 & 2 Specs Will Be Submitted on 840615 & 0519,respectively
ML20084D462
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 04/23/1984
From: John Marshall
ARKANSAS POWER & LIGHT CO.
To: John Miller, Stolz J
Office of Nuclear Reactor Regulation
References
0CAN94803, CAN94803, NUDOCS 8405010357
Download: ML20084D462 (2)


Text

ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 LITTLE ROCK. ARKANSAS 72203 (501)371-4000 April 23, 1984 OCAN948403 Director of Nuclear Reactor Regulation ATTN: Mr. J. F. Stolz, Chief Operating Reactors Branch #4 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Director of Nuclear Reactor Regulation ATTN:

Mr. James R. Miller, Chief Operating Reactor Branch #3 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.

20555

SUBJECT:

Arkansas Nuclear One - Units 1 & 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Submittal Date for AN0-182 Technical Specifications Revisions for Snubber Surveillance Gentlemen:

The purpose of this letter is to provide NRC with a revised schedule for AP&L's submittal of the ANO-1&2 Technical Specifications Revisions for srubber surveillance.

AP&L met with NRC on August 23, 1983, at Bethesda to discuss mutual concerns on tne snubber surveillance issue for AN0-1&2. At this meeting, it was agreed that AP&L would submit revised Technical Specification Change Requests (TSCRs) for AN0-1&2 which would reflect the agreements reached.

The ANO-2 TSCR submittal date was projected to be February 1,1984, and the ANO-11SCR would be 60 days after the AN0-2 submittal date.

The AN0-2 TSCR submittal date was based upon our performing a physical walkdown/veriiication of the safety-related mechanical snubbers during what was then anticipated to be an 8-week refueling outage, plus 60 days for TSCR preparation, review and approval. However, due to unforeseen problems and delays (e.g., the ANO-2 Reactor Vessel Head bolting issue),

$, [No!

0 0

9 MCMDEf1 MiOOLE SOUTH UTIUTIES SYSTEM

1 Mr. J. F. Stolz/

Mr. J. R. Miller April 23, 1984 i

we did not return to full power until February 25, 1984.

As a result, j

preparation of the TSCR was delayed.

Also, per our discussions with your Mr. Bob Lee, NRC requested that AP&L expedite our revised ANO-182 RETS (Radiological Effluent Technical Specification) submittal.

As a result, we prioritized the RETS response at the expense of delaying the snubber submittal, which was agreeable with Mr. Lee. Additionally, the

]

recent electrical fire in The First Commercial Bank Building where l

AP&L's Little Rock General Offices are located has disrupted our routine operations.

In view of the above circumstances our proposed submittal dates have been revised as follows:

)

ANO-2 Submittal Date May 19,1984 ANO-1 Submittal Date June 15, 1984 It should be noted that the ANO-1 schedule is within 120 days of completion of the AN0-2 outage as originally discussed.

Very Tr ly Yours, John R.

arshall Manager, Licensing JRM:DET:mb i