ML20083P221

From kanterella
Jump to navigation Jump to search
Forwards Rev 2 to Fsar,Including Page 14-106 Inadvertently Omitted from Rev 1
ML20083P221
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/28/1983
From: Westafer G
FLORIDA POWER CORP.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20083P226 List:
References
3F-0183-22, 3F-183-22, NUDOCS 8302030416
Download: ML20083P221 (1)


Text

f s

.x vA h.

Y?h.

'*"DNcA

$o S'

'n ga Fkwida Power C On POR & T ION January 28,1983 3F-0183-22 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operatir.g License No. DPR-72 Final Safety Analysis Report Revision 2

Dear Mr. Denton:

On January 10,1983, we submitted Revision 1 to the Crystal River 3 Final Safety Analy.i Report. Page 14-106 was inadvertently omitted.

To correct this error, we have enclosed Revision 2 to the Crystal River 3 Final Safe :y Analysis Report. One original and twelve (12) copies of Revision 2 are included.

Revision 3 to the Crystal River Final Safety Analysis Report will be filed no later than July 22,1983.

Sincerely,

/

G. R. Westafer Manager Nuclear Licensing and Fuel Management OF i,o Attachments TSW:mm cc:

Mr. 3. P. O'Reilly, Regional Administrator Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 3100 Atlanta, GA 30303 l

8302030416 830128 PDR ADOCK 05000302 K

PDR g

General Office 320i Thirty-fourth street sourn. P O Box 14042. St Petersburg. Florda 33733 e 813-866-5151 N

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _