ML20083K073

From kanterella
Jump to navigation Jump to search
Forwards Safety Parameter Display Sys for Emergency Response Facility Program, in Response to Generic Ltr 82-33 (Suppl 1 to NUREG-0737).Schedule for Implementing Sys Not Impacted by Schedule for Control Room Design Review
ML20083K073
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 04/10/1984
From: Musolf D
NORTHERN STATES POWER CO.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20083K075 List:
References
RTR-NUREG-0737, RTR-NUREG-737 GL-82-33, NUDOCS 8404160056
Download: ML20083K073 (1)


Text

. _ _ _ _ _ _ _ _ _.

5 Northem States Power Company 414 Sconet Mart

%nneapons unnesota $5401 Teepnone in12i aao-5500 April 10, 1984 Director Of fice of Nuclear Reactor Regulation U S Nuclear Regulatory Commission Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Supplement 1 to NUREC-0737, Generic Letter 82-33 Safety Parameter Display System S_1faty Analysis Report and Implementation Plan The document furnished with this letter is submitted pursuant to Section 4.2 of Generic Letter No. 82-33 dated December 17, 1982 and our response dated April 15, 1983.

The docummat also covers the imptomentation plan which will be performed and documented in accordance with Administrative Procedures for the NSP Uniform Modification process.

Our April 15, 1983 response to CL 82-33 shows the plan for integrating SPDS into the other identified elements.

The schedule for implementing SPDS is not impacted by the schedules for the control room design review or function-oriented emergency operating procedures.

D David Musolf Manager - Nuclear Support Services D!01/ dab c

Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector C Charnoff 6

'0 Attachment N

i 04M160056 040410 PDft ADOCK 03000?(12 I?

f*DH J