ML20083G368
| ML20083G368 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 12/14/1983 |
| From: | Osbakken M MILTON S. HERSHEY MEDICAL CENTER, HERSHEY, PA |
| To: | Gilinsky V NRC COMMISSION (OCM) |
| Shared Package | |
| ML20083G367 | List: |
| References | |
| NUDOCS 8401110309 | |
| Download: ML20083G368 (1) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
n
~
hD
~
g4,, ' -P P 3 : 2 /2f E. n m, kr
- ~'
- 5EAl:CH December 14, 1983 Ccmnissioner Gilinsky U. S. Nuclear Regulatory Comnission Washington, D. C.
20555
Dear Mr. Gilinsky:
Recently the Nuclear Regulatory Comnission reconnended restart of 'IMI Reactor I.
I think that this decision is quite premature, in light of the nuny unanswered questions concerning the cmpetence, integrity ard safety issues in the running of the 'IMI facility. I think that the NRC Camissioners need outside pressure ard encouragenent to re-evaluate their decision, especially in light of the publicized safety issues. A premature decision at this time may jeopardim the health ard safety of the area residents, any potential future constructive um of nuclear power, ard the credibility of the WC.
As an area resident concerned about the many varied issues involved in this difficult and controversial problen, I urge you to take action to delay any further decision concerning the restart of Reactor I until all the data concerning the, previous operation of 'IMI are collected and analyzed.
J Sincerely, V bhYa&%)
Mary Osbakk 1, M.D., Ph.D.
Assistant Professor of Radiology and Medicine The Milton S. Hershey Medical Center IO/jp Hershey, PA 17033
e401110309 840109 PDR ADOCK 05000209 g
_______