GENuclearEnergy J. E. Quinn, Projects Manager GeneralDoctric Company LMR and SBWR Programs 175 Curtner Avenue. wG 165 San Jose. CA 95125-1014 p
408 925-1005 (phone) 406 925-3991 (facsimile)
April 28; 1995 MFN No. 068-95
- Docket STN 52-004 Document Control Desk U. S. Nuclear Regulatog Commission Washington DC 20555 Attention:
Theodore E. Quay, Director Standardization Project Directorate
Subject:
SBWR, MINUTES OF TELECON WITH NRC ON APRIL 6,1995.
Reference:
Letter MFN No. 04695,J. E. Quinn (GE) to R. W. Borchardt (NRC),
SBWR Test and Analysis Program Description, dated April 13,1995.
Attached please find the GE Minutes of the Subject Telecon. The Attachment documents the terms of the agreement on the TRACG Model (NEDE-32176)
Outline, comments on the TRACG Qualification (NEDE-32177) Supplement, comments regarding Preliminaq Validation Results, and a commitment to provide an Outline of the TRACG Application (NEDE-32178) report revision.
This agreement completes Item 58 of Attachment 2 to the Referenced letter Sincerely,
'j pf
/
?
y Jame uinn, Projects Manager
/
LMR and SBWR Programs
Attachment:
Minutes of Telecon with NRC on April 6,1995.
cc:
P. A. Boehnert (NRC/ACRS)
(2 paper copies plus E-Mail w/ encl.)
I
- 1. Catton (ACRS)
(1 paper copy plus E-Mail w/ encl.)
S. Q. Ninh (NRC)
(2 paper copies plus E-Mail w/ encl.)
J. H. Wilson (NRC)
(1 paper copy plus E-Mail w/ encl.)
9505100230 950428 ADOCK0520g4 PDR A
1 J
i 4
1j GENuclearEnergy J. E. Quinn.
' s Manager GeneralElectric Company LMR and SB Programs 175 Curtner Avenue, MC 165 San Jose, CA 95125-1014 s.
l 406 9251005 (phone) 406 925-3991(facsimile) 1 I
Attachment to MFN No.' 068 ' Minutes of Telecon with NRC on April 6,1995 '
e Participants; NRC BNL l
Son Ninh Kumar Rohatgi Jim Wilson Peter Kroeger Bobjones Tim Collins Md. Razzaque i
Andre Drozd Mike Snodderley -
t EPRI GE Tom Fernandez Bharat Shiralkar Ram Sdnhaan John Leatherman Jens Andersen (Wilmington)
Terry McIntyre (part-time) l l
i i
.]
J f
I l
l i
I 1
l i
l l
l e
g GENuclearEnergy J. E Quinn. Projects Manager GeneralElectric Company LMR and SBWR Programs 175 Curtner Avenue, M/C 165 San Jose, CA 95125-1014 408 925-1005 (phorn) 408 925-3991 (facsimile)
Summary of discussion:
- 1. Model LTR Revision a) Outline is acceptable to Reactor Systems Branch (Collins) and to Containment Branch (Drozd), provided j
the applicability to the containment is clearly delineated in each section. Drozd was also requested to l
provide input on any specific additional information that he would like to see in the report.
j l
- 2. Qualification LTR Supplement a) Uncertainty section looks skimpy (Collins). It was clarified that the uncertainties in the major model
)
parameters would be defined in this LTR. The actual uncertainty analysis would be documented in the Application LTR. Both LTRs are scheduled to be submitted simultaneously (March 31,96). The split of l
the material between reports and a roadmap is provided in ;he TAPD, Rev. B.
l b) The approach to treat the effects of mixing in the drywell will be discussed in the Application LTR.
j c) Choice of the nodalization for test facilities vs. SBWR will be treated through both scaling groups and nodalization studies as appropriate.
c) Numerical values of differences between data and predictions will be provided in addition to qualitative descriptions of goodness of comparisons.
d) Use of Ontario flydro data. Data will be used only for confin.,atory purposes (third party, non NQA-1 data). Comparisons will be included in Qualification LTR.
e) Effects of scaling distortions in test facilities. No general, quantitative method, logy exists for accounting for distortions. If the distortions are in the major parameters, some allowance wih have to be made for a scaling bias.
- 3. Prcliminary Validation Results a) These will be provided to give the NRC an early look at the TRACG predictions of data.
b) The schedules for these " quick look" reports will be provided to the NRC in eraly May.
- 4. An outline of the Appli:ation LTR Revision will be provided to the NRC in early May.