ML20081B995
| ML20081B995 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 03/01/1984 |
| From: | Edelman M CLEVELAND ELECTRIC ILLUMINATING CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| RDC-32(81), NUDOCS 8403120096 | |
| Download: ML20081B995 (1) | |
Text
f 0/>tB T t; p at C it r }
s D
C; E O T D i, p; = s ! !a! ' d [Ma', n :-
U a, a~
4 fi t is u bLo y L i_. set u
- _ u ; ei 41
- Lm is
- i+ n!
P.o. Box 5000 - CLEVELAND, oHlo 44101 - TELEPHONE (216) 622-9800 - lLLUMINATING BLDG.
- 55 PUBLIC SoVARE Serving The Best Location in the Nation MURRAY R. EDELMAN March 1, 1984 VICE PRESIDENT NUCLEAR Mr. James G. Keppler Regional Administrator, Region III Offica of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Chicago, Illinois 60137 RE:
Perry !;uclear Power Plant Docket Nos. 50-440; 50-441 Bailey 720 Utility Stations (RDC 32(81))
Dear Mr. Keppler:
Our final report to you dated November 29, 1983 concerning Bailey 720 Utility Station devices suoplied by General Electric in various Control Room Panels and Local Panels located in the Power Generation Control Complex (PGCC), stated that all Bailey 720 Utility Station devices would be returned to Perry, inspected, accepted, and installed in the PGCC panels by March 1, 1984.
However, due to repair delays at Bailey, three remaining 720 Utility Stations have not yet been returned to Perry.
It is now anticipated that all work on the 720 Utility Stations will be completed by May 1, 1984.
Sincerely, Murray R. Edelman Vice President Nuclear MRE:dm cc:
Mr. M. L. Gildner U.S. Nuclear Regulatory Commission NRC Site Office c/o Document Management Branch Washington, D.C.
20555 Director Office of Inspection and Enforcement Records Center, SEE-IN U.S. Nuclear Regulatory Commission Institute of Nuclear Power Operations Washington, D.C.
20555 11 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 8403120096 840301 PDR ADOCK 05000 MAR 6 1984 7A27 %