Dh, B 1605-T,
/LLINOIS POWER 00MPANY l
U-10129 CLINTON POWER STATION. P.O. BOX 678. CLINTON. ILLINOIS 61727 February 22,1984 Docket No. 50-461 Mr. James G. Keppler Regional Administrator Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Subj ect:
Potential Deficiency 55-82-11 10CFR50.55(e)
Incorrect Identification of Base Material and Weld Procedures on Piping Hanger Travelers
Dear Mr. Keppler:
In Illinois Power Company letter dated November 14, 1983 (ref:
letter D.P. Hall to J.G. Keppler, U-10106), your office was provided an interim report addressing the status of the subject 10CFR50.55(e) investigation.
It was anticipated at the time that approximately ninety (90) days would be necessary to complete the investigation and to provide a final report on the issue.
Illinois Power Company is presently involved in the final verification actions necessary to evaluate the adequacy of the investigation and the corrective actions taken.
It is anticipated that approximately thirty (30) additional days will be necessary to complete and evaluate the results of this activity, and to provide a final report on the issue.
If you have any questions or comments regarding the status of actions taken on this issue, please contact Illinois Power Company.
S
- cerely, Hall Vice President RDW/ lag cc:
NRC Resident Office Director - Office of I&E, US NRC, Washington, DC 20555 Illinois Department of Nuclear Safety INPO Records Center FEB 2 41984 B402290276 840222 PDR ADOCK 05000461 S
PDR 30Jm9