ML20080J140

From kanterella
Jump to navigation Jump to search
Forwards Revised Pages to Industrial Security Manual & Security Force Training & Qualification Manual.Pages Withheld (Ref 10CFR73.21)
ML20080J140
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 02/07/1984
From: Giesler C
WISCONSIN PUBLIC SERVICE CORP.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
CON-NRC-84-26 NUDOCS 8402140455
Download: ML20080J140 (2)


Text

SECURTTY NRC-84-26 SAFEGUARDS INFORMATION WISCONSIN PUBLIC SERVICE CORPORATION P.O. Box 1200, Green Bay, Wisconsin 54305 February 7, 1984 Mr. J. G. Keppler, Regional Administrator Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Dear Mr. Keppler:

Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Revisions to the Kewaunee Nuclear Power Pirit Industrial Security Manual and Security Force Training and Qualification Manual

References:

1) Letter to C. W. Giesler (WPSC) from W. L. Axelson (NRC) dated August 25, 1983
2) Letter to C. W. Giesler (WPSC) from J. A. Hind (NRC) dated November 4, 1983 Attached please find six (6) copies of the recently revised pages to the Kewaunee Nuclear Power Plant (KNPP) Industrial Security Manual (ISM) and Security Force Training and Qualification Manual (T&QM).

The revisions specifically address your concern regarding the Security Organization at the KNPP as identified in the referenced letters, and also include a recent modification to the security system electrical supply source.

A narrative description of the revisions is provided in Attachment A and the affected pages are included in Attachments B and C.

Wisconsin Public Service Corporation (WPSC) has worked very closely with your staff (Mr. Kers) in developing the attached revisions regarding the Security Organization. We have also expressed our concern regarding the immediate imple-mentation of the revisions. Specifically, the revisions will require substan-tive administrative changes which will require additional time to fully implement. WPSC has thus set March 15, 1984 as a date at which the revisions will be fully implemented.

Encirure Ccnfains 8402140455 840207 SA?dGUARDS INFORMATION 0500030

(

SECURITY Upon Separation This fDRADOCK p

N@SOo2P q

sAF GUAR s ease is occontrolled 2

4FORMATl0N FEB 0 9.1984 OSDx305 cos r

'W 4.tys

1

. Mr. J. G. Keppler Fd ruary 7, 1984 SECURITY Page 2 SAFEGUARDS INFORMATION WPSC has determined that these changes do not decrease the safeguards effec-tiveness of the Security Manuals and are therefore submitted under the provisions of 10 CFR 50.54(p).

The attachment to this letter contains Security Safeguards Information as defined by 10 CFR 73.21, and therefore shall not be placed in the public docu-ment rooms.

Very truly yours, 0.

C. W. Giesler Vice President - Nuclear Power MSL/js Attach.

cc - Mr. Robert Nelson, US NRC (w/o attach.)

Mr. S. A. Varga, US NRC Encfo:uro Ccnfains SAFEGUARDS INFORMATION Upon Separation This POSS is Decontrolled-e S[. :;

Ta1

...g SECURITY SAFEGUAR0S INFORMATION