Nebraska Public Power District

" '* ""N[$$hfsbst"*"

LQA8300219 September 13, 1983 Mr. John T. Collins Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive Suite 1000 Arlington, TX 76011

Subject:

IE Bulletin No. 83 Nonconforming Materials Supplied by Tube-Line Corporation Facilities at Long Island City, New York; Mouston, Texax; & Carol Stream, Illinois 50 -4LQ 3

Dear Mr. Collins:

Pursi. ant to IE Bulletin 83-06 directive, a review was performed to determine if any Tube-Line supplied ASME Code materials have been received at Cooper Nuclear Station.

The Bulletin indicated that Tube-Line started supplying ASME Code components to the nuclear industry in 1981. The Bulletin also included lists of companies which, during the inspections, were identified as having purchased or received Tube-Line supplied materials. A review of those lists was performed to determine if Nebraska Public Power District had received materials from any of these companies. This review consisted of reviewing Qualified Vendors Lists from January 1981 to present to determine if any of the companies identified on IEB 83-06 were listed as an approved vendor.

There were five (5) companies common to both lists.

They are:

Dravo Chicago Bridge & Iron Crane Chempump Chicago Tube & Iron Guyon Alloys Computer listings of purchase orders from 1981 to present were reviewed to determine what, if any, purchases were made from these companies. The review revealed that orders filled by these companies did not include ASME Code components from Tube-Line.

In addition to the above reviews, a computer search was performed to deter-mine if any material certificates from Tube-Line were in the records system. Those found were from material used in the construction of CNS which were not ordered to ASME Code requirements.

95-u 8309200346 830913 PDR ADOCK 05000298 l

G PDR

i,,.

Mr; John T. Collins September 13, 1983 Page 2.

~ Based on the review performed in reference to the subject bulletin it has been determined that the Nebraska Public Power District has not received ASME Code components from Tube-Line Nbnufacturing.

The investigation and report preparation for this Bulletin took approxi-mately 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> to conduct.

If you should have any questions or comments regarding this subject, please contact me.

Sincerely, L.

L. G. Kuncl Assistant General Manager-Nuclear JMP:FEW:cmk

. Original:

U.S. Nuclear Regulatory Commission L

Document Control Desk Washington, DC 20555 j-i

o

J I

Mr. John T. Collins iSeptember 13, 1983 Page 3 STATE OF NEBRASKA )

) as PLATTE COUNTY

)

L. G. Kuncl, being first duly sworn, deposes and says that he is an authorized representative of the Nebraska Public Power District, a

public corporation and political subdivision of the State of Nebraska; that he is duly authorized to submit this information on behalf of Nebraska Public Power District; and that the statements contained herein are true to the best of his knowledge and belief.

L.).Kunc1 T

Subscribed in my presence and sworn to before me this / d day of September, 1983.