ML20080F975
| ML20080F975 | |
| Person / Time | |
|---|---|
| Issue date: | 03/19/2020 |
| From: | Tara Inverso Division of Fuel Management |
| To: | |
| Kallan P | |
| References | |
| Download: ML20080F975 (2) | |
Text
Enclosure 2 USED FUEL STORAGE AND TRANSPORTATION ISSUE RESOLUTION PLAN Issue Number: I-20-01 Performance Margins Recommendation: IV-3 (Cat 1)
Rev. 2.26.2020
Title:
Develop industry Best Practices guide for thermal modeling I.
Summary of Resolution Plan Industry and NRC will interact in public meetings and workshops as well as through letters to achieve the following:
Identify the current issues for industry with the implementation of the current best practices guidance Using the identified recommendations from the Thermal Modeling and Decay Heat PIRTs (Recommendation IV-1), create guidance for an informed approach, including (for example):
o greater flexibilities with more accurate decay heat models o realistic ambient temperature measurements vs. upper bound assumptions o graded approach for mesh convergence (currently costly GCI needed by all vendors) o pave the way to using alternative fuel performance metrics such as:
Use of stress analysis + peak clad temperature Average rod temperature vs. peak clad temperature Implement the guidance into a Topical Report.
Submit the Topical Report to NRC for approval and endorsement (Note this action will accomplish Recommendation IV-2)
II.
Proposed Actions and Due Dates ACTION RESPONSIBLE PARTY DUE DATE
- 1. Complete initial revision of RIRP NEI March 19, 2020
- 2. Review and discuss guidance to be developed at workshop NEI & NRC March 25-26, 2020
- 3. Gross Rupture Definition PIRT/Workshop NEI/EPRI & NRC TBD
- 4. Synthesis PIRT/Workshop of the Cumulative Impacts of Overlapping Bounding Inputs, Assumptions, and Uncertainties NEI/EPRI & NRC TBD
- 5. Workshop on Alternative Fuel Performance Metric(s) to Ensure no Gross Ruptures NEI/EPRI & NRC TBD
- 6. Thermal Modeling/Stress Analysis Approach to Meet Alternative Fuel Performance Metrics NEI/EPRI & NRC TBD
- 7. Develop draft Topical Report for thermal modeling and performance metrics NEI TBD
- 8. Review draft Topical Report in follow-on public workshop NEI & NRC TBD
- 12. NRC initiate review, approval, and endorsement of Topical Report (i.e.
implementation of Recommendation IV-2)
NRC
- 13.
- 14.
- 15.
- 16.
- 17.
- 18.
- 19.
- 20.
- 21.
22.