Responds to IE Bulletin 83-05 Re ASME Nuclear Code Pumps & Spare Parts Mfg by Hayward Tyler Pump Co.Subj Pumps & Parts Not Used in Safety Sys
ML20077M312
Person / Time
Site: Pilgrim
Issue date: 08/30/1983
From: Harrington W
BOSTON EDISON CO.
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
REF-SSINS-6820 83-230, IEB-83-05, IEB-83-5, NUDOCS 8309120302
Download: ML20077M312 (2)


Text

,

D no.

BOSTON EntsON COMPANY 800 BOYLSTON STREET BOSTONe MAmSACHUS ETTs 0 2199 wtLUAM D. HARRINGTON meeson vies passensest seustaan August 30, 1983 BECo 83-230 Mr. Thomas E. Murley, Regional Administrator U.S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406 License No. DPR-35 Docket No. 50-293 Response to IE Bulletin 83-05: ASME Nuclear Code Pumps and Spare Parts Manufactured by the Hayward Tyler Pump Company

Dear Sir:

The subject bulletin transmitted information concerning ASME Nuclear Code pumps manufactured by Hayward Tyler Pump Company (HTPC) and spare parts provided by HTPC in ASME Code pumps manufactured by HTPC or other companies.

Specifically the bulletin outlined actions to be taken oy licensees if certain HTPC pumps or spare parts were in use, or planned to be in use, in systems important to safety.

With regards to Pilgrim Station Unit No.1, there are no ASME Code pumps manu-factured by HTPC in use in systems important to safety. There are also no spare parts manufactured by HTPC in Code pumps important to safety.

An exhaustive search of our records data base has resulted in negative findings for the exis-tence of HTPC components.

At this time we do not have any plans to use HTPC pumps or spare parts in safety ralated systems at Pilgrim Station. To address future plans which would require the use of HTPC pumps or spare parts, HTPC will be added to our Approved Supplier List with the limitation that all future procurement of HTPC pumps or spare parts be evaluated in accordance with IE Bulletin 83-05.

The Approved Supplier List is a listing of suppliers who have been approved by Boston Edison Company Quality Assurance to supply safety related materials, equipment, and services for use at, or in support of, Pilgrim Station Unit No.1.

With regards to our cancelled Pilgrim Unit 2 Project, the requirements of this bulletin do not apply since we never possessed a construction permit.

However, we did procure four HTPC pumps for use in Pilgrim 2 and these pumps are listed in Attachment I to the bulletin.

At present we are marketing these pumps for nuclear and non-nuclear service.

Therefore, we are taking the following actions

\\

\\

8309120302 930030 h

PDR ADOCK 05000293 1

G PDR 10

(

CD3 TON EDI ON COMPANY Mr. Thomas E. Murley, Regional Administrator Page 2~

l to_ meet the intent of the bulletin.

If the pumps are sold / transferred to another nuclear power station for use in a system important to safety we will:

(1) advise you that the pumps were sold / transferred and to whom they were sold / transferred, and (2) advise the buyer / transferee that he must perform the actions specified in this bulletin.

We trust that the above information is satisfactory in complying with the bulle-tin requirements.

Should you require any additional information, do not hesitate to contact us.

Verytrulyyours, h

Commonwealth of Massachusetts)

County of Suffolk

)

Then personally appeared before me W.D. Harrington, who, being duly sworn, did state that he is Senior Vice President - Nuclear of Boston Edison Company, the applicant herein, and that he is duly authorized to execute and file the submittal contained herein in the name and on behalf of Boston Edison Company and that the statements in said submittal are true to the best of his knowledge and belief.

My Commission expires: May 2, 1986 M A d77, d w,

Notary Public TFF/ mat cc:

U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555 l

l

-.