Change 63 to Procedure OP/1/A/6100/01, Controlling Procedure for Unit Startup
ML20077E741
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 05/19/1983
From: Firebaugh L, Brandi Hamilton, Mayes R
DUKE POWER CO.
To:
Shared Package
ML20077E716 List:
References
NUDOCS 8307280429
Download: ML20077E741 (5)


Text

'

Form 34811 (7 81)

(Formerly SPD 1003@

DUKE POWER COMPANY (1)

IDNo:OP/it4fb800[0/

I PROCEDURE MAJOR CHANGE Change No:

63 PROCESS RECORD Permanent / Restricted To (2)

STATION: //li [].at; (3) PROCEDURE TITLE: bm1prM,u kW/)n,v b Mp8 M,inI;,a i

(4)

SECTION(S) 0F PROCEDURE AFFECTED: b v u w 4.'4 (5) DESCRIPTION OF CHANGE:

(Attach additional pages, if necessary.)'

W-l.L

@$ @[ -

ct (6)

REASON FOR CHANGE:

bWW b bh4bWa GNl du /!/[C

'M

$!/Y(3 lN */d DATE:

(7) PREPARED BY:

d 4

u' -

(8)

SAFETY EVALUATION This change:

Yes No d Represents a change to the station or procedures as described

~

in the FSAR, or a test or experiment not described in the FSAR?

Yes No

/ Requires a change to the station Technical Specifications?

Yes No

/

Involves an unreviewed safety question?

If the answer to any of the above is "Yes", attach a detailed explanation.

As appropriate attach a completed " Nuclear Safety Evaluation Check List" for=.

,bdNI4y19 Date:

3, '/ O

/

By:

(9)

REVIEWED BY:

[2 MNr.

DATE:

f- / '7 - 5 3

/}

~~75Rf* ^

v',

Cross-Disciplinary Review By: /54(td4 9 e' N/R:

(10) TEMPORARY APPROVAL (IF NECESSARY):

By:

(SRO) Date:

By:

Date:

(11) APPROVED BY:

DATE:

[

3 l

(12) MISCELLANEOUS:

Reviewed / Approved By:

Date:

Reviewed / Approved By:

Date:

(13) Page 1 of 1

8307280429 830722 Rev 14 PDR ADOCK 05000369 9/20/77 P

PDR

Fortir 34895 (6-82)

"armerly SPD -1003 3A PROCEDURE MAJOR CHANGE U3 N e No-PROCESS RECORD CONTINUATION FORM Page 1

of ^

(1,),,I,

f Jtu%s?s' h*ms a Lu%. L niiuwl av 2.,,.,,wi.. ;..,6,, aw er l

6 y

a o

.n. A.

f2 /l>r*1t'v1 (L'1li hlmituo h e.L IL MJ!

lot) 4Y

'Y 1 11b'1 a

y I '

h7/ On An],1., n I (1 lLY hl' 1111*.

l M1M L'.'fL T lti FD1 W 11412A'

$ lhH

?

(fl.

ll) L@])

A19 l'

Lb+1 ' Y ?'n't ')

v e

M11smn A 2]\\llAYL. bL3A(FC V LM L1: N O& Wn )

'n -thi M Dlw o)

]

'Nus$l-mas,2) c' o

ru n... a i

l I

i

w7n2M/wwY@h ENCLOSURE 4.4 PAGE 1 0F 3 Modes 1 and 2 Checklist Date/ Initial A.

The following items shall be completed prior to entering Mode 2:

/

1.

Check the Off Line Computer PT schedule and verify all scheduled PT's required for Modes 1 and 2 are up-to-date.

/

2.

Verify less than or ecual to 40 GPM controlled leakage at 2235 20 psig and document in the R.O. Log.

/

3.

Two licensed o.'erators are in the Control Room.

/

4.

The following instrumentation is operable per Tech Specs:

(IAE will sign off).

A.

Reactor Trio System Instrumentatinn (Tech Spec. 3.3.1, Table 4.3-1)

/

Power Range Neutron Channel

/

Power Range, High Positive Rate

/

Power Range, High Negative Rate

/

Overtemoerature Delta T

/

Overpower Delta T

/

Pressurizer Pressure-Low

/

Pressurizer Pressure-High

/

Pressurizer Level-High

/

Loss of Flow

/

Steam Generator Water Level-Low-Low

/

Undervoltage-NC Pumps

/

Underfrequency-NC Pumos

/

Safety Iniection Input from ESF

/

Power Range Interlock P7 (Functional Test completed within previous 92 days) l

EM

,/

PAGE 2 0F 3

/

Modes 1 and 2 Checklist

/

Power Range Interlock P10 (Functional Test comoleted within orevious 92 days)

/

Power Range Interlock P8 (Functional test completed within previous 92 days)

/

Turbine trip-low fluid oil pressure (Functional test completed within previous 7 days).

/

Turbine trio-Turbine Stop Valve closure (Channel functional test completed within orevious 7 days).

/

5.

Individual full length rod droo times less than or equal to 2.2 seconds. (IAE will sign off).

/

6.

The hydrogen control distributed ignition system is operable (IAE will sign off).

/

7.

Two containment hydrogen monitors are operable. (IAE will sign off).

/

3.

Two containment hydrogen recombiners are Operable.

/

9.

Verify less than or equal to 1 gpm leakage at 2235 ?.0 psig from any NC Pressure isolation valve specified in Table 3.4-1 in Tech l

Specs. (Test Group will sign of,f).

l i

/

10 Tech. Spec. Action Log has been reviewed for items that may effect entering Modes 2 or 1.

/

11.

No outstanding QA items affecting Mode 1 or ?..

12.

Verify applicable enclosures for Modes 1 and 2 of the following PT's have been completed within the surveillance period.

/

1.

PT/1/A/4600/03A (Semi-Daily Surveillance Items)

/

2.

PT/1/A/4600/038 (Daily Surveillance Items)

/

3.

PT/1/A/4600/03C (Weekly Surveillance Items)

f.'

EN'CLOSijRE 4.4 PAGE 3 0F 3

~

Mod s 1 and 2 Checklist

/

4.

PT/1/A/4600/03D (Monthly Surveillance Items)

/

5.

PT/1/A/4600/03E (Quarterly Surveillance Items)

B.

The following items should be completed prior to entering Mode 2 or as soon as oractical thereafter:

/

1.

Ice Condenser 3 ton crane is parked outside of ice condenser.

/

2.

Cooling fans and oil cumps are in operation on main setuo transformers.

/

3.

Place Acoustic 1.eak Detection Monitor in Auto and ensure points 1-10 are being scanned.

/

4.

Stop or verify the containment auxiliary carbon filter units are off when no longer required.

-.