{{#Wiki_filter:* h(p's f ( t-yr ? -3. N g C 0 a p o n a t i o se February 8,1983 3F-0283-09 Mr. Samuel J. Chilk Secretary of the Commission U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Attentioh: Docketing and Service Branch
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 NUREG-0737, Item II.F.2 Inadequate Core Cooling
Dear Mr. Chilk:
Florida Power Corporation (FPC) has received and reviewed the Order for Modification of License for Crystal River Unit 3 dated December 10,1982. FPC is currently working toward the requirements of Sections Ill.2 and 111.3 of the Order which are required to be completed on or before March 10, 1983. Specifically, Section 111.2 requires FPC to (1) complete a conceptual design review for a reactor coolant inventory tracking system; (2) identify the design selected; (3) submit a detailed scheduled for engineering of the inventory tracking system; (4) submit a detailed schedule for the procurement of the inventory tracking system; and (5) submit a detailed schedule for the installation of the inventory tracking system. Section 111.3 requires FPC to (1) review the status of conformance of all components of the inadequate Core Cooling Instrumentation system with NUREG-0737, Item ILF.2; and (2) submit a report of such conformance. In accordance with Section Ill.6 of the Order and within the time required, Florida Power Coproration (FPC) requests an extension of time for submittals of the required information. The proposed schedule for submittals and the justification for the delay are denoted below. FOO4180681 830408 PDR ADOCK 05000302 p PDR General Office 3201 inirty fourin street soutn. P O Box 14042. St Petersburg. Florida 33733 813-866 5151
n Mr. Samuel J. Chilk 3F-0283-09 [ Page 2 FPC is contfacting with an architect / engineering firm to perform studies and evaluations of the currently available inadequate core cooling (ICC) instrumentation systems. This includes the Westinghouse, Combustion Engineering, and Babcock and Wilcox subsystems. The studies will determine the best system for installation and use at Crystal River Unit 3 and will provide detailed schedules for engineering, procurement, and installation. In addition, the evaluations will review the status of conformance of each of the ICC instrumentation systems with NUREG-0737, item II.F.2. This work is presently estimated to take twenty-six (26) weeks from the date of work authorization. In addition, FPC will require approximately four (4) weeks for one internal review and decision process. The twenty-six weeks of work includes eight (8) weeks for each of three (3) reactor inventory tracking systems evaluations and sixteen (16) weeks for the core thermocouple and shutdown margin meter evaluations. The twenty-six (26) week schedule is necessary since all of this work cannot all be completed in parallel. Sincerely, -~ / G. R. Westafer Manager Nuclear Licensing and Fuel Management RMB:mm Mr. J. P. O'Reilly, Regional Administrator cc: Office of Inspection & Enforcement ~ .U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 3100 Atlanta, GA 30303 O
s O DISTRIBUTION FOR GREEN TICKET 12799 SECY 83-1471 (S. J. Chilk) ' Docket'F1'l'e 50-302" w/inc. NRC PDR~w/inc. L PDR w/inc. ORB #4 Rdg EDO Rdg HDenton / ECase PPAS TSpeis RMa ttson RVollmer HThompson g BSnyder \\- Grace OELD OCA-3 MBridgers ED0 12799_ Program Support Staff, NRR MJambor DNottingham DEisenhut JHel temes flFairtile w/inc. & ticket RIngram i Green Ticket File w/inc. & ticket ! JStolz / i OFFICE ) sunurn> ........ ~. - -.... ~ ~ ~. -. ~ ~ - ~~- - ~ ~ ~ ~ ~ ~ - "~~"""~"*""" ............. ~ ~ ...~.-. - ~ ~ ~~~~~-~~ - ~ ~ ~ ~ ~ ~ * ~ ~ ~ ~ " " " onny OFFIClAL RECORD COPY