RO 50-336/83-08:while in Mode 2 & Awaiting Steam Generator Chemistry Cleanup,Hydraulic Snubber on Turbine Extraction Steam Line Discovered Inoperable.During Feedwater Train Transfer,Temp Transient Caused Power Spike
ML20072R192
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/19/1983
From: Mroczka E
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
MP-4810, RD-830319, RO-50-336-83-08, RO-50-336-83-8, NUDOCS 8304050483
Download: ML20072R192 (1)


Text

' " " ' ""

  • 5' 'd *" 5 ""' 8" ""> C """" "'

NORTHEAST tmLMES

]

ZElcNCUr[7 NRTFORD. CONNECTICUT 06101 "ll: :::l'2l"2C"""

(2m) swsen L

L J :::::%C'2Ol00 March 19, 1983 MP-4810 Mr. Ponald C. Haynes, Regional Administrator Region 1, U. S. Nuclear Regulatory Conmission 631 Park Avenue King of Prussia, PA. 19406

Reference:

Facility Operating License No. DPR-65 Docket No. 50-336 Reportable Occurrence RO 50-336/83-08

Dear Mr. Haynes:

This letter provides notification of Reportable Occurrence 83-08, pursuant to the requirements of Millstone Unit 2 Appendix A Technical Specifications, Section 6.9.1.8.b.

This repo?. concerns operation of the unit with a limiting condition for operation in a less conservative condition than is established in Technical Specifications. The limiting condition for operation affected was under the Plant Systems section and changes in plant operating nodes were made while operating under Action Statement 3.7.8.1.

Specifically, Section 3.7.8.1 requires that all hydraulic snubbers listed in Table 3.7-1 be operable in Modes 1, 2, 3 and 4.

One hydraulic snubber on a turbine Extraction Steam line was inoperable. The plant was in Mode 2, 2.5%

reactor power, awaiting Steam Generator chemistry cleanup. To facilitate blowdown and cleanup requirements, the feedwater train was being transferred frm Auxiliary Feedwater to the Main Feedwater Pumps. During this transfer while feeding the Steam Generators, a tmperature transient caused a mmentary power spike. Reactor power went to 5.5% power and inmediately (within 2 minutes) returned to 2.5% power. Since 5.5% power signifies an entry into Mode 1 (greater than 5% power) while still operating under Action Statenent 3.7.8.1, a prmpt notification is being made pursuant to the requirements of Section 3.0.4.

The hydraulic snubber was returned to operable status 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> later.

Further information will be provided in the two week report.

Yours truly, NORTHEAST NGCLFAR ENERGY CmPANY r

. J. Mroczka Station Superintendent Millstone Nuclear Power Station EJM/JGR:no cc: Director, Office of Management and Program Control, Washington, D. D.

(3)

U. S. Nuclear Regulatory Cmmission, c/o Document Managment Branch, Washington, D. C.

20555 8304050483 830319 PDR ADOCK 05000336 S