ML20072P668

From kanterella
Jump to navigation Jump to search
Responds to NRC Ltr Re Violations Noted in IE Emergency Preparedness Appraisal Rept 50-285/82-27.Corrective Actions: Surveillance Test ST-RM-3 Re Instruments & Equipment,Revised to Indicate Locations of Emergency Equipment
ML20072P668
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/27/1982
From: William Jones
OMAHA PUBLIC POWER DISTRICT
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20072P657 List:
References
LIC-82-398, NUDOCS 8304040341
Download: ML20072P668 (1)


Text

,

Omaha Public Power District 1623 HARNEY a OMAHA, NEBRASMA 68102 e TELEPHONE 536-4000 AREA CODE 402 December 17, 1982 M

LIC-82-398 gg l

, f n

RB20B5!

Reactor Project Branch 2

]';

Mr. W. C. Seidle, Chief U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011

Reference:

Docket No. 50-285

Dear Mr. Seidle:

Emergency Preparedness Appraisal Followup Inspection During the week of November 8-12, 1982, an inspection team from your office conducted a followup inspection of the Fort Calhoun Station emergency preparedness program. During the exit on November 12, 1982, the one significant deficiency noted was related to an inconsistency in the performance of Surveillance Test ST-RM-3, " Emergency Plan Instruments and Equipment". There was an inconsistency regarding the actual location versus the location of equipment as listed in ST-RM-3.

For example, ST-RM-3 indicated that the emergency Jocker in the Emergency Operations Facility (EOF) included three self-contained breathing apparatuses (SCBA's) when, in fact, they were hung on the wall near the locker. As discussed by telephone between Mr. Montgomery of your staff and Mr.

Patterson of the District on November 29, 1982, ST-RM-3 has been revised i

to accurately reflect the actual locations of all emergency equipment.

Additionally, Table H-1 of the Radiological Emergency Response Plan (RERP) has also been revised to reflect these changes.

As requested by Mr. Montgomery, please find attached the revised ST-RM-3 (Revision 16)

/

and Table H-1 (Revision 1).

Sin

e. y,

l W. C. J les l

Divisi Manager Production Operations WCJ/TLP:jmm Attachments l

cc: LeBoeuf, Lamb, Leiby & MacRae Mr. J. L. Montgomery, NRC Emergency Preparedness Analyst l

Mr. E. G. Tourigny, NRC Project Manager Mr. L. A. Yandell, NRC Senior Resident Inspector l

l 8304040341 830330 PDR ADOCK 05000285 0

PDR