4 OPERATING DATA REPORT DOCKET NO. 50-364 DATE 1/06/83 COMPLETED BY W.G.Hairston III TELEPHONE (205)899-5155 OPERATING STATUS

1. Unit Name:

J seph M. Farley - Unit 2 Notes

2. Reporting Period:

December, 1982 1)-Cumulative data since

3. Licensed Thermal Power (MWt):

2652 7/30/81, date of

4. Nameplate Rating (Gross MWe):

860 commercial operation.

829

5. Design Electrical Rating (Net MWe):

854.7

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

813.7

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report. Give Reasons:

N/A

9. Power Level To Which Restricted,if Any (Net MWe):

N/A

'~

10. Reasons For Restrictions,if Any:

N/A This Month Yr.-to-Date Cu[nulatise 744 8,760 12,481

11. Hours in Reporting Period
12. Number Of flours Reactor Was Critical 739.7 7,098.3 10,784.5
13. Reactor Reserve Shutdown Hours 0

97.6 138.4

14. Hours Generator On-Line 681.7 6,935.9 10.602.4
15. Unit Resene Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 1.572.848 17.528.505 25.421,814 l
17. Gross Electrical Energy Generated (MWH) 499,308 5,601,856 8,673,234
18. Net Electrical Energy Generated (MWH) 470.180 5.295.330 1 216.050
19. Unit Senice Factor 91.6 79.2 84.9
20. Unit Availability Factor 91.6 79.2 84.9
21. Unit Capacity Factor (Using MDC Net)
77.7 74.3 80.9
22. Unit Capacity Factor (Using DER Net) 76.2 72.9 79.4
23. Unit Forced Outage Rate 0.0 10.6 7.7
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Eacht:

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed INITI A L CRITICALITY 5/06/81 5/06/81 5 24/81 5/25/81 j

INITIA L ELECTRICITY COMMERCIAL OPERATION 8/01/81 7/30/81

(

h KO PDR

, 7

..g.

m

._,_.m:,,...,__

DOC)2T NO.

50-364 UNIT 2

dan 1/06/83 o

C05fPLETED'BY W.G.Hairston, III TELEPl!ONE (205) 899-5156 510NTl!

December DAY AVERACE DAILY l'0WER LEVEL DAY' AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe-Net) 0 17 818 I,

0 13 811 2

90 816 3

19 171 816 4

20 178 21 818 3

  • 6 318 n

816 541 813 g

640 803 g

24 9

25 802~

609 213 26 784 10 11 677 27 804 816 805 g2 a

13 29 816 815 i

g4 30 l

I5 813 3g 814 818 l

16 l

INSTRUCTIONS l

On this fonn::. list the average daily unit power levelin MWe Net for each day in the reporting inonth. Compute to

, the nease:t whole nr;2 wait.

(9(77)

O C

~~

'2~.

w UNIT SilUTDOWNS AND POWER REDUC 110NS DOCKET NO. 50-364 UNIT NAME 3.M.Fnrlev - Upit 2 DATE 1/06/83 i

REPORT MONTil December COMPLETED BY W.G.Hairston,J{II TELEPl10NE (205) 899-5156, r.

-g e

c.

3w=

3, g

9gg Licensee 5%

g4 Cause & Currective

~

g No-Dai*

E.x 2=

2

.E g x Event u?

q Action.to

$E 5

j g5 g Report #

yu 50 Prcvent Recurrence 6

l 013 821201 S

53.9 C

1 NA NA NA Unit outage continued from 11/30/82 for refueling.

014 821210 S

8.4 B

NA NA NA NA Unit taken off line for the perfor-mance of the turbine overspeed trip i

test.

1 I

I l

1 1

1 2

3 4

F: Forced Reason:

Method:

Exhibit G Instructions S: Sslieduled A. Equipment Failure (Explain) 1 -Manual for Preparation of Data B. Maintenance of Test 2 Manual Scram.

Entry Sheets for 1.icensee C Refueling 3 Automatic Scram.

Event ReporI (l_ER) File INUREG-D.Regulatony Resisiction 4-Other (Explain) 0161)

E Operator Training & IJcense Examination F Adininisisative 5

G Opesational I nur (12.xplain) thtubii 1 Same Source 19/1/)

11 Olhes (l:xplain)

9 JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS DECEMBER, 1982 The Cycle I - Cycle II Refueling Outage continued into the month of December. The unit was shutdown on December 10, 1982 for the performance of the turbine overspeed trip test.

1 The following safety-related maintenance was performed in the month of December:

1.

Performed miscellaneous maintenance on diesel generators.

2.

Adjusted valve pressure setting on Power Operated Relief Valve PCV444B.

3.

Repacked #7 River Water Pump.

h i

4 OPERATING DATA REPORT DOCKET NO. 50-364 DATE 1/06/83 COMFLETED BY W.G.Hairston III TELEPHONE (205)S99-5155 OPERATING STATUS J seph M. Farley - Unit 2 Notes

1. Unit Name:
2. Reporting Period:

December. 1982

1) Cumulative data since
3. Licensed Thermal Power (MWt):

2652 7/30/81, date of

4. Nameplate Rating (Gross MWe):

860 commercial operation.

5. Design Electrical Rating (Net MWe):

829 854.7

6. Maximum Dependable Capacity (Gross MWe):

813.7

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power Level To Which Restricted. If Any (Net MWe):

N/A

10. Reasons For Restrictions. lf Any:

N/A This Month Yr..to-Date "Cun.ulative 744 8,760 12,481

11. Hours in Reportmg Period
12. Number Of Hours Reactor Was Critical 739.7 7,098.3 10,784.5
13. Reactor Resene Shutdown Hours 0

97.6 138.4

14. Hours Generator On.Line 681.7 6.935.9 10.602.4
15. Unit Resene Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 1.572.848

_17.528.505 25.421.814

17. Gross Electrical Energy Generated (MWH) 499.308__,_,

5.601,856 8.673,234

18. Net Electrical Energy Generated (MWH) 470.180 5.295.330 8.216.050
19. Unit Service Factor 91.6 79.2 84.9
20. Unit Availability Factor 91.6 79.2 84.9
21. Unit Capacity Factor (Using MDC Net)
77.7 74.3 80.9
22. Unit Capacity Factor (Using DER Net) 76.2 72.9 79.4
23. Unit Forced Outage Rate 0.0 10.6 7.7
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date,and Duration of Each):

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed INITIA L CRITICALITY 5/06/81 5/08/81 INITIAL ELECTRICITY 5/24/81 5/25/81 COMMER CI AL OPERATION 8/01/81 7/30/81 (4/77)

4.

-m.

... ~

~.,...,

DOCKET NO.

50-364

~

1

-4, UNIT 2

I DAR 1/06/83 C05fPLETED BY W.G.Hairston. III

(

TELEPl!ONE (205) 899-5156 310fGli December DAY AVERAGE DAILY I'0WER LEVEL DAY AVERAGE DAILY POWER LEVEL (51We Net)

(5fWe-Net) 0 17 818 I,

0 18 811 2

816 94 39 3

816 171 20 4'

178 818 3

21 816 318 22 o-6 541 813 7

g 640 803 g

24 802' 609' 25-

[

9 784 213 26 10 804 677 27 33 816 805 12 23 13 29 816 815 g4 30 Is 813 33 814 i

y OIO 16 INSTRUCDONS On this formar. list the avenge daily unit power lesc!in MWe Net for esch d:y in the reporttng month. Compute to

, the nearest whole negswatt.

(9(77)

(

r

.., n.

r. ~,

m

o DOCKET NO. SG-364 UNIT SiluTDOWNS AND POWER REDUCHONS UNITNAME 3.M.Fnrlev - Unit 2 DATE 1/06/83 COMPl.ETED tlY' W.G.Hairston,III REPORT MON fil December TELEPilONE (205) 899-5156 We E

E

.! ?

'k j _E i Licensee

,Ev,

{t Cause & Corredive Nie.

Date g

3g 2g&

Event y

[3 a-Action to yE 5

j gg g Report #

Prcvent Recurrence H

u) U 6

013 821201 S

53.9 C

1 NA NA NA Unit outage continued from 11/30/82 for refueling.

014 821210 S

8.4 B

NA NA NA NA Unit taken off line for the perfor-mance of the turbine overspeed trip t

test.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G. instructions S: Scheduled A-Fquipment Failure (Explain) 1 Manual for Preparation of Data ll Maintenance of Test 2 Mannat Scrain.

Entry Sheets for I.icensee C Refuchng 3 Autunutic Scram.

Event Repost (l.ER) File (NUREG-D Regulatory Resitiction 4-Other (Explain) 0161i E-Operator Tr.aining & license Examination F Admimstusive 5

G Opce.aisonal I :sur (lingil.im) thinlais 1 Same Source 19/11) ll Othes 11 at lain)