4 OPERATING DATA REPORT DOCKET NO. 50-364 DATE 1/06/83 COMPLETED BY W.G.Hairston III TELEPHONE (205)899-5155 OPERATING STATUS
- 1. Unit Name:
J seph M. Farley - Unit 2 Notes
- 2. Reporting Period:
December, 1982 1)-Cumulative data since
- 3. Licensed Thermal Power (MWt):
2652 7/30/81, date of
- 4. Nameplate Rating (Gross MWe):
860 commercial operation.
829
- 5. Design Electrical Rating (Net MWe):
854.7
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
813.7
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report. Give Reasons:
N/A
- 9. Power Level To Which Restricted,if Any (Net MWe):
N/A
'~
- 10. Reasons For Restrictions,if Any:
N/A This Month Yr.-to-Date Cu[nulatise 744 8,760 12,481
- 11. Hours in Reporting Period
- 12. Number Of flours Reactor Was Critical 739.7 7,098.3 10,784.5
- 13. Reactor Reserve Shutdown Hours 0
97.6 138.4
- 14. Hours Generator On-Line 681.7 6,935.9 10.602.4
- 15. Unit Resene Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 1.572.848 17.528.505 25.421,814 l
- 17. Gross Electrical Energy Generated (MWH) 499,308 5,601,856 8,673,234
- 18. Net Electrical Energy Generated (MWH) 470.180 5.295.330 1 216.050
- 19. Unit Senice Factor 91.6 79.2 84.9
- 20. Unit Availability Factor 91.6 79.2 84.9
- 21. Unit Capacity Factor (Using MDC Net)
- 77.7 74.3 80.9
- 22. Unit Capacity Factor (Using DER Net) 76.2 72.9 79.4
- 23. Unit Forced Outage Rate 0.0 10.6 7.7
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Eacht:
N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITI A L CRITICALITY 5/06/81 5/06/81 5 24/81 5/25/81 j
INITIA L ELECTRICITY COMMERCIAL OPERATION 8/01/81 7/30/81
(
h KO PDR
, 7
..g.
m
._,_.m:,,...,__
DOC)2T NO.
50-364 UNIT 2
dan 1/06/83 o
C05fPLETED'BY W.G.Hairston, III TELEPl!ONE (205) 899-5156 510NTl!
December DAY AVERACE DAILY l'0WER LEVEL DAY' AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe-Net) 0 17 818 I,
0 13 811 2
90 816 3
19 171 816 4
20 178 21 818 3
- 6 318 n
816 541 813 g
640 803 g
24 9
25 802~
609 213 26 784 10 11 677 27 804 816 805 g2 a
13 29 816 815 i
g4 30 l
I5 813 3g 814 818 l
16 l
INSTRUCTIONS l
On this fonn::. list the average daily unit power levelin MWe Net for each day in the reporting inonth. Compute to
, the nease:t whole nr;2 wait.
(9(77)
O C
~~
'2~.
w UNIT SilUTDOWNS AND POWER REDUC 110NS DOCKET NO. 50-364 UNIT NAME 3.M.Fnrlev - Upit 2 DATE 1/06/83 i
REPORT MONTil December COMPLETED BY W.G.Hairston,J{II TELEPl10NE (205) 899-5156, r.
-g e
c.
3w=
3, g
9gg Licensee 5%
g4 Cause & Currective
~
g No-Dai*
E.x 2=
2
.E g x Event u?
q Action.to
$E 5
j g5 g Report #
yu 50 Prcvent Recurrence 6
l 013 821201 S
53.9 C
1 NA NA NA Unit outage continued from 11/30/82 for refueling.
014 821210 S
8.4 B
NA NA NA NA Unit taken off line for the perfor-mance of the turbine overspeed trip i
test.
1 I
I l
1 1
1 2
3 4
F: Forced Reason:
Method:
Exhibit G Instructions S: Sslieduled A. Equipment Failure (Explain) 1 -Manual for Preparation of Data B. Maintenance of Test 2 Manual Scram.
Entry Sheets for 1.icensee C Refueling 3 Automatic Scram.
Event ReporI (l_ER) File INUREG-D.Regulatony Resisiction 4-Other (Explain) 0161)
E Operator Training & IJcense Examination F Adininisisative 5
G Opesational I nur (12.xplain) thtubii 1 Same Source 19/1/)
11 Olhes (l:xplain)
9 JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE
SUMMARY
OF OPERATIONS DECEMBER, 1982 The Cycle I - Cycle II Refueling Outage continued into the month of December. The unit was shutdown on December 10, 1982 for the performance of the turbine overspeed trip test.
1 The following safety-related maintenance was performed in the month of December:
1.
Performed miscellaneous maintenance on diesel generators.
2.
Adjusted valve pressure setting on Power Operated Relief Valve PCV444B.
3.
Repacked #7 River Water Pump.
h i
4 OPERATING DATA REPORT DOCKET NO. 50-364 DATE 1/06/83 COMFLETED BY W.G.Hairston III TELEPHONE (205)S99-5155 OPERATING STATUS J seph M. Farley - Unit 2 Notes
- 1. Unit Name:
- 2. Reporting Period:
December. 1982
- 1) Cumulative data since
- 3. Licensed Thermal Power (MWt):
2652 7/30/81, date of
- 4. Nameplate Rating (Gross MWe):
860 commercial operation.
- 5. Design Electrical Rating (Net MWe):
829 854.7
- 6. Maximum Dependable Capacity (Gross MWe):
813.7
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Level To Which Restricted. If Any (Net MWe):
N/A
- 10. Reasons For Restrictions. lf Any:
N/A This Month Yr..to-Date "Cun.ulative 744 8,760 12,481
- 11. Hours in Reportmg Period
- 12. Number Of Hours Reactor Was Critical 739.7 7,098.3 10,784.5
- 13. Reactor Resene Shutdown Hours 0
97.6 138.4
- 14. Hours Generator On.Line 681.7 6.935.9 10.602.4
- 15. Unit Resene Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 1.572.848
_17.528.505 25.421.814
- 17. Gross Electrical Energy Generated (MWH) 499.308__,_,
5.601,856 8.673,234
- 18. Net Electrical Energy Generated (MWH) 470.180 5.295.330 8.216.050
- 19. Unit Service Factor 91.6 79.2 84.9
- 20. Unit Availability Factor 91.6 79.2 84.9
- 21. Unit Capacity Factor (Using MDC Net)
- 77.7 74.3 80.9
- 22. Unit Capacity Factor (Using DER Net) 76.2 72.9 79.4
- 23. Unit Forced Outage Rate 0.0 10.6 7.7
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date,and Duration of Each):
N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIA L CRITICALITY 5/06/81 5/08/81 INITIAL ELECTRICITY 5/24/81 5/25/81 COMMER CI AL OPERATION 8/01/81 7/30/81 (4/77)
4.
-m.
... ~
~.,...,
DOCKET NO.
50-364
~
1
-4, UNIT 2
I DAR 1/06/83 C05fPLETED BY W.G.Hairston. III
(
TELEPl!ONE (205) 899-5156 310fGli December DAY AVERAGE DAILY I'0WER LEVEL DAY AVERAGE DAILY POWER LEVEL (51We Net)
(5fWe-Net) 0 17 818 I,
0 18 811 2
816 94 39 3
816 171 20 4'
178 818 3
21 816 318 22 o-6 541 813 7
g 640 803 g
24 802' 609' 25-
[
9 784 213 26 10 804 677 27 33 816 805 12 23 13 29 816 815 g4 30 Is 813 33 814 i
y OIO 16 INSTRUCDONS On this formar. list the avenge daily unit power lesc!in MWe Net for esch d:y in the reporttng month. Compute to
, the nearest whole negswatt.
(9(77)
(
r
.., n.
- r. ~,
m
o DOCKET NO. SG-364 UNIT SiluTDOWNS AND POWER REDUCHONS UNITNAME 3.M.Fnrlev - Unit 2 DATE 1/06/83 COMPl.ETED tlY' W.G.Hairston,III REPORT MON fil December TELEPilONE (205) 899-5156 We E
E
.! ?
'k j _E i Licensee
,Ev,
{t Cause & Corredive Nie.
Date g
3g 2g&
Event y
[3 a-Action to yE 5
j gg g Report #
Prcvent Recurrence H
u) U 6
013 821201 S
53.9 C
1 NA NA NA Unit outage continued from 11/30/82 for refueling.
014 821210 S
8.4 B
NA NA NA NA Unit taken off line for the perfor-mance of the turbine overspeed trip t
test.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G. instructions S: Scheduled A-Fquipment Failure (Explain) 1 Manual for Preparation of Data ll Maintenance of Test 2 Mannat Scrain.
Entry Sheets for I.icensee C Refuchng 3 Autunutic Scram.
Event Repost (l.ER) File (NUREG-D Regulatory Resitiction 4-Other (Explain) 0161i E-Operator Tr.aining & license Examination F Admimstusive 5
G Opce.aisonal I :sur (lingil.im) thinlais 1 Same Source 19/11) ll Othes 11 at lain)