ML20070M867

From kanterella
Jump to navigation Jump to search
Advises That Util Does Not Utilize Bunker-Ramo Electrical Penetrations,Per IE Bulletin 82-04, Deficiencies in Primary Containment Electrical Penetration Assemblies. Future Use Will Be Subj to Appropriate Procurement Controls
ML20070M867
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/07/1983
From: Westafer G
FLORIDA POWER CORP.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-SSINS-6820 3F-0183-02, 3F-183-2, IEB-82-04, IEB-82-4, NUDOCS 8301250359
Download: ML20070M867 (1)


Text

--

J3JAri10 1

10 Power C O R P 0 9 A F s O 8e January 7,1983 3F-0183-02 Mr. James P. O'Reilly Regional Administrator, Region II U.S. Nuclear Regulatory Commission Office of Inspection & Enforcement 101 Marietta Street N.W., Suite 3100 Atlanta, GA 30303

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 IE Bulletin No. 32-04:

Deficiencies in Primary Containment Electrical Penetration Assemblies

Dear Mr. O'Reilly:

Florida Power Corporation does not currently utilize Bunker Ramo electrical penetrations.

Future potential use of these penetrations will be subject to appropriate procurement controls.

Sincer ly, o

G. R. Westafer Manager Nuclear Licensing and Fuel Management PGH/mm cc:

Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 8301250359 830107 PDR ADOCK 05000302 G

PDR ZG3I i

General Office 3201 Tnitty-fourtn street souin. P O. Box t 4042, St. Petersburg. Florida 33733 813-866-5151

\\'