k GE Nuclear Energy
.+.-a
~.. -. - - - - - - - - - ~ - - - - - - - - ~ - - - - - - ~ ~ ~ * - ~ ~ - ~ > ~ ~ - - ~ - * - ~ - - ~ ' - " - - - ' ' - ^ ' ~ ~ ' - ~ ' ~ ~ ~ ' ' ' ~ ' ' ' '
~
{},- 4 v'[.,
, [ nt'y.y3
'llI (^f;f' t ! AyC:t fofi lG'(* ('!4 9')!s #
June 15,1994 MFN No. 084-94 Docket STN 52-004 Documcat Control Desk U.S. Nuclear Regulatory Commission Washington DC 20555 Attention:
Richard W. llorchardt, Director Standardization Project Directorate
Subject:
RAls in Process at GE
Reference:
MFN No. 080-94, P. W. Marriott to R. W. Ilorchardt, Realignment of SilWR Certification Program, June 7,1994 A comparison of GE's list of RAls received against the NRC Project Manager's list of RAls sent to GE has been completed and indicates agreement between the two lists. As a result of this comparison, Attachment I to the reference letter has been revised and this revision is attached to this letter. If you have any questions or comments regarding this list, please contactJohn Leatherman at (408) 9242023.
Sincerely, j P W. Marriott, Manager
}4 Advanced Plant Technologies Enclosure cc:
D. M. Crutchfield, Associate Director for Advanced Reactors and License Renewal (NRC) (w/1 copy of Attachment 1)
M. Malloy, Prqject Manager (NRC) (w/2 copics of Attachment 1)
F. W.11asselberg, Project Manager (NRC) (w/l copy of Attachment 1)
R. W. Ilurke (EPRI)
S. M. Franks (DOE) i R. P. Mcdonald (ARC)
D. R. Wilkins (GE)
WOO g3 h
I 74R62RSER M%6Bo4 A
NITAClIMENT 1 to MFN No. 080 94 DISPOSITION OF RAls IN-PROCESS AT CE RAI No.
DISPOSrflON* COMMENTS 950.41 Y
R A M O N A-411 471.32 Y
RADIOLOGICAI. IMPACTS 471.32 Y
RADIOLOGICAL IMPACIS 471.33 Y
RAD 10 LOGICAL 1MPACTS 471.31 Y
RADIOLOGICAL IMPACTS 471.35 N
RADIO! OGICAL IMPACTS 471.36 N
RADIOL.OGICAl. IMPACTS 471.37 Y
RADIOLOGICAL IMPACTS 471.38 Y
RADIOLOGICAL IMPACTS 171.01 Y
RADIATION PROTECTION 471.02 Y
RADIATION PROTECTION 471.03 Y
RADIATION PROTECTION 471.01 Y
RADIATION PROTECTION 471.05 Y
RADIATION PROTECTION 471.06 Y
RADIATION PROTECTION 471.07 Y
RADIATION PROTECTION 471.08 N
RADIATION PROTECTION 471.09 Y
RADIATION PROTECTION 471.10 Y
RADIATION PROTECTION 471.11 Y
RADIATION PROTECTION 471.12 Y
RADIATION PROTECTION 471.13 N
RADIATION PROTECTION 471.14 Y
RADIATION PROTECTION 471.15 Y
RADIATION PROTECTION 471.16 N
RADIATION PROTECTION 471.17 N
RADIATION PROTECTION 471.18 N
RADIATION PROTECTION 471.19 Y
RADIATION PROTECTION 471.20 Y
RADIATION PROTECTION 471.21 Y
RADIATION PROTECTION 471.22 Y
RADIATION PROIT.CTION 471.23 Y
RADIATION PROTECTION 471.24 Y
RADIATION PROTECTION 471.25 Y
RADIATION PROTECTION 471.26 Y
RADIATION PROTECTION 471.27 Y
RADIATION PROTECTION
+
471.28 Y
RADIATION PROTECTION 471.29 Y
RADIATION PROTECTION 471.30 Y
RADIATION PROTECTION 470.33 N
RADIOLOGICAL. IMPACTS 470.26 N
RADIOL.OGICAL IMPACTS 470.04 N
RADIOL.OGICAL IMPACTS 900.30 Y
PANTiiERS TRACG INPUT DECK 900.35 Y
PRE-TEST cal.CS FOR PANTilERS 470.34 Y
RADIGI.OGICA1 IMPACTS 900.42 Y
PANDA TEST SPECIFICATIONS 900.62 Y
VACUUM liREAKER TESTING
- Y - Complete the work and submit response to NRC N - Discontinue work until design review is resumed 1
06/14/94
4 Disposition of RAls In process at GE (Continued)
IMI Nw DISPOSITION
- COMMENTS t
PS4.01 Y
PURDUE CONFIRMATORY TESTS PS4.02 Y
PURDUE CONFIRMATORY TESTS PS4.03 Y
PURDUE CONFIRMATORY TESTS PSI.01 Y
PURDUE CONFIRMATORY TESTS PS4.05 Y
PURDUE CONFIRMATORY TESTS PS1.06 Y
PURDUE CONFIRMATORY TESTS PS4.07 Y
PURDUE CONFIRMATORY TESTS PS4.08 Y
PURDUE CONFIRMATORY TESTS PS t.09 Y
PURDUE CONFIRMATORY TESTS PSI.10 Y
PURDUE CONFIRMATORY TESTS PS4.1 I Y
PURDUE CONFIRMATORY TESTS PS4.12 Y
PURDUE CONFIRMATORY TESTS PS4.13 Y
PURDUE CONFIRMATORY TESTS PS4.14 Y
PURDUE CONFIRMATORY TESTS PS4.15 Y
PURDUE CONFIRMATORY TESTS PS4.16 Y
PURDUE CONFIRMATORY TESTS PS4.17 Y
PURDUE CONFIRMATORY TESTS PS4.18 Y
PURDUE CONFIRMATORY TESTS PS4.19 Y
PURDUE CONFIRMATORY TESTS PS4.20 Y
PURDUE CONFIRMATORY TESTS PS4.21 Y
PURDUE CONFIRMATORY TESTS PS4.22 Y
PURDUE CONFIRMATORY TESTS 260.I Y
QA 260.2 Y
QA 260.3 Y
QA 260.4 Y
QA 260.5 Y
QA 260.6 Y
QA 260.7 Y
QA 260.8 Y
QA 220.1 N
CIVIL / STRUCTURAL 220.2 N
civil./ STRUCTURAL 220.3 N
CIVIL / STRUCTURAL 220.4 N
CIVIL / STRUCTURAL.
220.5 N
CIVII./ STRUCTURAL "20.6 N
CIVIL / STRUCTURAL 220.7 N
CIVIL / STRUCTURAL 220.8 N
CIVIL / STRUCTURAL 220.9 N
CIVIL / STRUCTURAL.
220.10 N
CIVIL / STRUCTURAL
- 1* - Compkte the work and submit response to NRC N ~ Discontinue work until dnign review is roumed 2
06/14/94
Disposition of RAIs In-process at GE (Continued)
)
RAI No, DISPOSITION
- COMMENTS N
220.11 N
CIVIL / STRUCTURAL 220.12 N
CIVIL / STRUCTURAL 220.13 N
CIVII./ STRUCTURAL 220,14 N
CIVIL / STRUCTURAL 220.15 N
CIVIL / STRUCTURAL l
220.16 N
CIV11,/ STRUCTURAL 220.17 N
CIVIL / STRUCTURAL 220.18 N
CIVIL / STRUCTURAL 220.19 N
CIVIL / STRUCTURAL 220.20 N
CIVII./ STRUCTURAL 220.21 N
civil./ STRUCTURAL 220.22 N
CIVIL / STRUCTURAL 220.23 N
CIVIL / STRUCTURAL 220.24 N
CIVIL / STRUCTURAL 220.25 N
civil./ STRUCTURAL i
220.26 N
CIVIL /STRUC IURAL 220.27 N
CIVIL / STRUCTURAL 220.28 N
CIVIL / STRUCTURAL 220.29 N
CIVIL / STRUCTURAL 220.30 N
CIVIL / STRUCTURAL 220.31 N
CIVIL / STRUCTURAL 220.32 N
CIVIL / STRUCTURAL 220.33 N
CIVIL / STRUCTURAL 220.34 N
civil./ STRUCTURAL 220.35 N
CIVIL / STRUCTURAL 220.36 N
CIVIL / STRUCTURAL 220.37 N
CIVIL / STRUCTURAL 220.38 N
CIVIL / STRUCTURAL 220.39 N
CIV1L/ STRUCTURAL 220.40 N
CIVIL / STRUCTURAL 220.41 N
CIVIL / STRUCTURAL 220.42 N
CIVIL / STRUCTURAL 220.43 N
civil / STRUCTURAL 220.44 N
CIVIL / STRUCTURAL 220.45 N
CIVIL / STRUCTURAL 220.46 N
CIVIL / STRUCTURAL 220.47 N
CIV11,/ STRUCTURAL 220.48 N
CIVIL / STRUCTURAL 220.49 N
civil./ STRUCTURAL 220.50 N
CIVIL / STRUCTURAL 220.51 N
CIVIL / STRUCTURAL 220.52 N
CIVIL / STRUCTURAL.
220.53 N
CIVIL / STRUCTURAL 220.54 N
CIVIL / STRUCTURAL 220.53 N
civil./ STRUCTURAL 220.56 N
CIVIL / STRUCTURAL.
220.57 N
CIVIL / STRUCTURAL
'Y - Complete the work and submit response to NRC N - Discontinue work until dnign review is resumed 3
06/14/94
Disposition of RAls In-process at GC (Centinued) 101 No.
DISPOSrrlON' COMMENTjS 435.1 N
El.ECl RIC POWER SYSTEMS 435.2 N
El.ECTRIC POWER SYSTEMS 4313 N
El.ECTRIC POWER SYSTEMS 435.4 N
ELECTRIC POWER SYSTEMS 435.5 N
El.ECTRIC POWER SYSTEMS 435.6 N
El.ECTRIC POWER SYSTEMS 435.7 N
El.ECTRIC POWER SYSTEMS 435.8 N
El.ECTRIC POWER SYSTEMS 435.9 N
ELECTRIC POWER SYSTEMS 435.10 N
El.ECTRIC POWER SYSTEMS 435.11 N
El.ECTRIC POWER SYSTEMS 435.12 N
El.ECl RIC POWER SYSTEMS 435.13 N
El.ECTRIC POWER SYSTEMS 435.14 N
El.ECTRIC POWER SYSTEMS 435.15 N
ELECTRIC POWER SYSTEMS 435.16 N
El ECTRIC POWER SYSTEMS 435.17 N
El.ECTRIC POWER SYSTEMS 435.18 N
El ECTRIC POWER SYSTEMS 435.19 N
El.ECTRIC POWER SYSTEMS 435.20 N
El.ECTRIC POWER SYSTEMS 435.21 N
El.ECTRIC POWER SYSTEMS 435.22 N
El.ECTRIC POWER SYSTEMS 435.23 N
ELECTRIC POWF't SYSTEMS 435.21 N
ELECTRIC POWER SYSTEMS 435.25 N
El.ECTRIC POWER SYSTEMS 435.26 N
ELECTRIC POWER SYSTEMS 435.27 N
El.ECTRIC POWER SYSTEMS 435.28 N
ELECTRIC POWER SYSTEMS 435.29 N
El.ECTRIC POWER SYSTEMS 435.30 N
El.ECTRIC POWER SYSTEMS 435.31 N
El.ECTRIC POWER SYSTEMS 435.32 N
El ECTRIC POWER SYSTEMS 435.33 N
ELECTRIC POWER SYSTEMS 435.31 N
ELECTRIC POWER SYSTEMS 435.35 N
ELECTRIC POWER SYSTEMS 435.36 N
ELECTRIC POWER SYSTEMS 435.37 N
El.ECTRIC POWER SYSTEMS 435.38 N
ELECTRIC POWER SYSTEMS 435.39 N
El.ECTRIC POWER SYSTEMS 435.40 N
ELECTRIC POWER SYSTEMS 435.41 N
El.ECTRIC POWER SYSIEMS 435.42 N
ELEUIRIC POWER SYSTEMS 435.43 N
El.ECTRIC POWER SYSTEMS 435.44 N
El.ECTRIC POWER SYSTEMS 435.45 N
ELECTRIC POWER SYSTEMS
- Y - Complete the work and submit rnponse to NRC N - lbscontinue work until dnip review is resumed 4
06/14/94
Disposition of RAIs In-process at GE (Continued)
RAI No.
DISPOSITION
- COMMENTS 435.46 N
ELEC1RIC POWER SYSTEMS 1
435.47 N
ELECTRIC POWER SWrEMS 435.48 N
El.ECTRIC POWER SYSTEMS 435.49 N
El.ECTRIC POWER SYSTEMS 435.50 N
ELECTRIC POWER SYSTEMS 435.51 N
ELECTRIC POWER SYSTEMS 435.52 N
ELECTRIC POWER SYSTEMS 435.53 N
El ECTRIC POWER SYSTEMS 435.54 N
ELECTRIC POWER SYSTEMS 435.55 N
El.ECTRIC POWER SYSTEMS 435.56 N
ELECTRIC POWER SYSTEMS 435.57 N
ELECTRIC POWER SYSTEMS 435.58 N
ELECTRIC POWER SYSTEMS 435.69 N
ELECTRIC POWER SYSTEMS 435.70 N
ELECTRIC POWER SYSTEMS 435.71 N
ELECTRIC POWER SYSTEMS 435.72 N
El.ECTRIC POWER SYSTEMS 435.73 N
ELECTRIC POWER SYSTEMS 435.74 N
ELECTRIC POWER SYSTEMS 435.75 N
ELFCTRIC POWER SYSTEMS 435.76 N
El.ECTRIC POWER SYSTEMS 435.77 N
ELECTRIC POWER SYSTEMS 435.78 N
El.ECTRIC POWER SYSTEMS 435.79 N
1:1.ECTRIC POWER SYSTEMS 435.80 N
El.ECTRIC POWER SYS'IY.MS 435.81 N
El.ECTRIC POWER SYSTEMS 435.82 N
ELECTRIC POWER SYSTEMS 435.83 N
El.ECTRIC POWER SYSTEMS 435.84 N
El.ECTRIC POWER SYSTEMS 435.85 N
El.ECTRIC POWER SYSTEMS 435.86 N
El.ECTRIC POWER SYSTEMS 435.87 N
El.ECTRIC POWER SYSTEMS 435.88 N
ELECTRIC POWER SYSTEMS 435.89 N
El.ECTRIC POWER SYSTEMS 435.90 N
El.ECTRIC POWER SYSTEMS 435.91 N
El.ECTRIC POWER SYSTEMS 435.92 N
El.ECTRIC POWER SWrEMS 435.93 N
ELECTRIC POWER SYSTEMS 435.94 N
ELECTRIC POWER SYSTEMS 435.95 N
El.ECTRIC POWER SWFEMS l
435.96 N
ELECTRIC POWER SYSTEMS 435.97 N
El.ECTRIC POWER SYSTEMS 435.98 N
El.ECTRIC POWER SWrEMS 435.99 N
ELECTRIC POWER SYSTEMS
- Y - Complete the work and submit response to NRC N - Discontinue work until design review is resumed 5
06/14/94
\\
Disposition of RAls In-process at GE (Continued)
]MI No, DISPOSITION
- COMMENTS 435.100 N
ELECTRIC POWER SYSTEMS 435.101 N
El.ECTRIC POWER SYSTEMS 435.102 N
El.ECTRIC POWER SYSTEMS 435.103 N
El.ECTRIC POWER SYSTEMS 435.101 N
El.ECTRIC POWER SYSTEMS 435.105 N
El.ECTRIC POWER SYSTEMS 435.106 N
ELECTRIC POWER SYSTEMS 435.107 N
ELECTRIC POWER SYSTEMS 435.108 N
ELECTRIC POWER SYSTEMS 920.1 N
SAFEGUARDS INFORMATION 920.2 N
SAFEGUARDS INFORMATION 950.44 Y
UNIVERSI'iY CONDENSATION TESTS 950.45 Y
UNIVERSrlY CONDENSATION TESTS 950A6 Y
UNIVERS!!Y CONDENSATION TESTS 950.47 Y
UNIVERSi~fY CONDENSATION TESTS 950.48 Y
UNIVERSI'lY CONDENSATION TESTS 900.30 Y
PANTilERS TRACG INPUT DECK-TRANSIENT 810.1 N
EMERGENCY PREPAREDNESS 810.2 N
EMERGENCY PREPAREDNESS 252.1 N
MATERIAIS APPL.ICATION 252.2 N
MATERIAIS APPLICATION 252.3 N
MATERIAIS APPI.ICATION 252.4 N
MATERIALS APPI ICATION 252.5 N
MATERIAL.S APPLICATION 252.6 N
MATERIALS APPL.ICATION 252.7 N
MATERIAL.S APPLICNIION 252.8 N
MATERIAIS APPL.ICATION 252.9 N
MATERIALS APPLICATION 252.10 N
MATERIAL.S APPLICATION 252.11 N
MATERIAIS APPLICATION 281.1 N
CIIEMICAL TECllNOI.OGY 281.2 N
CIIEMICA1. TECllNOLOGY 281.3 N
CllEMICAL TECilNOI.OGY 28tA N
ClIEMICAI. TECllNOI.OGY 281.5 N
CIIEMICAl. TECllNOI.OGY 271.1 N
SEISMIC QUAL.lFICATION & IN SERVICE TESTING 271.2 N
SEISMIC QUALIFICATION & IN-SERVICE TESTING 271.3 N
SEISMIC QUALIFICATION & IN-SERVICE TESTING 271.4 N
SEISMIC QUAL.lFICATION & IN-SERVICE TESTING 27L5 N
SEISMIC QUALIFICATION & IN-SERVICE TESTING 271.6 N
SEISMIC QUAL.lFICATION & IN-SERVICE TESTING 271.7 N
SEISMIC QUALIFICATION & IN-SERVICE TESTING 271.8 N
SEISMIC QUAI.IFICATION & IN-SERVICE TESTING 271.9 N
SEISMIC QUAI.!FICATION & IN-SERVICE TESTING 271.10 N
SEISMIC QUALIFICATION & IN-SERVICE TESTING 271.11 N
SEISMIC QUAL.IFICATION & IN-SERVICE TESTING 271.12 N
SEISMIC QUALIFICATION & IN-SERVICE TESTING
- Y = Complete the work and submit response to NRC N - Discontinue work until desipt review is resumed 1
6 06/14/94
Disposition of RAls In-process at GE (Continued)
IMJ No.
DISPOSITION
- COh!51ENTS 440.6 Y
ISOI.ATION CONI)ENSER 900.63 Y
ATLAS FUEL FACIIJIY 900fri Y
ATLAS FUEL. FACIIJ1Y 901.1 Y
TRACG 901.2 Y
TRACG 901.3 Y
TRACG 901.4 Y
TRACG 901.5 Y
TRACG 901.6 Y
TRACG 901.7 Y
TRACG 901.8 Y
TRACG 901.9 Y
TRACG 901.10 Y
TRACG 901.1I Y
TRACG 901.12 Y
TRACG 901.13 Y
TRACG 901.14 Y
TRACG 901.15 Y
TRACG 901.16 Y
TRACG 901.17 Y
TRACG 901.18 Y
TRACG 901.19 Y
TRACG 901.20 Y
TRACG 901.21 Y
TRACG 901.22 Y
'lRACG 901.23 Y
TRACG 901.24 Y
TRACG 901.25 Y
TRACG 901.26 Y
TRACG 901.27 Y
TRACG 901.28 Y
TRACG 901.29 Y
TRACG 901.30 Y
TRACG 901.31 Y
TRACG 901.32 Y
TRACG 901.33 Y
TRACG 901.34 Y
TRACG 901.35 Y
TRACG 901.36 Y
TRACG 901.37 Y
TRACG 901.38 Y
TRACG 901.39 Y
TRACG 901.40 Y
'l RACG
'Y - Complete the work and submit rnponse to NRC N - Discontinue work until dnign rniew is rnumed i
7 06/14/94 1
Disposition of RAls In-process at GE (Continued)
IMLNm IllSL1)hIIlON* G BIN 1ENTS 901.41 Y
TRACG 901.42 Y
'lRACG 901.43 Y
TRACG 901.4I Y
TRACG 901.45 Y
TRACG 901.46 Y
TRACG 901.47 Y
'l RACG 901.48 Y
TRACG 901.49 Y
TRACG 901.50 Y
TRACG 901.51 Y
TRACG 620.12 N
lit:NIAN-SYSTEN1S INTERFACES I
620.13 N
lit:N1AN-SYSTEN1S IN'I ERFACES 620.14 N
lit!.\\1AN-SYSTEN1S INTERFACES 620.15 N
lit:51AN-SYSTEN1S INTERFACES 620.16 N
lit:51AN-SYSTEN1S INTERFACES 620.17 N
lit N1AN-SYSTENIS INTERFACES l
620.18 N
lit!.\\1AN-SYSTEN1S INTERFACES 1
620.19 N
lit!.NIAN-SYSTEN1S INTERFACES 620.20 N
lit.\\1AN-SYSTEN1S INTERFACES
)
620.21 N
llUNIAN-SYSTEN1S INTERFACES I
620.22 N
lit:N1AN-SYSTENIS INTERFACES 620.23 N
lil:N1AN-SYSTEN15 INTERFACES 620.21 N
lit?.\\1AN-SYSTEN1S INTERFACES 620.25 N
1Il?N1AN-SYSTEN1S 1NTERFACES 620.26 N
llU.NIAN-SYSTEN1S INTERFACES 620.27 N
lil31AN-SYSTEN1S INTERFACES I
620.28 N
llUNIAN-SYSTEN1S INTERFACES 620.29 N
litiN1AN-SYSTENIS INTERFACES 620.30 N
llUN1AN-SYSTEN1S INTERFACES 620.31 N
lit:51AN-SYSTEN1S INTERFACES 620 32 N
llUNIAN-SYSTENIS INTERFACES 620.33 N
llUS1AN-SYSTENIS INTERFACES 620.31 N
1iUN1AN-SYS'I E.\\1S INTERFACES 900.35 Y
l'ANTilERS PRETEST gal CS FOR TRANSIEN F 950.42 Y
DODEWAARD Pl. ANT STARTUP 420.20 N
1 & C DESIGN-ITAAC 420.23 N
1 & C DESIGN-ITAAC 420.75 N
I & C DESIGN-ITAAC 420.08 N
1 & C DESIGN-ITAAC 420.68 N
I & C DESIGN-1TAAC 420.72 N
I & C DESIGN-ITAAC
- Y - Complete the work and submit rnporne to NRC N - Discontinue work until dnign review is resumed 8
06/14/94
Disposition of RAls In-process at GE (Continued)
RAI No.
His!"OSrrION* 00MMENTS 420.50 N
I & C DESIGN 420.99 N
I & C DESIGN 420.100 N
I & C DESIGN 420.101 N
I & C DESIGN 420.102 N
I & C DESIGN 420.103 N
! & C DESIGN 420.104 N
I & C DESIGN 420.105 N
I & C DESIGN 420.106 N
I & C DESIGN 420.107 N
I & C DESIGN 420.108 N
I & C DESIGN 420.109 N
I & C DESIGN 420.110 N
I & C Dr. SIGN 420.111 N
1 & C DESIGN 420.112 N
I & C DESIGN 420.113 N
I & C DFSIGN 440.7 N
RTNSS 440.8 N
REMOTE SIIUTDOWN SYSTEM 440.9 N
REMOTE SilUTDOWN SYSTEM 440.10 N
Rl'S SCRAMS 440.11 N
D l'V 440.12 N
REACTOR COOI.DOWN 440.13 N
CllAPTER 1 440.14 N
TUR151NE 15Yl' ASS 440.15 Y
RCS 440.16 Y
ISOI.ATION CONDENSER 440.17 Y
CONTROL RODS 440.18 N
POWER DISTRillUTION 440.19 N
CONTROL STRATEGY 440.20 N
CONTROL. RODS 440.21 N
CONTROL. ROD DRIVES 440.22 N
CONTROL ROD DRIVES 440.23 N
CONTROL. ROD DRIVES 440.24 N
CONTRO!. ROD DRIVES 440.25 N
CONTROL. ROD DRIVES 440.26 N
CONTROI. ROD DRIVES 440.27 N
CONTROL ROD DRIVES 440.28 N
FMEA 4402)
N FCV 440.30 N
SICS 440.31 N
TRANSIENTS 440.32 Y
S/RVs 410.33 Y
UNITS 440.34 N
TRANSIENT ANAI.YSIS 440.35 N
PRESSURE RELIEF 440.36 Y
ISOLATION CONDENSER 440.37 Y
ISOLATION CONDENSER 440.38 Y
ISOLATION CONDENSER 440.39 Y
ISOIATION CONDENSER
- l' - Complete the work and submit response to NRC N - Ducontinue work until design review is resumed 9
06/14/94
.~
.~
Disposition of RAls In-process at GE (Continued)
RAI No.
Ills.EOSFI' ION
- _C931MJ315 440.40 Y
ISOIATION CONI)ENSER 440.41 Y
ISOLATION CONI)ENSER 410.42 Y
ISOl ATION CONI)ENSER 440.43 Y
ISOl ATION CONDENSER 440.44 Y
IM)l ATION CONI)ENSER 440.45 Y
ISOl ATION CONDENSER 440A6 Y
ISOLATION CONDENSER 440.47 Y
ISOl ATION CONDENSER 440.48 Y
ISOI ATION CONDENSER 440.49 Y
ISOLATION CONDENSER 440.50 Y
ISOl ATION CONDENSER 440.51 Y
ISO! ATION CONDENSER 440.52 Y
ISOl ATION CONDENSER 440.53 Y
ISOl ATION CONDENSER 440.54 Y
ISOI ATION CONDENSER 440.55 Y
ISOl ATION CONDENSER l
440.56 Y
ISOLATION CONDENSER 440.57 Y
ISOl ATION CONDENSER 440.58 Y
ISOLATION CONDENSER
- Y - Complete the work and submit response to NRC N - Discontinue work until design review is resumed L
f 10 06/14/94
-