I fh).
GE Nuclear Energy wwtwa~,
? ru'f:ft Art %e Lin J
- P Ch f 3 i
May 25,1994 MFN No. 072-94 Docket No.52-001 i
Document Control Desk U.S. Nuclear Regulatory Commission Washington DC 20555 Attention:
R. W. Borchardt, Director Standardization Project Directorate
Subject:
Submittal of Amendment 35, Non-Proprietary Information to GE's ABWR SSAR and Certified Design Material, Revision 4
References:
Submittal of Amendment 35, Proprietary Information to GE's ABWR SSAR MFN No. 073-94 Dated May 25,1994 '
In accordance with direction of NRR project staff, GE is providing, cop (ies (25 total non-proprietary SSAR Amendment 35 and Certified Design Material CDM) Revision 4 to the specified NRR recipients listed on Attachment 1. Further, nine (9) copies are sent i
herem to the Document Control Desk. This is being done to accelerate the distribution l
process and ensure timely staff receipt of SSAR Amendment 35 and CDM Revision 4.
Except as hereinafter noted, this submittal,in conjunction with prior ABWR submittals, completes satisfaction of the requirements of 10 CFR 52.47.
SSAR Amendment 35 and CDM Revision 4 include changes resulting from resolution of the remaining FSER technical open items and from the following staff comments on Amendment 34:
1.
Ixtter, R. W. Borchardt to Joseph Quirk, Remaining Actions on the Advanced Boiling Water Reactor (ABWR) Review, May 3,1994.
2.
Letter, R. W. Borchardt to Joseph Quirk, Remaining Actions on the Advanced Boiling Water Reactor (ABWR) Review, May 13,1994.
,x ITRDK 94-018 g2-940610022k 940525
/ /[
PDR -ADOCK 05200001 A
PDR i
SSAR Amendment 35 and CDM Revision 4 also provides information resulting from GE's continuing internal verification process which has been conducted in full compliance with GE procedures governing treatment of engineering documentation. GE's verification process is intended to assure that the reissued ABWR SSAR (Amendment 31) as augmented by Amendments 32,33,34, and 35 accurately reflects its design documentation, is technically accurate and consistent within itself, and accurately depicts the CDM. An affirmation letter complying with the filing requirements of 10 CFR 52.45(d) and 50.30(b) is attached.
Each copy of the non-proprietary portion of SSAR Amendment 35 and CDM Revision 4 consists of 1 box of 8-1/2 x 11 inch pages and one box containing the Chapter 21 large size drawings. The corresponding page change instructions and listing for the Chapter 21 drawings are provided on Attachment 2 r, :d 3 res,ectively. Each cop inci p, ages for the non y of CDM Revision 4 is included in the box 38-1/2 x 11 proprietary portion of SSAR Amendment 35. The CDM Revision 4 page change instructions are provided on Attachment 4.
Please note that part of Chapter 4 contains information that is designated as General Electric Proprietary Information. This information is being submitted under separate cover (Reference letter).
Sincerely,
,J
\\
y,^
050
,s Jiiseph F. Quirk Project ManagTer i ABWR Certification
()1C-782, (408)925-6219 cc:
S. A. Ilucik GE)
W. T. Russell NRC)
F. J. Miraglia NRC)
T. II. Boyce NRC)
D. M. Crutchfield NRC)
D. J. McGoff DOE S. M. Franks DOE F. A. Ross DOE N. D. Fletcher DOE K. E. Stahlkopf (EPhl) 1TkHK G4418
t i
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION l
f In the Matter of
)
General Electric Company
)
ABWR Standard Plant Design
)
DOCKET No.52-001 Final Design Approval and Design
)
t Certification Application
)
APPLICATION FOR REVIEW OF
- ABWR STANDARD SAFETY ANALYSIS REPORT' FOR FINAL DESIGN APPROVAL AND DESIGN CERTIFICATION Steven R. Specker, being duly sworn, states that he is Vice President and General Manager, GE Nuclear Energy, General Electric Company, that he is authorized on the part of said corporation to sign and file with the Nuclear Regulatory Commission this document; that all statements made and matters set forth therein are true and correct to the best of his knowledge, information and belief.
General Electric Company k
By:
i Steven R. Specker Vice President and General Manager GE Nuclear Energy Subscribed and sworn to before me this A Mday of May 1994
- '1 Notarp Public
.-o
--~-w...~
mm ema i 1
= =?g com me o. c, a, N a g' y 7 a y nia s -)
._ c.,-.
7{
e
.2 c
sAmA ctnAcoumv j **di
..;$i3%7 [ ]
w c.mm. Epee MAR 26
-___=_~.m____,
ATTACHMENT 1 DIRECT S111PMENT OF SSAR AMENDMENT 35 NON-PROPRIETARY INFORMATION AND CDM REVISION 4 G. Bagchi (2 copies)
R. J. Barrett C. II. Berlinger i
R. W. Borchardt (2 copies)
T. G. Collins L. J. Cunningham C.1. Grimes J. W. Johnson F. Kantor C. E. McCracken P. F. McKee J. C. McKnight (9 copies) l M. M. El-Zeftawy*
(9 copies)
M. M. Slosson J. S. Wermiel G. Zech
'ACRS 11kHK94418