c 3
t GE Nuclear Energy an n u c, m Ii 5 Cur: < l mue San.hw CA 9b ??S May 31,1994 MFN No. 078-94 Docket No. STN 524)04 Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention:
Richard W. Borchardt, Director Standardization Project Directorate
Subject:
NRC Requests for Additional Information (RAls) on the Simplified Boiling Water Reactor (SBWR) Design
References:
- 1. Transmittal of Requests for Additional Information (RAI)s Requesting the SBWR Design,1.ctter from M. Malloy to P. W. Marriott dated September 15,1993
- 2. MFN No. 005-94, NRC Requests for Additional Information (RAls) on the Simplified Boiling Water Reactor (SBWR)
Design, Letter from J. E. Leatherman to R. W. Borchardt datedjanuary 17,1994.
The Reference 2 letter responded to the Reference 1 letter's request for additional information regarding the SBWR test program. In fulfillment of this request for PANTHERS pre-test analyses, GE is submitting a response to RAI 900.35.
Sincerely,
/M -
P. W. Marriott, Manager Advanced Plant Technologies M/C 781, (108) 9254948 1:nclosure M. Malloy, Prqject Manager (w/2 copies of Attachment 1) cc:
F. W. liasselberg, Project Manager (w/l copy of Attachment 1) n 1 ['. O d b g/
9406070327 940531 L
j ADOCK052Og4 g
t RAI Number: 900.35 Question:
What pre-test analyses have been performed using the TRACG code for 1%NTIIERS tests? What were the results?
1 GE Revised Response:
]
Pre-test calculations for the 1%NTHERS PCC tests are attached.
4
.