.PHILADELPHI A ELECTRIC COM PANY NUCLEAR GROUP HEADQUARTERS 955 65 CHESTERBROOK BLVD.
WAYNE, PA 19087 5691 (ais) s40-sooo NUCLE AR ENGINEERING & SERVtCES DEPARTMENT January 25, 1991 Docket Nos.
50-277 50-278 50-352 50-353 License Nos.
DPR-44 DPR-56 NPF-39 NPF-85 U.S. Nuclear Regulatory Comissico Attn: Docu mnt control Desk Washington, ' IX: 20555 SUBJECI:
Limrick Generating Station, Units 1 and 2-Peach Bottcn Atcmic Power Station, Units 2 and 3 Generic Imtter 88-14, " Instrument Air Supply System Problems Affecting Safety-Related Equipnent" Clarification of Final Report Submittal Dates PEFERENCE:
1.
Latter frun J. W. Gallagher (PECo) to NRC dated February 13, 1989 2.
Istter frrn R. J. Clark (NRC) - to G. A. Hunger, Jr..
(PECo) dated May 23,.1990 3.-
-Istter frun G. J. Beck (NRC) to NRC dated January 10,-1991
-4.
Telecon between G. J. Beck (PECo) -arxl G. Y. Suh (NRC) dated January 18, 1991 Dear Sirt
'Ibe reference 4 telec.m and a ' subsequent review of the related
---correspondence made m aware that the intent of our letter of January "10,'.1991 (Ref.; 3) was not adequately ccamunicated. 'Ihis letter is Intended to clarify the information previously provided as well as to.-
Lacknowledge that the incorrect informtion reflected.in the NRC letter of May 23,1990 (Ref. 2) was based on informtion provided by Philadelphia Electric.Conpany (PECo).
'9102070173 910125 ADOCK0500g7 gOef g on fjp
l
=#
U.S. Nuclear Regulatory Consnittee January 25, 1991
Attn: M=nt Control Desk Page 2 In our letter dated February 13,1989 (Ref.1), PECo responded to Generic letter 88-14, "Instnment Air Supply System Problems Affectiry Safety-Related Equipment." 'Ihis response identified several actions to be conpleted and stated, in part, that "a summary report will be submitted by 60 days followirg restart from the next refueling cutage of Peach Bottom Atomic Power Station, Unit 3..." 'Ibe Nuclear Regulatory-Consnission (NRC) response dated May 23,1990 (ref. 2) stated that a sumary report on all actions taken at Peach Bottom and Limerick will be submitted in the Sumer of 1991.
Information on Peach Bottan outage dates was verbally supplied by us.
It appears that the Summer-of 1991-date was based on our inadvertent use of the PIRPS Unit 2 rather than Unit 3_ outage schedule.
Based on the current PBAPS Unit 3 outage schedule,.We anticipate that a final response will be subnitted in early 1992. 'Ihe current scluduled end date for the Unit 3 refueling outage is December 6,-1991.
3 To sumarize, based on our previous connitmnt and the current Peach Bottom outage schedule a sumary report on actions taken at IGS and Peach Battom in response to Generic Letter 88-14 will be suhnitted in early 1992.
We regret the inconvenience and misunderstanding caused by our January.10, 1991 letter.
very truly yours,
} },7 ( $ Y G. J.
Manager i
i Licensirg Section '.
Nuclear Ergineering-and Services GJB:mls cc:. T. T. Martin, Mministrator, Region I, USNRC J. J. Lyash, USNRC Senior Resident Ingxctor, PB T. J. l<enny, USNRC Senior Resident Inspector, -IGS i
_