Text
._
1 Wisconsin Electnc POWER COMPANY Point Beach Nuclear Plant 6610 Nuclear Rd., Two Rivers, WI 54241 (414) 755 2321 1
PBL 94-0103 April 4, 1994 Document Control Desk U. S. NUCLEAR REGUIATORY COMMISSION Mail Station P1-137 Washington, DO 20555 Gentlemen:
DOCKETS 50-266 AND 50 301 MQNTHLY OPERATING REPORTS POINT BEACH NUCLER PLANT, UNITS 1 AND 2 4
Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of March, 1994.
Sincerely, G. J. M : field PBNP Manager GJM/ lab Attachments
=
cc:
L. L. Smith, PSCW NRC Regional Administrator, Region III NRC Resident Inspector i
4 e
9404110339 940331 D
</t m.,___,_x
OPERATING DATA REPORT DOCKET NO. 50-266 DATE:
04/04/94 COMPLETED BY: Richard F. Arnold TELEPHONE:
(414) 755-6193 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1
. NOTES 2.
REPORTING PERIOD: March - 1994 3.
LICENSED THERMAL POWER (MWT):
1518.5 4.
NAMEPLATE RATING (GROSS MWE):
523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE):
497.0
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
509.0.
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
485.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) : NA
- 10. REASONS FOR RESTRICTIONS, (IF ANY) :
NA THIS MONTH YEAR TO DATE CUMULATIVE I
- 11. HOURS IN REPORTING PERIOD 744.0 2,160.0 205,128.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2,160.0 170,878.9
- 13. REACTOR RESERVE SHUTDOWN HOURS 00 0.0 667.3
- 14. HOURS GENERATOR ON LINE 744.0 2,155.4 167,795.6
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,107,260 3,217,844 236,699,614
- 17. GROSS ELECTRICAL ENERGY GENERATED 374,690 1,089,520 79,943,650
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 359,295 1,044,524 76,200,114
- 19. UNIT SERVICE FACTOR 100.0%
99.8%
81.8%
- 20. UNIT AVAILABILITY FACTOR 100.0%
99.8%
82.2%
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 99.6%
99.7%
76.2%
- 22. UNIT CAPACITY FACTOR (USING DER NET) 97.2%
97.3%
74.7%
- 23. UNIT FORCED OUTAGE RATE 0.0%
0.0%
1.6%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling Outage, 04/02/94, 30 days
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 i -
POINT BEACII NUCLEAR PLANT DOCKET NO.
50-266 i
AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach. Unit 1 MONTll MARCH - 1994 DATE April 4.1994 COMPLETED BY R. F. Arnold TELEPHONE 414/755-6193
. AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
487 11 494
.21 494 4.
2 492 12 494-22 488 3
492 13 494 23 480 4
495 14 494 24 475 5
492' 15 494 25 4?J 6
492 16 494 26 463 7
446 17 494 27 457 8
4%
18 -
495 28 451 9
489 19 494 29 444 10 -
493 20 494 30 446 i
31 437
" PBF-0028a
- e.go)
POINT BEACII NUCLEAR PLANT Docket No.
50-266 Unit Name Point Beach. Unit 1 UNIT SHUTDOWNS AND POWER REDUCTIONS Date April 4.1994 Completed By R. F. Arnold REPORT MONTH MARCH - 1994 Telephone No.
414/755-6193 Method of Shutung 2
No.
Date Type' Duration Reason Down Ixensee Event System Component Cause and Corrective Action MA NA NA NA NA NA NA NA NA NA
'F: Forced Reason:
' Method:
' Exhibit G - Instructions 2
S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training &
Previous Shutdown Licensing Exam 5 - Reduced Imad F - Administrative 6 - Other (explain)
' Exhibit I - Sarne Source G - Operational Error (explain)
H - Other (explain) e W
PBF-0028b (03-90)
DOCKET NO.
50-266 UNIT NAME Point Beach Unit 1 DATE April 4, 1994 j
COMPLETED BY R.
F. Arnold TELEPHONE 414/755-6193 Unit 1 operated at an average of 483 MWe net for the report period with no significant load reductions.
Licensee Event Report 50-266/301 94-001-00, Failure To Perform A
~
Fire Watch At The Technical Specification Frequency, was submitted.
Licensee Event-Report 50-266/301 94-002-00, Inoperability Of Both j
Emergency Diesel Generators, was submitted.
Licensee Event Report 50-266/301 94-003-00, Reactor Coolant Sample System Containment Isolation Valve Testing, was submitted.
Safety-related maintenance included:
- 1. The leads on the ammeter for D-305' swing station battery were swapped, at the sliders (external side), because incorrect movement was indicated during a battery service test.
1 l
- 2. The packing on P-32E service water pump was adjusted because of excessive seal leakage (approximately 2 gpm).
- 3. The regulator filter and three positioner gauges were changed on component cooling heat exchanger (HX-12B) outlet temperature control valve operator (SW-00012B).
4 4.
North Zurn strainer inlet valve (SW-00016) was replaced with a rebuilt valve because of leakage through the valve seats.
5.
Replaced two broken tension pins in the service water north header east isolation valve operator (SW-00063).
6.
Calibrated I/P converter and valve positioner on RHR heat exchanger HX-11A.
7.
Replaced four 480 VAC molded case circuit breakers as part of the breaker upgrade program.
I l
I
b OPERATING DATA REPOR.T DOCKET NO. 50-301 DATE:
04/04/94 COMPLETED BY: Richard F. Arnold TELEPHONE:
(414) 755-6193 OPERATING STATUS l
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2
. NOTES
- 2. REPORTING PERIOD: March - 1994 3.
LICENSED THERMAL POWER (MWT):
1518.5 p
- 4. NAMEPLATE RATING (GROSS MWE):
523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE):
497.0
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) :
509.0.
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
485.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) : NA
- 10. REASONS FOR RESTRICTIONS, (IF ANY) :
NA
'THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744.0 2,160.0 189,913.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2,160 0 166,360.6
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
- 14. HOURS GENERATOR ON LINE 744.0 2,160.0 164,026.7
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
- 16. GROSS THEPRAL ENERGY GENERATED (MWH) 1,115,386 3,221,621 235,592,805
- 17. GROSS ELECTRICAL ENERGY GENERATED 380,860 1,102,460 80,126,720
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 364,906 1,056,071 76,386,711
- 19. UNIT SERVICE FACTOR 100.0%
100.0%
86.4%
- 20. UNIT AVAILABILITY FACTOR 100.0%
100.0%
86.5%
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 101.1%
100.8%
82.3%
- 22. UNIT CAPACITY FACTOR (USING DER NET) 98.7%
98.4%
80.9%
l
- 23. UNIT FORCED OUTAGE RATE 0.0%
0.0%
1.0%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
~
Refueling Outage, 09/24/94, 36 days-
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 w,.-__
m
' POINT BEACII NUCLEAR PLANT DOCKET NO.
50-30; i-AVERAGE DAILY UNIT POWER LF, VEL UNIT NAME Point Beach. Unit 2 L
MONTH ' MARCII - 1994 DATE April 4.1994 l
COMPLETED BY R. F. Arnold TELEPHONE 414/755-6193 l
t AVERAGE AVERAGE AVERAGE i
DAILY DAILY
. DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET
_i 1
491 11.
495 21 494 i
2 496 12 4%
22 491
[
3 488 13 494 23 486 4
495 14 495 24 477 4
5 492 15 495 25' 480 7
6 492 16 494 26 484 7
496 17 495 27 484 8
8 492 18 495 28 484 9
493 19 494 29 484 10 494
'20 494 30 48?
i 31 482 i
, ~ '
I w
9 PBF-0028a (03-90)
=
POINT BEACH NUCLEAR PLANT Docket No.
50-301 Unit Name Point Beach. Unit 2 UNIT SHUTDOWNS AND POWER REDUCTIONS Date A9til 4.1994 Completed By R. F. Arnold REPORT MONTH Af ARCH - 1994 Telephone No.
414n55-6193 Method of Shumng Duration Down Licensee Event System Compone..t Cause and Corrective Action No.
Date Type' (Hours)
Reason
- Reactop Report No.
Code' Code' To Prevent Recurrence NA NA NA NA NA NA NA NA NA NA
'F: Forced 2 Reason:
3 Method:
' Exhibit G - Instmetions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training &
Previous Shutdown Licensing Exam 5 - Reduced Load F - Administrative 6 - Other (explain) 5 Exhibit I - Same Source G - Operational Error (explain)
H - Other (expldn)
O 9
e PBF-0028b (03-90)
DOCKET NO.
50-301 UNIT NAME Point Beach Unit 2 DATE April 4, 1994 COMPLETED BY R.
F. Arnold TELEPHONE 414/755-6193 Unit 2 operated at an average of 490 MWe net for the report period with no significant load reductions.
Power was reduced 3%-
on March 23, 1994 because of feed flow calculation uncertainties associated'with the leading edge flow meters.
The unit is currently operating at 98.5% and a Licensee Event Report is being.
submitted to describe the condition.
Safety-related maintenance included:
- 1. Installed amptector and replaced operating mechanism on 480 VAC breaker (B52-39A) which supplies power to a containment accident recirculat' ion fan.
- 2. A safety injection line snubber (HS-26) was replaced.
.i_.
'