ML20063L567

From kanterella
Jump to navigation Jump to search
Forwards Fitness for Duty Program Performance Data for Period of 930701-1231 Per 10CFR26.71(d)
ML20063L567
Person / Time
Site: Callaway Ameren icon.png
Issue date: 02/18/1994
From: Peevy J
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
ULNRC-2961, NUDOCS 9403070085
Download: ML20063L567 (5)


Text

!

i

('OI!db%ff Pldnf i

l Pxt Offu Box 620 Faitan, M>ssourt 65751 February 18,1994 ULNRC - 2961 Union Eucenue 53 1

Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Attention: Document Control Desk l

Mail Station P1-137

)

Washington, DC 20555 l

l Gentlemen:

l In complying with the Fitness For Duty Rule,10CFR26.71(d), Recordkeeping Requirements, please find enclosed Union Electric's Callaway Plant Fitness For Duty Program Performance Data for the six (6) month period beginning July 1,1993 and ending on December 31,1993.

Enclosures include:

Attachment A Fitness For Duty Program Performance Data Personnel Subject to 10CFR26 (2 pages)

Attachment B Fitness For Duty (additional statistical data)

If you have any questions in regards to the Performance Data Reported, please contact me at (314)676-8246.

Sincerely, I

bb N

(

AW ( '{Jw ames R. Peevy Manager, Operations Support Fitness For Duty Manager q),

JRP/RGR/PJD/KRF/bb Enclosures oon.iin 9403070085 940218 PDR ADOCK 05000483 I

\\\\

R PDR

\\

w/ attachments cc:

J. B. Martin, Regional Administrator U. S. Nuclear Regulatory Commission Region lli 801 Warrenville Road Lisle, IL 60532-4351 M. J. Farber Chief, Reactor Projects Section 111 A U. S. Nuclear Regulatory Commission Region ill 801 Warrenville Road Lisle, IL 60532-4351 B. L. Bartletti/D. R. Calhoun Resident NRC Inspector, Callaway Plant Callaway Resident Office U. S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077-1302 L. R. Wharton (2 copies) l Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 13-E-21 Washington, DC 20555 Missouri Public Service Commission Manager, Electric Department P. O. Box 360 Jefferson City, MO 65102 Thomas A. Baxter Shaw, Pittman, Potts, & Trowbridge 2300 N. Street, N.W.

Washington, DC 20037 i

I s

l..

Fitness for Duty Program Performance Data Personnel Subject to 10CFR26 (Numarc Rev. Date 1/92).

j 1

Union Electric July - December.1993 Company 6 Months Callaway Plant Location Patricia Davis. R.N.

314-676-4300 Contact Name Phone (!nclude Area Code) l CUTOFFS: Screen / Confirmation (ng/ml)

O Appendix A to 10CFR26 Marijuana 20/15 Amphetamines 1000 / 250 Barbiturates 300/150 Cocaine 300/150 Phencyclidine 25/ 25 Benzodiazpines 300 / 150 Opiates 300/150 Alcohol (.04% BAC)

Long-Term Short-Term Testing Results Licensee Employees Contractor-Personnel Contractor-Personnel Average Number with 973 228 175 Unescorted Access Categories Tested Positive -

Tested Positive Tested Positive Pre-Access 28 0

7 0

809 18 Post Accident 0

0 0

0 0

0 Observed Behavior 0

0 0

0 2

2 Randon1 496 0

137 0

167 2

Follow-up 2

0 0

0 1

0 Other 0

0 0

0 1

0 TOTAL 526 0

144 0

980 22 Attachment A Page 1 of 2 l

L.

l Breakdown of Confirmed Positive Tests for Specific Substances

.. 1 2

3

-4 5

i

  • Maripana.

Cocaine Opiates

  • Amphetamines Phencyclidine Alcohol -

Refusal to Test Bartdurates Benzodiazepines i

l Licensee 0

0 0

0 0

0 0

0 Employees.

t

. Long-Term 0

0 0

0

.0 0

0 0

i Centractors 7

Short-Term 1

0 0

4 0

0 1

Contractors :

16 1

TOTAL 16 1

0 1

0 4

0 0

1 t

i

  • Left Side Record of test results that would have been Positive at the NRC cutoff level.

i Right Side -

Record of MRO Confirmed Positives based on Union Electric's more stringent cutoff level.

[

i 1 Random alcohol positive 1 Prebadge alcoho1 positive 2 Test-for-cause alcohol positives i

r Attachment A 4

Page 2 of 2 i

h i

FITNESS FOR DUTY Bilow is a summary of Fitness for Duty statisticalinformation for July - December,1993.

CONTRACT /

UNION ELECTRIC CONSULTANT TOTALS Pre-Employment 13 0

13 Pre-Badge 15 816 831 Randorn 496 304 800 l

Follow-Up 2

1 3

Post Accident 0

0 0

Test-for-Cause 0

2 2

Appeal /Other 0

1 1

l TOTALS l

526 l

1124 l

1650

'll l Cumulative Average Population l 973

-l-403

.l 1376 l

f l

Individuals Randomly Screened:

CONTRACT /

UNION ELECTRIC CONSULTANT TOTALS Screened Zero 477 1072 1549 Screened Once 361 213 574 Screened Twice 54 36 90 Screened Three Times 6

5 11 Screened Four Times 1

1 2

Screened Five Times 1

0 1

Number of Specimens Determined Positive by MRO:

i CONTRACT /

UNION ELECTRIC CONSULTANT TOTALS Pre-Badae Cannabinoids -

0 16 16 Cocaine 0

1 1

Benzodiazepines 0

1 1

Alcohol 0

1 1

Random Cannabinoids 0

1 1

Alcohol 0

1 1

Test-for-Cause l Alcohol l

0 l

2 l

2 l

l TOTALS l

0 l

23 l

23 ll Attachment B Page 1 of 1

-