ML20062F752
| ML20062F752 | |
| Person / Time | |
|---|---|
| Site: | Perkins |
| Issue date: | 11/30/1978 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Dail L DUKE POWER CO. |
| Shared Package | |
| ML20062F751 | List: |
| References | |
| NUDOCS 7812200315 | |
| Download: ML20062F752 (2) | |
See also: IR 05000488/1978001
Text
h
.
.
,
.
fyrl*
.
8
UN:TED STATES
"'4
9[o
NUCLEAR REGULATORY COMMISSION
y,
.
g
REG 8oN 18
3+(
g
f
t
101 M ARIETT A $TREET.N.W.
,
[
ATLANTA. GEORGIA 30303
o
NOV 3 01978
In Reply Refer To:
RII:JKR
!
50-488/78-1
.
'
'
50-489/78-1
'1
'
"
50-490/78-1
-
P
'
'
Duke Power Company
ATTN:
Mr. L. C. Dail, Vice President
/
Design Engineering
P. O. Box 33189
Charlotte, North Carolina
28242
.
Gentlemen:
/
i
,
,
a
,.
,
This ref ers to the inspection conducted by Mr. J
K. Rausch of this office
,
on November 3,1978, of activities associated with your application for; an
NRC Construction Permit for Perkins Nuclear Station Unit Nos. 1, 2 and 3
and to the discussion of our findings held with Mr. L. R.'Barnes at the
-
/
/
'
'
conclusion of the inspection.
Areas examined during the inspection and our find'ing'd are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective exa-inations of procedu'rcs and representative
,
records, interviews with personnel, and observations by the inspector.
'
,+
Within the secpe of th'is inspection we identified no significant devia-
Ji
- "
~
tions from the requirements of 10 CFR 50, Appendix B, " Quality Assurance
Criterie for Nuclear Power Plants," of the NRC regulati'on' .
s
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy ofnthis letter
9
and the enclosed inspection report will be placed in the NRC's Public
Document Room. If this report contains any information that_you (or
'
,
$
your contractor) believe to be proprietary, it is necessary that you
.
make a written application within 20 days to this office to withhold
such infor=ation from public disclosure. Any such application must
.
include a full statement of the reasons on the basis of which it is
,
claimed that the information is proprietary, and should be prepared
so that proprietary information identified in the application is
a
contained in a separate part of the document. If we do not hear ,
-
frco you in this r gard within the specified period, the report
d-
T
.ic Document Room.
will be placed
'
7812200515
-
1
1
d ,
j
--,
_,.
-
,
1
~.
_ _ _ _ _
-
.
.,
,
,.
NOV 3 01978
Duke Power Company
-2-
7
Should you have any questions concerning tinis letter, we vill be glad to
discuss them with you.
~
Sincerely,
l
$W
'
'
jjCharlesE. Murphy, Chief
Reactor Construct, ion and Engineering
)
Support Branch
Enclosures: Inspection Report Nos. 50-488/78-1,
50-489/78-1 and 50-490/78-1
i
,
3
D
/
r
i
o
$
er
8
'g
.
$
$
_ _ _ _ _ _ _ _ _ . _