Forwards IE Inspec Repts 50-488/78-01, 50-489/78-01 & 50-490/78-01 on 781103 During Which No Items of Noncompliance Were Noted
ML20062F752
Person / Time
Site: Perkins  Duke Energy icon.png
Issue date: 11/30/1978
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dail L
DUKE POWER CO.
Shared Package
ML20062F751 List:
References
NUDOCS 7812200315
Download: ML20062F752 (2)


See also: IR 05000488/1978001

Text

h

.

.

,

.

fyrl*

.

8

UN:TED STATES

"'4

9[o

NUCLEAR REGULATORY COMMISSION

y,

.

g

REG 8oN 18

3+(

g

f

t

101 M ARIETT A $TREET.N.W.

,

[

ATLANTA. GEORGIA 30303

o

NOV 3 01978

In Reply Refer To:

RII:JKR

!

50-488/78-1

.

'

'

50-489/78-1

'1

'

"

50-490/78-1

-

P

'

'

Duke Power Company

ATTN:

Mr. L. C. Dail, Vice President

/

Design Engineering

P. O. Box 33189

Charlotte, North Carolina

28242

.

Gentlemen:

/

i

,

,

a

,.

,

This ref ers to the inspection conducted by Mr. J

K. Rausch of this office

,

on November 3,1978, of activities associated with your application for; an

NRC Construction Permit for Perkins Nuclear Station Unit Nos. 1, 2 and 3

and to the discussion of our findings held with Mr. L. R.'Barnes at the

-

/

/

'

'

conclusion of the inspection.

Areas examined during the inspection and our find'ing'd are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective exa-inations of procedu'rcs and representative

,

records, interviews with personnel, and observations by the inspector.

'

,+

Within the secpe of th'is inspection we identified no significant devia-

Ji

  • "

~

tions from the requirements of 10 CFR 50, Appendix B, " Quality Assurance

Criterie for Nuclear Power Plants," of the NRC regulati'on' .

s

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy ofnthis letter

9

and the enclosed inspection report will be placed in the NRC's Public

Document Room. If this report contains any information that_you (or

'

,

$

your contractor) believe to be proprietary, it is necessary that you

.

make a written application within 20 days to this office to withhold

such infor=ation from public disclosure. Any such application must

.

include a full statement of the reasons on the basis of which it is

,

claimed that the information is proprietary, and should be prepared

so that proprietary information identified in the application is

a

contained in a separate part of the document. If we do not hear ,

-

frco you in this r gard within the specified period, the report

d-

T

.ic Document Room.

will be placed

'

7812200515

-

1

1

d ,

j

--,

_,.

-

,

1

~.

_ _ _ _ _

-

.

.,

,

,.

NOV 3 01978

Duke Power Company

-2-

7

Should you have any questions concerning tinis letter, we vill be glad to

discuss them with you.

~

Sincerely,

l

$W

'

'

jjCharlesE. Murphy, Chief

Reactor Construct, ion and Engineering

)

Support Branch

Enclosures: Inspection Report Nos. 50-488/78-1,

50-489/78-1 and 50-490/78-1

i

,

3

D

/

r

i

o

$

er

8

'g

.

$

$

_ _ _ _ _ _ _ _ _ . _