ML20059M145

From kanterella
Jump to navigation Jump to search
Applicant Exhibit A-1,consisting of 930802 Testimony of Util Adressing Contention I: Maintenance & Surveillance
ML20059M145
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/17/1993
From:
AFFILIATION NOT ASSIGNED
To:
References
CON-#493-14433 OLA-2-A-001, OLA-2-A-1, NUDOCS 9311180218
Download: ML20059M145 (6)


Text

__ -_.______ ___ _

59 - 2 75 s z a - Ocn A-/ f n 93 EXHIBIT 1 ViliU ti&C PROFESSIONAL QUALIFICATIONS

'L

~ ! J f I ta': '

OF c

a
,C 4, jip t

..i BRYANT W.

GIFFIN ffJCLE AR PEC'J1 ATORY Coi!MtsION D de' No. h ]3,,QQ

"* " < d]A0Jac Gb5mI_ ELiegic 00, OM, col f ah No, f

sa" v

ANnvu t/

___,nnnita

~~

~. _. _ _ _.

V

.,g

,,,(,)

Ir p. t...,

~~

.____. REX C;[ 9,

'*---+-%

Co^

Cra, m. pp k']h3_f _[j

, 'g

,3 g "c

  1. 'W'NI.

9311180218 930817

~

PDR ADOCK 05000275 PDR G

i i

RESUME i

MANAGER, MAINTENANCE SERVICES Bryant W.'Giffin 1.

Birthdate - July 22,:1941 2.

Citizenship - USA L

3.

Education l

a.

B.S.,LElectrical. Engineering,_ North Carolina. State.

University, 1966.

)

b.

Professional Degree, Electrical Engineer, North Carolina State University, 1967 4.

Employment History - Joined PG&E on June 1, 1981.

1967 U.S.

Navy enlisted;

)

a.

1959 t

l l

b.

1967 - 1980 U.S.1 Navy Officer c.

1980 - 1981 Senior Engineer,. Westinghouse Electric Co.-

i

)

d.

1981 - 1983 Senior Enoineer,'PG&E1 1

e.

1983 - 1985 Instrument & Controls l

Maintenance Manager, DCPP.

)

f.

1985 - 1987 Supervising Engineer, Nuclear-I

-Operations Support-Department, PG&E 1988 Manager Nuclear' Operations g.

1987 Support, PG&E h.

07/01/88 - 09/25/89 Assistant Plant Manager -

Technical Services, DCPP, PG&E i.

09/25/89 - 07/08/91 Assistant Plant Manager -

l Maintenance Services, DCPP,

)

PG&E-j.

07/08/91 - Present Manager,-Maintenance Services (title change) 5.

Nuclear Experience i

3 a.

Manager, Nuclear Operations Support Responsible for providing support to the plant in,the:

areas of: project management, maintenance, primary and secondary chemistry, health physics, training, o

security, and environmental protection.

In addition-l-

to the above. support functions, I was responsible for

)

L. --.

a,:

s 1

nuclear fuel procurement, nuclear analysis, corporate emergency planning, the review of industry operating experience, and contract negotiations and administration for outage services, b.

Assistant Plant Manager - Technical Services, DCPP Responsible for the Plant Engineering, Computer Engineering, and Licensing Departments.

The plants engineering department includes plant system engineering, reactor engineering, surveillance testing, inservice inspection and testing, and design control.

The computer engineering department provides engineering support for all plant process computers and maintains the plant information management system and internal communications system.

The licensing department performs all plant related licensing functions.

c.

Assistant Plant Manager - Maintenance Services,_DCPP Responsible for the maintenance, work planning, scheduling, materials, and outage management.for both j

DCPP units.

The maintenance organization at DCPP is comprised of three departments:

Electrical, i

Mechanical, and Instrumentation and Controls, and is responsible for maintenance activities for both DCPP Units.

The Work Planning and Scheduling Department is responsible for the day to day, forced outage, and i

i planned outage scheduling of all corrective and I

preventive maintenance activities, design modifications, and testing activities.

The Macerials Department is responsible for the ordering, storage and issuance for all spare parts for DCPP.

The Outage Management organization is responsible for the

)

planning and implementation of forced and planned l

outage activities for both DCPP units.

I

)

)

t

)

l l

[

August 2,-~1993'

-l j

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING' BOARD In the Matter of:

)

Docket Nos. 50-275-OLA.

)

50-323-OLA Pacific Gas and Electric Company

)

)

(Construction Period-1 (Diablo Canyon Nuclear Power

)

Recovery)

Plant, Units 1 and 2)

.)

)

)

TESTIMONY OF PACIFIC GAS AND-ELECTRIC COMPANY ADDRESSING CONTENTION I:

MAINTENANCE AND SURVEILLANCE i

)

.i i

l EXHIBITS J

)

)

i i

)

t l

l

LIST OF EXNIBITS t

b 1.

Professional Qualifications of'Bryant W. Giffin' i

l 2.

Professional Qualifications of William G.-Crockett l

3.

Professional Qualifications of David A. Vosburg:

i 4.

Professional. Qualifications of' Steven R.- Ortore l

5.

PG&E's Licsnse Amendment Request.

6.

Program Directive-PD MA1 " Maintenance"-

j 7.

Diablo Canyon Maintenance Services l Department Organizational l

Chart.

8.

Basic Qualification Program Training Topics t

9.

Advanced or Plant-Specific Training Examples 10.

List of Maintenance and Surveillance Procedures i

11.

DCPP Work Control Process Overview t

12.

Professional Qualificatiori of'Tedd A. Dillard i

13.

Professional Qualificationslof David B. Miklush l

14.

Diablo Canyon Annual Capacity Factor j

l 15.

Diablo Canyon Operating Capacity Factor 16.

Diablo Canyon Refueling Outage Duration i

17.

Diablo Canyon Corrective Maintenance Backlog' l

18.

Diablo Canyon Overdue Preventiv Maintenance, Items =

'l 19.

NRC Commendation Letters 20.

SALP Report H

e-

~-

4 e

v-