ML20059M093
| ML20059M093 | |
| Person / Time | |
|---|---|
| Site: | 05200001 |
| Issue date: | 11/09/1993 |
| From: | Fox J GENERAL ELECTRIC CO. |
| To: | Poslusny C Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20059M095 | List: |
| References | |
| NUDOCS 9311180150 | |
| Download: ML20059M093 (1) | |
Text
m 4
GENuclear Energy Genera' Electnc Company US Canner Aamue San 2:.e CA 95125 November 9,1993 Docket No.52-001 f
Chet Poslusny, Senior Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of the Nuclear Reactor Regulation
Subject:
Submittal Supporting Accelerated ABWR Schedule - ABWR Adaptation of the New Section 5.0
Reference:
NRC Letter to Owners Groups," Content of Standard Technical Specifications, Section 5.0, Administrative Controls", W. T. Russell, October 25,1993
Dear Chet:
Enclosed is the ABWR adaptation of the new Section 5.0 of the Standard Technical Specifications as given to the r
- reference. Other agreements previously reached between NRC staff and GE on s.. ion 5.0 during the P&R process have been retained, with the exce ption of a few editorial changes which are indicated by redline and strikeouts. P; case provide markup comments,if any, as soon as possible.
Please provide a copy of this transmittal to Mark Reinhart.
Sincerely, s
Jack Fox Advanced Reactor Programs cc:
Alan Beard (GE)
Norman Fletcher (DOE)
Cal Tang (GE) p I
l mu 93Tils0150 931109 5
PDR ADDCK 05200001 V J
A PDR n
- --- --