ML20059C821
| ML20059C821 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 08/19/1993 |
| From: | Rueger G PACIFIC GAS & ELECTRIC CO. |
| To: | |
| References | |
| OLA-2-I-MFP-096, OLA-2-I-MFP-96, NUDOCS 9401060111 | |
| Download: ML20059C821 (6) | |
Text
. -
E 50 - 2 '7 5 l3 23-OL.Pt - L P $Y $bl{
yy y u eg: > t/ R.-;c Pacific Gas and Electric Company 77 Be::- r
,f Sr h n U 9.: * *
' St :; V:t Fm :t" r:
pK, /
1 - M F P-96 cne';t me:
r.. -; r;,
ue. --
October 9, 1992 53 " id
't il PG&E Letter No. DCL-92-219 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
20555 k
Re:
Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Licensee Event Report 1-92-017-00 Technical Specification 3.11.2.6 Not Het due to Inadequate Instructions on the Shift Chemistry Technician Turnover Checklist Gentlemen:
Pursuant to 10 CFR 50.73(a)(2)(i)(B), PC&E is submitting the mclosed Licensee Event Report concerning a missed surveillance of the gas decay tanks due to inadequate instructions of the shift chemistry technician turnover checklist.
This surveillance is required by Technical Specification 4.11.2.6.
This event has in no way affected the health and safety of the public.
l Sincerely, J Mr Mf i
Gregory H. Rueger cc:
Ann P. Hodgdon John B. Hartin Philip J. Morrill Harry Rood CPUC Diablo Distribution INP0 DCl-92-TC-N04) e -
NUCLEAR PfCin ATNY CCT?O'"i Enclosure 3 m,,,. 9 x.27 5 C d c u.tra o P F/' M b fn tre um & JhdJE1C Nb$ (EM SL t GW $6 10605/85K/SDL/2246
- 7 tra 1'
./
~
A.
./
"",j--)g/q []
'-m---
9401060111 930819 DR ADDCK 0500 5
.\\
,i,_.u*
LICENSEE EVENT REPORT (LER) 197437 1
i s.
DIABLO CANYON UNIT 1 0l5l0l0]0l2l7l5 1l 'l 5'
TECHNICAL SPECIFICATION 3.11.2.6 NOT MET DUE TO INADEQUATE INSTRUCTIONS ON THE SHIFT i
ma.>
CHEMISTRY TECHNICIAN TURNOVER CHECKLIST EVThT D ATE fll LAP h4MSEP 181 MPOstT DATE (?)
CTM(E F ACIL111ES IMv0LvtD (8) j MON DAY VR YM
&& Q T1AL M
hAOW DAY vm DOCEETmLMLR481 DIABLO CANYON UNIT 2 09 12 92 92 0l1l7 0l0 10 09 92 0
5 0
0 0
gAgr.
tais atPost is s e !Ytto puesvAnt To int atovietw=Ts or to cra: ni) j 1
LNe t x
10 cFt 50.73fe?t2) tilts)
O l 810 einEt -
<sr. City in abstr.Ct t= tow and in text, att ronn 366A)
Lacps&EB Coat? ACT Soft THIS LBFt 117)
T I L1 P**> f
- p* E S l
DAVID P. SISK, SENIOR REGULATORY COMPLIANCE ENGINEER
^***("'
805 545-4420 COMPLETE ONE Usul Pom EACH COMPomENT P AltWE DtSCsustD en TM4 MPoetY {131 C Ad${
$ t L T [*e
( OMpge,[ q 1 agh #A;.
R POG
(
CAv5(
S Y 111.M COMPCAL N1 MA 8AC-R POG E
l lll ll l l
lll lll l
1II III I
III III EXPECTED I
(*'
SUM"uMf h t AA St.LPOMT EAPEC TED (14' St,$MI$51DN I I I YES (if yes. CoPotete EXPECTED SUBm!S$10N CATE) lX l WO i
a85faACY ()$)
i On September 12, 1992, at 1420 PDT, the time limit for the surveillance required by l
Technical Specification (TS) 4.11.2.6, including the allowed extens %n of TS 4.0.2, was exceeded.
This required entry into TS 3.11.2.6 action a., which requires irrcediate action that was not performed.
l l
The root cause of this event was inadequate shift chemistry technician turnover checklist instructions.
The checklist instructions failed to specify the time requirements of T3 4.11.2.6.
The shift chemistry technician turnover checklist was revised.
Chemistry Analysis Procedure 0-18, " Chemical Analysis Procedure Noble Gas Decay Tank (s) in Terms of Equivalent XE-133," will be revised to explicitly state the 24-hour time limit required by TS 4.11.2.6.
10C05/55K
LICENSEE EVENT REPORT (LER) TEXT CONTINUATION 197437
..n o,, - m me, -. m
.-m u.7,-...,
DIABLO CANYON UNIT 1 0l5l0l0l0]2l7l5 92
- 0l1l7 0l0 2 l*l5 TEIT (37)
I 1.
Plant Conditions Unit I was in Mode 1 (Power Operation) at 80 percent power and Unit 2 was in Mode 1 (Power Operation) at 100 percent power.
II.
Description of Event A.
Summary:
On September 12,1992, at 1420 PDT, the time limit for the surveillance required by Technical Specification (TS) 4.11.2.6, including the allowed extension of TS 4.0.2, was exceeded when a technician failed to perform the required Units 1 and 2 gas decay tanks (GDTs)(WE)(TK) surveillance within the 24-hour time limit. At 1625 PDT, the technician completed the required TS 4.11.2.6 surveillance.
B.
Background:
TS 4.11.2.6 requires that the quantity of radioactive material contained in each GDT shall be determined to be within the limit set forth in TS 3.11.2.6 at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when radioactive materials are being added to the GDT.
Chemistry Analysis Procedure (CAP) D-18, " Chemical Analysis Procedure Noble Gas Decay Tank (s) in Terms of Equivalent XE-133," provides the methodology for determining the quantity of Xenon-133 in a GDT.
CAP D-18 states the surveillance..ast be performed " daily". The shift T
chemistry technician turnover checklist is used to remind C&RP technicians of procedural requirements.
C.
Event
Description:
On September 11, 1992, at 0820 PDT, data required by TS 4.11.2.6 was I
collected from the GDTs.
The shift chemistry & radiation protection (C&RP) technician is assigned the responsibility for taking the daily GDT readings during the dayshift. The technician normally follows a morning routine, which includes monitoring of the GDTs. On the morning of September 12, 1992, the technician went to sample the Unit 2 steam generators (SGs)(AB)(HX), as well as the GDTs. When the technician went to sample the Unit 2 SG, he found the area was secured due to floor painting and would be reopened in the afternoon. The technician then went to complete other assigned duties, and planned to come back later in the afternoon to complete the Units 1 and 2 GDT surveillance.
On September 12, 1992, at 1420 PDT, the time limit for the surveillance required by TS 4.11.2.6, including the allowed extension 10605/85K
LICENSEE EVENT REPORT (LER) TEXT CONTINUATION 197437
,.n o,, - m
-, n,.,.. m u....,.,
.., m nas a
su as 4
DIABLO CANYON UNIT 1 0l5l0l0l0l2!7l5 92
- 0l1l7 0l0 3 l'l5
.n, im of TS 4.0.2, was exceeded.
Also, TS 3.11.2.6 action a. was not met when the discharge of radioactive material to the GDT was not immediately stopped.
On September 12, 1992, at 1625 PDT, the TS 4.11.2.6 surveillance was performed and TS 3.11.2.6 was exited.
On September 12, 1992, at. 35 PDT, upon review of the Shift C&RP desk i
log, the Chemistry Foreman discovered that the TS 4.11.2.6 time limit, including the allowed extension of TS 4.0.2, was exceeded by 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and S minutes.
D.
Inoperable Structures, Components, or Systems that Contributed to the Event:
None.
E.
Dates and Approximate Times for Major Occurrences:
1.
September 11, 1992; at 0820 PDT:
TS 4.11.2.6 surveillance i
requirements were satisfied.
2.
September 12, 1992; at 1420 PDT:
Event Date. TS 3.11.2.6 action a. not met.
3.
September 12, 1992; at 1625 PDT:
TS 4.11.2.6 surveillance was performed and TS 3.11.2.6 was exited.
4.
September 12, 1992; at 1655 PDT:
9iscovery Date.
The Chemistry For..an discovered that the TS 4.11.2.6 surveillance time limit had been exceeded.
F.
Other Systems or Secondary functions Affected:
None.
G.
Method of Discovery:
i l On September 12, 1992, at 1655 PDT, while reviewing the Shift C&RP desk log, the Chemistry Foreman discovered that the TS 4.11.2.6 time limit, including the allowed extension of TS 4.0.2, was exceeded by 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and 5 minutes.
H.
Operator Actions:
None.
10605/85K l
107407 LICENSEE EVENT REPORT (LER) TEXT CONTINUATION j
FACIL117 mAmt (3)
DOCRE1 BAMBLA (2)
Lf p enmet e 16)
- AGE (3) _
3
~3 w
0l0 4 l 'l 5 DIABLO CANYON UNIT 1 0l5l 0 l 0l 0 l 2 l 7 l 5 92
- 0l1l7 Ytst (17)
I.
Safety System Responses:
Not Applicable.
III. Cause of the Event A.
Imediate Cause:
The C&RP technician failed to perform the TS 4.11.2.6 surveillance within the required time limit.
B.
Root Cause:
The root cause of this event was inadequate shift chemistry technician turnover checklist instructions. The instructions on the checklist specified that the surveillance was to be performed daily and did not specify that the surveillance was to be performed at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> as required by TS 4.11.2.6.
IV.
Analysis of the Event Radiation monitors (IL)(MON) are installed on each GDT to provide alarms in the auxiliary building control room (NF) and the main control room (NA) in the event that the quantity of radioactivity in the GDTs approaches the limit of 100,000 curies of noble gas (as Xenon-133 equivalent).
If the limit is exceeded, all gaseous additions to the GDTs will be imediately suspended, and the GDT contents will be reduced to the allowed limit within i
48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, as required by TS 3.11.2.6 action a.,
The Unit I reactor coolant system (RCS)(AE') noble gas radioactivity source
' rm was approximately 91 curies (as equivalent Xenon-133) and the Unit 2 RCS noble gas radioactivity source term was approximately 505 curies (as equivalent Xenon-133). Therefore, even if the entire noble gas inventory of both units were transferred to a single GDT, the total combined radioactivity would not have exceeded approximately 600 curies (as equivalent Xenon-133), or less than 1 percent of the limit specified in TS 3.11.2.6.
Thus, the missed GDT surveillance did not adversely affect the health and safety of the public.
V.
Corrective Actions 1
A.
Imediate Corrective Actions:
1.
The C&RP technician was counseled on the time requirements of TS 4.11.2.6.
1060S/85K
LICENSEE EVENT REPORT (LER) TEXT CONTINUATION 197437*
,.a a,, - m man -n m u.
.. m DIABLO CANYON UNIT 1 0l5l0l0l0l2l7l5 92
- Olll7 0l0 5 l*l5 un un 2.
The shift chemistry technician turnover checklist was revised to state:
"GDT dose rates and pressure readings in accordance with TS 4.11.2.6 and CAP D-18 required once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 11 hour."
B.
Corrective Actions to Prevent Recurrence:
CAP 0-18 will be revised to explicitly state the 24-hour time requirement as required by TS 4.11.2 6.
VI.
Additional Information A.
Failed Components:
None.
B.
Previous LERs on Similar Problems:
1.
LER l-88-001-00, " Failure to Perform Plant Vent Air Sampler Flow Estimate Required by Technical Specification 3.3.3.10 due to Personnel Error" The cause of this event was personnel error in that a technician failed to perform actions identified in Administrative Procedure (AP) A-10lS1, " Relieving the Watch." To prevent recurrence, the individual was counseled and the event was reviewed with all chemistry technicians.
Because this event did not involve the chemistry technician turnover checklist instructions or 3
ambiguities associated with the word " daily", the corrective actions did not prevent the current LER.
2.
LER l-90-013-00, " Missed Reactor Coolant System Sample due to Personnel Error" The cause for this event was personnel error in that samples required by TS 4.4.8 were not identified to the oncoming midnight shift technician as required by AP A-10lSI.
To prevent recurrence, the shift C&RP technicians were counseled and AP A-10lS1 was revised.
Because this event did not involve the chemistry technician turnover checklist instructions or ambiguities associated with the word " daily", the corrective actions did not prevent the current LER.
10605/P5K
--