[f:-
'~
Georg,a Power Company,:
4 40 invemess Center Parkway Post Offce Box 1295 '
jIl Bumirvpam, Alabama 35201 Telephone 205 877 7122 1
L C. K. McCoy Georgia Power vee Preseerg Nudu Vog+1e Ptos:ct August 11, 1993 LCV-0109 Docket Nos. 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
l=
~!
VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT Enclosed are the July 1993 monthly operating reports for Vogtle Units I and 2. These reports are submitted in accordance with Technical Specification 6.8.1.5.
Sincerely, C. K. McCoy CKM/JLIlgmb -
Enclosure cc: Georgia Power Company Mr. J. B. Beasley, Jr.
Mr. M. Sheibani '
-NORMS U. S. Nuclear Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. D. S. Hood, Licensing Project Manager, hRR Mr. B. R. Bonser, Senior Resident Inspector, Vogtle
[
L
.. g, 9308170228 930731' h
PDR :ADOCK 05000424 j
b g
} R; PDR.
n
[
ENCLOSURE 1 VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 MONTHLY OPERATING REPORT FOR JULY 1993 TABLE OF CONTENTS NARRATIVE REPORT Page V1-1 OPERATING DATA REPORT Page VI-2 AVERAGE DAILY POWER LEVEL Page VI-3 f
UNIT SHUTDOWNS AND POWER REDUCTIONS Page VI-4 b
I I
1 t
?
i
?
i i
NARRATIVE REPORT DOCKET NO. 50-424 UNIT 1 DATE:
AUGUST 2,1993 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706) 826-4104 j
- 1 JULY 01 00:00 UNIT 1 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.
= JULY 28 23:50 UNIT 1 AUTOMATIC TRIP DUE TO LOW PRESSURIZER PRESSURE SIGNAL.
JULY 29 00:00 UNIT 1 STABLE IN MODE 3.
JULY 29 14:53 UNIT 1 IN MODE 2.
JULY 29 16:07 UNIT 1 CRITICAL.
JULY 29 18:58 UNIT 1 IN MODE 1.
JULY 29 21:46 UNIT 1 TIED TO GRID.
JULY 30 04:32 UNIT 1 HOLDING AT LESS THAN 50% POWER FOR NI RECAllBRATION DUE TO QUADRANT POWER TILT.
JULY 31 01:40 UNIT 1 INCREASING POVER TO 80%.
= JULY 31 06:16 UNIT 1 HOLDING AT LESS THAN 80% POWER FOR NI RECALIBRATION DUE TO QU ADRANT POWER TILT.
JULY 31 21:04 UNIT 1 INCREASING POWER.
JULY 31 23:59 UNIT 1 AT 92% POWER, CONTINUING POWER ASCENSION.
+
t b
b L
V1 a.
]
i
- OPERATING DATA REPORT DOCKET NO. 50-424 J
DATE:
AUGUST 2,1993 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706) 826-4104 i
OPERATING STATUS
- 1. UNIT NAME:
VEGP UNIT 1
- 2. REPORT PERIOD:
JULY 1993
- 3. LICENSED THERMAL POWER (MWt):
3565
- 4. NAMEPLATE RATING (GROSS MWe):
1215 i
- 5. DESIGN ELECTRICAL RATINC (NET MWe):
1151
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
1212
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):
1158
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
N/A
- 9. POWER LEVEL TO WHICH RESTRICTED,IF ANY (NET MWe):
NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION. IF ANY:
N/A.
THIS MONTH YR. TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
744 5087 54072
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL:
727.7 4000.2 '
'46202.1
'i I
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0 -
- 14. HOURS GENERATOR ON-LINE:
722.1 3905.0 45199.9
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0 l
'16. GROSS THERMAL ENERGY GENERATED (MWH):
2499130 13291444 150660347
- 17. GROSS ELEC. ENERGY GENERATED (MWH):
842344 4524657
.50505642
[
- 18. NET ELEC. ENERGY GENERATED (MWH):
805744 4314977 47955942 19; REACTOR SERVICE FACTOR ^
97.8 %
-78.6%
85.4%.
- 20. REACTOR AVAILABILITY FACTOR 97.8 %
78.6 %
85.4%
- 21. UNIT SERVICE FACTOR:
97.1% -
76.8%
83.6%
- 22. UNIT AVAILABILITY FACTOR:
97.1 %
76.8%
83.6 %
- 23. UNIT CAPACITY FACTOR (USING MDC NET):
93.5% '
74.6 %
81.2 %
- 24. UNIT CAPACITY FACTOR (USING DER NET):
94.1 %
75.1 %
80.4%
- 25. UNIT FORCED OUTAGE RATE:.
2.9%
2.4%'
6.0%
' 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
NONE
-27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTLP:
N/A
. V1-2 E
~...
UNIT 1 AVERAGE DAILY DOCKET NO. 50-424 POWER LEVEL DATE:
AUGUST 2,1993 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706) 826-4104 DAY Net MW 1
1158
- 2..
1157 3..
1151 4.
1154 5..
1153 6,
1155 l
7.
1157 8..
1158
- j 9.
1154 10...
1152 11 1153 12.
1154
-f 13..
1155 14.
1153
. 7 15..
1154 16.....
1155 17..
1154 l
18.
1153 19.
1152 20..
1151
- 21...
1149 22...
1152 23...
1153 24.....
1152' 25..
1154-26.
1154 27.
1169 *'
28..
-1095 29.
0 30.
471 31 846
V1-3 1
4
t UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-424 DATE:
AUGUST 2,1993 UNIT NAME:
VEGP UNIT 1 COMPLETED BY: G. L HOOPER TELEPHONE:
(706) 826-4104 REPORT MONTH JULY 1993
_-r a
R M
S i
E E
Y T
A T
LICENSEE SC Y
S H
EVENT TO COMPONENT CAUSE & CORRECTIVE P
DURATION: O O
REPORT E D.
CODE ACTION TO NO.
DATE E
(HCURS)
N D
NUMBER ME (SUBCODE)
PREVENT RECURRENCE =
_ _J___
l
~_.__
3 l 1-93-09 JE PT SEE BELOW 93-5 7/29 F
21.9 G
i L
._L F: FORCED REASON:
METHOD:
EVENTS REPORTED INVOLVE i
S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20% -
B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE.
C-REFUELING 3 - AUTO. SCRAM
. DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEDING 24 HOURS.
E-OPERATOR TRAINING & LICENSE
'S - LOAD REDUCTION.
3 F-ADMINISTRATIVE-9 - OTHER (EXPLAIN)
G-OPERATIONAL ERROR (EXPLAIN)
H-OTHER (EXPLA!N) 5 CAUSE;-
THE AUTOMATIC REACTOR TRIP ON UNIT ONE RESULTED FROM A LOW PRESSURIZER PRESSURE SIGNAL -
l GENERATED DURING MAINTENANCE ON THE PT-457 PRESSURIZEP D."IS"URE TRANSMITTER.
WHILE RETURNING THE TRANSMITTER TO SERVICE, PRESSURE WAS DROPPED IN THE SENSING LINE -
WHICH IS SHARED WITH TRANSMITTER PT-458. THIS TRIPPED THE PT-458 BISTABLE FOR LOW PRESSURIZER PRESSURE.. SINCE THE BISTABLE FOR PT-457 WAS ALREADY TRIPPED, THE REQUIRED TWO OF 4 LOGIC FOR A REACTOR TRIP WAS SATISFIED.
CORRECTIVE ACTION:
MAINTENANCE ON PT-457 WAS COMPLETED AND THE UNIT WAS RETURNED TO SERVICE.
t e
V1 V.
I
i l
I ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTHLY OPERATING REPORT FOR JULY 1993 TABLE OF CONTENTS NARRATIVE REPORT Page V2-1 OPERATING DATA REPORT Page V2-2 t
i AVERAGE DAILY POWER LEVEL Page V2-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page V2-4 b
l
?
'i 9
5 i.
j
- i
,\\
g
^
~
NARRATIVE REPORT DOCKET NO. 50-425 UNIT 2 DATE:
AUGUST 2,1993 t
COMPLETED BY: G. L HOOPER TELEPHONE:
(706) 826-4104
?
t l
l JULY 01 00:00 UNIT 2 AT 99% POWER WITH NO OPERATIONAL PROBLEMS.
- l
, JULY 31 23:59 UNIT 2 AT 99% POWER WITH NO OPERATIONAL PROBLEMS.
1 f'
-f t
i
?
I t
6 f
r t
4-i
?
f a
I i
V2-1 e
-_._c
i:
i 4
OPERATING DATA REPORT DOCKET NO. 50-425 DATE:
AUGUST 2,1993 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706) 826-4104 e
o OPERATING STATUS
- 1. UNIT NAME:
VEGP UNIT 2
- 2. REPORT PERIOD:
JULY 1993
- 3. LICENSED THERMAL POWER (MWI):
3565
- 4. NAMEPLATE RATING (GROSS MWe):
1215
- 5. DESIGN ELECTRICAL RATING (NET MWe):
1151
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
1211
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):
1157
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS N/A (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION,IF ANY:
N/A THIS MONTH YR. TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
744 5087 36816
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL:
744.0 5068.4 33314.3
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE:
744.0 5063.7 32851.3
' 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0 :
- 16. GROSS THERMAL ENERGY GENERATED (MWH):
2629330 17427698 107916046x
,17. GROSS ELEC. ENERGY GENERATED (MWH):
886543 5982244
.36567520'
- 18. NET ELEC. ENERGY GENERATED (MWH):
846833 5713484 34780060
- 19. REACTOR SERVICE FACTOR 100.0 %
99.6 %
90.5%
- 20. REACTOR AVAILABluTY FACTOR 100.0 %
99.6%
90.5% -
- 21. UNIT SERVICE FACTOR:
100.0 % -
99.5%
89.2%
- 22. UNIT AVAILABILITY FACTOR:
100.0 %
99.5%
89.2%
- 23. UNIT CAPACITY FACTOR (USING MDC NET):
98.4%.
99.8%
85.5%
. 24. UNIT CAPACITY FACTOR (USING DER NET):
98.9 %
100.0%
85.6%
- 25. UNIT FORCED OUTAGE RATE:
0.0%
0.5%
1.7%
- 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH);
REFUELING, SEPTEMBER 11,1993,37 DAYS
- 27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NA
- j.
V2-2
-l
(;
4
j UNIT 2 AVERAGE DAILV.
DOCKET NO. 50-425 POWER LEVEL DATE:
AUGUST 2,1993 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706) 826-4104 l
3
[.
e DAY Net MW l
1 1138 2..
1141 1133 3.
4.
1135 5.
1136 6.
1140 7.
1143 8.
1143 9.
1140 10...
1136 11...
1137
- 12.........
1137 13.
1139 1140 14.
15.
1137 16.
1139 17, 1133 1136 18..
19.
'1137 20.
1135 21....
1135 22.
1139 23.
1139 i
24..
~1140 25.
1137 26.
1138 27.
1138 28.
1136 29....
1138-30.
1143 i
31...
1149 5
4 1
V2-3 '
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-425 DATE:
AUGUST 2,1993 UNIT NAME:
VEGP UNIT 2 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706) 826-4104 r
REPORT MONTH JULY 1993 R
M S
E E
Y i
T A
T LICENSEE SC Y
S H
EVENT TO COMPONENT CAUSE & CORRECTIVE P
DURATION O O
REPORT ED CODE ACTION TO NO.
DATE E
(HOURS)
N D
NUMBER ME (SUBCODE)
PREVENT RECURRENCE 7
i
)
NA NA NA NA NA NA NA NA NA NA L__ ___i,_ _ l
+
F: FORCED REASON:
METHOD:
EVENTS REPORTED INVOLVE '
S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATERTHAN 20%
B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEDING 24 HOURS.
E-OPERATOR TRAINING & LICENSE 5-LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)
G-OPERATIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN) i t
4
4
-i
^
ENCLOSURE 3 i
i VOGTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 i
MONTHLY OPERATING REPORT FOR JULY 1993 i
i CHALLENGES TO PORV OR SAFETY VALVES i
i I
1 i
I i
I
-1 1
u l
r
+.
z t
(ENCLOSURE 3)
DOCKET NOS. 50-424,50-425 VEGP UNITS 1 & 2 DATE:
AUGUST 2,1993 COMPLETED BY: G. L. HOOPER TELEPHONE:-
(706) 826-4104 i
l EVENT y
DATE TAG NO.
TYPE DESCRIPTION NO EVENTS FOR JULY.
t
[
4