Forwards IE Insp Rept 50-373/82-25 on 820419-0521 & Notice of Violation
ML20054J589
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 06/09/1982
From: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20054J590 List:
References
NUDOCS 8206290303
Download: ML20054J589 (2)


See also: IR 05000373/1982025

Text

.

. ~.

.

. _ .

.

h,

JUN 9

1982

x

%

Docket No. 50-373

Commonwealth Edison Company

ATIN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Messrs.

R. Lanksbury, F. Maura and D. Robinson of this office on April 19-23,

27-30, May 6, 7, 11, 13-18 and 21, 1982, at the LaSalle County Nuclear

Station, Unit 1, authorized by NRC Operating License No. NPF-ll and to

the discussion of our findings with Mr. R. Bishop and others of your

staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

,

observations, and interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in the enclosed Appendix.

,

A written response is required.

It is our understanding that your Station Nuclear Engineering Department

will review and approve all completed Startup Test. Procedures at the com-

pletion of each Test Condition, as defined in the FSAR, and prior to

!

proceeding with testing at the next Test Condition.

In your response to

l

this letter please confirm if our understanding is correct.

l

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of'

l

this letter, the enclosures, and your response to this letter will be placed

in the NRC's Public Document Room.

If _this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

i

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office to

j

withhold such information.

If your receipt of this letter has been

4

i

delayed such that less than seven (7) days are available for your review,

!

please notify this office promptly so that a new due date may be estab-

}

lished. Consistent with Section 2.790(b)(1), any such application must

l

8206290303 820609

.

gDRADOCK05000

g

.

_. ,

_

- . -

_

_

_

_

__

.-

O

Commonwealth Edison Company

2

Jt!N 9

1982

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter, the enclosures,

'and your response to this letter will be placed in the Public Document

Room.

The responses directed by this letter (and the accompanying Notice) are

not subject to the cicarance procedures of the Office of Management and

Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

isjpu w Jdfiatu

W. S. Little, Chief

Engineering Inspection Branch

Enclosures:

1.

Appendix, Notice

of Violation

2.

Inspection Report

No. 50-373/82-25(DETP)

cc w/encls:

Louis 0. De1 George, Director

of Nuclear Licensing

R. Cosaro, Site Construction

Superintendent

T. E. Quaka, Quality

Assurance Supervisor

R. II. IIolyoak, Station

Superintendent

B. B. Stephenson, Project Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Karen Borgstadt, Office of

Assistant Attorney General

RI0'

RIII

RI

RIII

u.9ra jp

>

1

en.

Mau

' ackiw

Walker

Little

6/7/82

-

_

__