ML20053B159
| ML20053B159 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 05/04/1982 |
| From: | Reeves E Office of Nuclear Reactor Regulation |
| To: | Clayton F ALABAMA POWER CO. |
| Shared Package | |
| ML20053B160 | List: |
| References | |
| NUDOCS 8205280127 | |
| Download: ML20053B159 (3) | |
Text
_
n
~
DISTRIBUTION Docket NRC PDR L PDR NSIC M/,Y 0 41982 ORB #1 Rdg DEisenhut Docket Hos. 50-148 ORAB and 50-364
'e i s CParrish
/
EReeves(2) f D
OELD Mr. F. L. Clayton E
P40 9
Barnhart-8 Senior Vice President NAVJ g ACRS-10 Alabame Power Company
{. " g "u %
2A OPA n
Post Office Box 2641 g/p D
SECY Bimingham, Alabama 35291 RDiggs
+
JHeltemes m
Gray
Dear Mr. Clayton:
StSJECT: EXEMPTION REQUEST - FIREPPROTECTION RULE SCHEDULAR REQUIREMENTS OF 10 CFR 50.48(c) - JOSEPH M. FARLEY NUCLEAR PLANT, UNITS NO.
1 AND 2 i
The Fire Protection Plan, (10 CFR 50.48) published on November 19, 1980, became effective on February 17, 1981, and required the results of certain tasks to be submitted to the Nuclear Regulatory Commission (NRC) by Parch 19, 1 981. By letters dated June 23, 1981 and January 28, 1982, you applied for exemption from some of these schedular requirements of 10 CFR 50.48(c).
The exemption requested related to the time allowed to complete a reassessment of the fire protection features at your plant for confomance to the specific requirements of Section III.G of Appendix R to 10 CFR 50: to evaluate the difference determined for each area; and to design modifications to meet the requirements or provide a justifiable basis by means of a fire hazards analysis for an exemption from such requirements. For reasons as stated in your exemption request, you requested additional time to complete the above reassess-ments, evaluationn,and designs. By letter dated April 20, 1982, you revised your request.
The Commission has granted your request as desdribed in the enclosed exemption l
j (Enclosure 1). The exemption is conditional upon a requirement that the sutrnittal be complete, as defined in the exemption. If the NRC snould detemine l
that your sutmittal is not complete, you will be found in violation of l
10 CFR 50.48(c). Such a violation will be a continuing one from the date ce l
granted by the exemption and a civil penalty may be imposed for each day the l
viblation continues.
A copy of this exenption is being filed with the Office of the Federal Rep ar for publication. provides a rewording of the request for infomation included with generic letter 81-12. This rewording is the result of meetings with represen-tative licensees who felt that clarification of the request would help expedite responses. It does not include any new requests and, therefore, will not adversely affect licensees' ability to respond to generic letter 81-12.
F0".tWF
~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ " ~
omce >
~ ~ - - ~ ~ ~ - ~ ~
" - - - ~ - -
....g.0'5'2
.............. ~..
. - ~ ~ ~ ~ ~.. ~ ~
~ ~ ~ ~ ~ ~ - -
~ ~ ~ ~ ~ ~ ~ ~ ~
~
~ ~~
suanme >
~ ~~~~~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ - ~ ~ ~ ~ ~ -
[
ouey
~ ~ ~. ~ ~ - -
OFFICIAL RECORD COPY uso m i,u - as e.
wnc rORM 3t8 00-80) NRCM Ono
t!
/
Pr. F. L. Clayton Enclosure 3 provides information regarding our criteria for evalmting exemption requests from the requirements of Section III.G.2 of Appendix R if your should find these necessary.
Sincerely, ORIGINAL SIGNED Edward A. Reeves. Pro. ject Manager Operating Reactors Branch #1 Division of Licensing
Enclosures:
As stated cc w/ enclosures:
See next page
/
i s
l l
l k*'
d '_
\\
t go l' h " g, ' gp\\
~
d(dr/
- 4 9
N3**,$0 qt h.s puta,.
,l 4/Q$/92 O,k t" h
\\
ORB #,:DL,~)
ora #3-RBAT:
AD/.OR:
OELDy D/ lp
....../ N D
....+./...[.
../..
.......k,.........
OFFICE) co - > ER eve,,(,:,r
, TVam}ba c,,,,,S,,r,a,,,,,7,,,,T,,,,,,,,,,,,,,,,,,,,,,,,,,,,/,8,82 phu t,,,,,,,H
,,,n,,,,,,
.Q4./h.R. 2....
. 04../f.f/.8..2......
..'4/;
82 7
04/2 04fg,/82
/..p /82 04/g/"2 ocre >
v
~
nnc ronu m oo-m sacu em OFFICIAL RECORD COPY usaro.im m mo
Mr. F. L. Clayton Alabana Power Company cc: Mr. W. O. Whitt D._Biard MacGuineas. Esquire Executive Vice President Vcipe, Boskey and Lyons Alabama Power Company 918 16th Street, N.W.
Post Office Box 2641 Washington, D.C.
20006 Birmingham, Alabama 35291 Charles R. Lowman Ruble A. Thomas, Vice President Alabama Electric Corporation Southern Company Services, Inc.
P.O. Box 550 Post Office Box 2625 Andalusia, Alabama 36420 Birmingham, Alabama 35202 Mr. R. P. Mcdonald George F. Trowbridge, Esquire Vice President - Huclear Generation Shaw, Pittman, Potts and Trawbridge Alabama Power Company 18n0 M Street. N.W.
P.O. Box 2641 Washington, D. C.
20036 Birmingham, Alabama 35291 Chairman James P. O'Reilly Houston County Commission Regional Administrator - Region II Dnthan, Alabama 36301 U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Robert A. Buettner, Esquire Atlanta, Georgia 30303 Balch, Binghan, Baker, Hawthorne, Williams and Ward Post Office Box 306 Birminoham, Alabana 35201 George S. Houston Memorial Library 212 W. Burdeshaw Street Dothan, Alabama 36303 Resident Inspector U. S. Nuclear Regulatory Commission Post Office Box 24-Route 2 Columbia, Alabama 36319 State Department of Public Health ATTN:
State Health Officer State Office Buildino Montgomery, Alabama 36104 Renional Radiation Representatives EPA Region IV 345 Courtland Street, N.E.
Atlanta, Georgia 30308
_