ML20052F663
| ML20052F663 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 05/05/1982 |
| From: | Vassallo D Office of Nuclear Reactor Regulation |
| To: | Pilant J NEBRASKA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20052F664 | List: |
| References | |
| NUDOCS 8205130344 | |
| Download: ML20052F663 (2) | |
Text
i' ~
<M
- W gt..
,W MAY 0 51982 k
'2-DISTRIBUTI0ft:
DEisenhut Gray File Docket File Silorris IAhmed JVanVliet RDiggs
[%~
f4RC PDR L PDR BSiegel CMiles ORB #2 Rdg OELD ASLAB s
Docket tio. 50-298 AE0D TBa rnhart-4 IE LSchneider
- C ACRS-10 DBrinkman g
Mr. J. M. P11 ant Director C
+
J Licensing & Quality Assurance g
liebraska Public Power District
\\
V P. O. Box 499 o3 Columbus, fiebraska 60601
Dear Mr. Pilant:
Subject:
Reactor Protection System Power Ibnitoring Systen Design flodifi-cations Re:
Cooper fluclear Station We have corpleted our review of the subject nodification for your facility.
Our review was based on your past subnittals as referenced in the enclosed Safety Evaluation. We find your pmposed design nodifications and the Technical Specification changes you intend to subnit, as described, to be acceptable.
It is our understanding that the modification will be complete by the end of your 1982 refueling outage, and that pmposed Technical Specifications in the fom of a mauest for rodification of your license will be submitted once the time delays have been selected and verified by General Electric.
If this understanding is not correct, please notify us within 30 days of the date of this letter.
This completes our review of this issue except for your forthcoming Technical Specification submittal which should confom to the appropriate guidance contained in the Safety Evaluation and the enclosed Technical Evaluation Report. Please include in this submittal a reference to this letter, and a statement to the effect that General Electric has verified the time i
delays.
If you have any questions on this natter, please contact your Project!!anager.
Sincerely,
- m $ned ti en c assaH o, N ef 9205130344 820505 Operating Reactors Branch #?
PDR ADOCK 05000298 P
PDR Division of Licensing
Enclosures:
1.
Safety Evaluation 2.
Technical Evaluation Report
,gxtpage ORM:.QL........C.055R:.0.L..
.... fG2 :..'"C1gsu..
CC "/
Se 1
o, nc, y OR DL)
', ORB '.
ORB #2:h. IAhmed b DVassallo 5"=+.-
BSi~ set /dF" JVaVi VTitt"" 574 782""*" "5...[.[...
5..'""..".".".
s/8."82.......
/
- 2...
oer>
5, *,g2..
nac ionu na pao > sacu o:4a OFFICIAL RECORD COPY use mi-.mm
. ~..
g
^
g Mr. J..M. Pilant Nebraska Public Power District k
d j
cc:
Mr. G. D. Watson, General Counsel Nebraska Public Power District P. O. Box 499 Columbus, Nebraska 68601 Mr. Arthur C. Gehr, Attorney Snell & Wilmer l
3100 Valley Center Phoenix, Arizona _ 85073
. Cooper Nuclear Station ATTN: Mr. L. Lessor Station Superintendent P. O. Box 98 Brownville, Nebraska 68321 N
Auburn Public Library e
118 - 15th Street d
Auburn, Nebraska 68305
.4 Mr. Dennis Dubois USNRC Resident Inspector P.O. Box 218 Brownville, NE 68321 John T. Collins Regional Administrator, Region IV U.S. Nuclear Regulatory Comission 611 Ryan Plaza Drive Suite 1000 1
Arlington, Texas 76011 4
-