ML20052A574

From kanterella
Jump to navigation Jump to search
Second Interim Deficiency Rept Re Pipe Supports Attached to 6-inch Strip Plates,Initially Reported 811231.Attachments Under Review to Determine If Stresses & Deflections Exceed Allowable Limits.Next Rept to Be Submitted by 820802
ML20052A574
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 04/16/1982
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8204280472
Download: ML20052A574 (2)


Text

(

i r

o TENNESSEE VALLEY AUTHoggYarg* g.

CH ATT A NGOG A, TEN N FSS FE ' 7.101~

I 3

400 Chestnut Street Tower II April 16 $h2b A0*

BLRD-50-438/82-07

=

G\\

j @,

BLRD-50-439/82-07

\\

'/

,~

f 4'

l h

//

A, 'k8 h-d

, 'I>,

,c U.S. Nuclear Regulatory Commission Q

77 Region II Attn:

Mr. James P. O'Reilly, Regional Administrator jP e 4 f 'V

?

g 101 Marietta Street, Suite 3100 e5.g v y

k "j$r V

Atlanta, Georgia 30303 D

P

Dear Mr. O'Reilly:

BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - ATTACHMENT OF PIPE SUPPORTS TO 6-INCH STRIP PLATES - BLRD-50-438/82-07, BLRD-50-439/82 SECOND INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector R. V. Celenjak on December 31, 1981 in accordance with 10 CFR 50.55(e) as NCR BLN BLP 8133 This was followed by our first interim report dated January 29, 1982. Enclosed is our second interim report. We expect to submit our next report by August 2, 1982.

If you have any questions concerning this matter, please get in touch with R. H. Shell at FTS 858-2688.

Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nuclear Regulation and Safety Enclosure oc:

Mr. Richard C. DeYoung, Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 8204280'l72-T&, +1 w.,

- on n gfp

o

1 a,

ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 ATTACHMENT OF PIPE SUPPORTS TO 6-INCH STRIP PLATES NCR BLN BLP 8133 BLRD-50-438/82-07, BLRD-50-439/82-07 10 CFR 50.55(e)

SECOND INTERIM REPORT Description of Condition Six-inch wide embedded strip plates with a single row of 3/4-inch diameter Nelson studs were provided in the Reactor Building for the attachment of instrumentation and conduit supports. However, because design drawings did not restrict their use, ITT Grinnell pipe supports and TVA typical seismic pipe supports may have been installed attached to the strip plates.

Because of the physical configuration of the embedments, the potential for excessive stress and deflection exists.

Interim Progress TVA has finished a walkdown in the Reactor Building and submitted a -listing of all supports attached to the subject embedded plates. A total of 147 attachments have been identified. TVA is reviewing the attachments to ascertain if stresses and deflections are within allowable limits.