4
{
JUL 191993
Docket Nos. 50-317
50-318
Mr. Robert E. Denton
Vice President - Nuclear Energy
,
'
Baltimore Gas and Electric Company
Calvert Cliffs Nuclear Power Plant
1650 Calvert Cliffs Parkway
Lusby, Maryland 20657 - 4702
Dear Mr. Denton:
SUBJECT:
NOTICE OF VIOLATION NRC INSPECTION REPORT NOS. 50-317/93-18
AND 50-318/93-18
'
This refers to the announced safety inspection conducted by Mr. A. Finkel of this office
from June 21 - 25,1993. The inspection included a review of material control activities
authorized for your Calvert Cliffs Nuclear Power Plants Units 1 and 2. At the conclusion of
the inspection, the findings were discussed with those members of your staff identified in the -
enclosed report.
Areas examined during this inspection are described in the NRC Region 1 Inspection Report,
which is enclosed with this letter. Within these areas, the inspection consisted of selective
examinations of procedures and representatives records, interviews with personnel, and
observations of activities in progress. The purpose of the inspection was to deteimine
whether activities authorized by the license were conducted safely and in accordance with
NRC requirements.
Based on the results of this inspection, certain of your activities appear to be in violation of
NRC requirements, as specified in the enclosed Notice of Violation (Notice). The violation
is of concern because the quality assurance program should have identified that the plants
" Drop Off" areas were not conforming to the requirements of your Calvert Cliffs Instruction
(CCI)-162, " Procurement and Control of Items and Services for Calvert Cliffs." You are
required to respond to this letter and should follow the instructions specified in the enclosed -
Notice when preparing your response. In your response, you should document the specific -
actions taken and any additional actions you plan to prevent recurrence.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and
its enclosures will be placed in the NRC Public Document Room.
OFFICIAL RECORD COPY
G:CC931818. INS
9307270054 930719
)
PDR' ADOCK 05000317
s / (n \\
G
y )t
)
l
.
,
1
,,
!
I
Mr. Robert E. Denton
~2
JUL 191993
The responses directed by this letter and the enclosed Notice are not subject to the clearance
]
l
procedures of the Office of Management and Budget as required by the Paperwork Reduction
Act of 1980, Pub. L. No. 96.511.
Sincerely,
1
Original Signed By:
i
'
Lee 11. Bettenhausen
Ixe H. Bettenhausen, Chief
Operations Branch
'i
Division of Reactor Safety
l
Enclosures:
1
1. Appendix A, Notice of Violation
'
2. NRC Inspection Report Nos. 50-317/93-18 and 50 318/93-18
cc w/encls:
G. Detter, Director, Nuclear Regulatory Matters (CCNPP)
'
R. McIzan, Administrator, Nuclear Evaluations
L Walter, Engineering Division, Public Service Commission of Maryland
K. Burger, Esquire, Maryland People's Counsel
{
R. Ochs, Maryland Safe Energy Coalition
K. Abraham, PAO (2)
j
Public Document Room (PDR)
]
1.ocal Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Maryland (2)
1xx: w/encls:
'
Region I Docket Room (with concurrences)
bec w/encls (VIA E-MAIL)
V. McCree, OEDO
R. Capra, NRR
D. Mcdonald, NRR
OFFICIAL RECORD COPY
G:CC931818. INS
0
- j
-
,
.
Mr. Robert E. Denton
3
JUL 191993
(VIA E-MAIL AND NO ATTACIIMENT)
L. Bettenhausen, DRS
N. Blumberg, DRS
A. Finkel, DRS
l
l
l
4
RI:DRS -
RI:DRS
RI:DRS
e
b
Bettenhau
/
FinkJ]d
Blu
A .[,
i %yrg
07/13/93
07/l(/93
07//g93
OFFICIAL RECORD COPY
G:CC931818. INS